Permit: DP14-0200
Permit Details
Status:
Complete
Type:
Development Package
Address:
8005 E SPEEDWAY BL
Address NEW:
8005 E SPEEDWAY BL
Apply Date:
10/31/2014
Applicant:
Michael John Baker
Description:
SITE/GRADING/SWPPP- MESQUITE VALLEY GROWERS 1st Revision approved 7/20/17 (sheet 7)2nd Revisio
Completed Inspections
Permit Status: Complete
Permit Number: DP14-0200
Permit Description: SITE/GRADING/SWPPP- MESQUITE VALLEY GROWERS 1st Revision approved 7/20/17 (sheet 7)2nd Revisio
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2016 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/27/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 08/07/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/07/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 04/14/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT LANDSCAPING NOT PER AP PLANS. NEEDS TO PROVIDE AS-BUILT FOR ALL CHANGES OR INSTALL PER AP PLANS,} ; {Activity date: 03/15/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT CHANGES TO AP LANDSCAPE PLANS NEED TO HAVE COT APPROVAL ON REVISION BEFOR FINAL.} | |
| 08/07/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/07/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/30/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 09/09/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 08/31/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/24/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GC NOT ON SITE NO CONCERNAT THIS TIME.} ; {Activity date: 08/05/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 07/05/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ACTIVITY ON SITE.} ; {Activity date: 03/23/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS ON SITE.} | |
| 08/07/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 08/07/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 08/07/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/07/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 08/10/2017 | ENGR Engineering Final | Passed | {Activity date: 08/10/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/07/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE CERT LETTER FOR ALL GRADING AND DRAINAGE FROM THE ENGINEER OF RECORD. HAVE AP BUILDING PLANS ON SITE FOR ROOF DRAINS ON SOUTH WEST SIDE OF NEW BUILDING.} ; {Activity date: 07/22/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 08/10/2017 | ENGR Grading Final | Passed | {Activity date: 08/10/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |