Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/07/2017 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 08/07/2017 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 04/14/2017 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - WALKED THROUGHT THE SITE TO SEE WHERE THEY ARE IN REGARDS TO THE COMPLETION OF THE SITE. THE PROJECT IS CLOSE TO BEING COMPLETED, AND MAY BE DONE IN THE NEXT FEW WEEKS. I HAVE ADVISED THE OWNER DURING THIS SITE VISIT THAT THE LANDSCAPING IS NOT PER THE APPROVED PLANS AND WILL NEED REVISIONS TO BE SUBMITTED AND APPROVED SHOWING THE CURRENT LAYOUT OF ALL THE PLANTS AND TREES AT THIS TIME BEFORE WE WILL BE ABLE TO ACCEPT THIS SITE.
I AM ALSO LOOKING AT THE SITE TO SEE ABOUT THE ADA COMPLIANCY OF A SECTION OF SIDEWALK LOCATED ON THE NORTH SIDE OF THE NEW BUILDING. I HAVE CHECKED THE AREA OUT AND FOUND THAT THE CROSS SLOPES OF THE SIDEWALKS IN QUESTION VARY FROM 2.5% TO 3.5% FOR THE CROSS SLOPES.
I WILL TRY TO SET DOWN WITH STEVE SHIELDS AND CLAYTO TO DISCUSS THIS SITE AND MAKE A DETERMINATION IN REGARDS TO THESE ISSUES. |
| 03/16/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC TO DROP OFF LOW WATER USE LIST. |
| 01/30/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WETH GC ABOUT REVSION ON NORTH SIDE OF SITE. |
| 11/21/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ABOUT PROVIDING AS-BUILT FOR ALL CHANGES TO AP PLANS BEFORE FINAL. |
| 11/07/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED SITE WITH GC. HE NEEDS TO PROVIDE REVIONS FOR ALL CHANGES TO THE AP PLANS. |
| 11/01/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME. |
| 10/04/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER SIDE WALKS ON NORTH SIDE OF BUILDING OVER 2% CROSS SLOPES AND WORK THAT NEEDS TO BE COMPLTE . |
| 07/22/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - STROM WATER PIPING PER RED LINES TO BE COT AP AS-BUILTS BY FINAL INSPECTION. |
| 06/24/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - METWITH GC ABOUT SIDE WALKS AND CROSS SLOPES. |
| 05/27/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - INSTALLING STORM DRAIN PIPING PER RED LINE DRAWINGS. PER LREN MAKUS. TO MAKE CHANGES TO NEXT REVISION. |
| 05/11/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC GAVE TRASH ENCLOUSER HAND OUT. |
| 03/14/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON GRADING . MET WITH GC ABOUT ADDING CONTROLS TO CATCH BASIN ON SPEEDWAY. |
| 08/07/2017 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 07/21/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - TRASH ENCLOUSE REBAR FOR WALL ONLY. |
| 07/15/2016 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |
| 08/10/2017 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |