Permit: DP14-0200

Parcel: Unknown


Addresses:

8005 E SPEEDWAY BL

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
08/07/2017 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
08/07/2017 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
04/14/2017 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - WALKED THROUGHT THE SITE TO SEE WHERE THEY ARE IN REGARDS TO THE COMPLETION OF THE SITE. THE PROJECT IS CLOSE TO BEING COMPLETED, AND MAY BE DONE IN THE NEXT FEW WEEKS. I HAVE ADVISED THE OWNER DURING THIS SITE VISIT THAT THE LANDSCAPING IS NOT PER THE APPROVED PLANS AND WILL NEED REVISIONS TO BE SUBMITTED AND APPROVED SHOWING THE CURRENT LAYOUT OF ALL THE PLANTS AND TREES AT THIS TIME BEFORE WE WILL BE ABLE TO ACCEPT THIS SITE. I AM ALSO LOOKING AT THE SITE TO SEE ABOUT THE ADA COMPLIANCY OF A SECTION OF SIDEWALK LOCATED ON THE NORTH SIDE OF THE NEW BUILDING. I HAVE CHECKED THE AREA OUT AND FOUND THAT THE CROSS SLOPES OF THE SIDEWALKS IN QUESTION VARY FROM 2.5% TO 3.5% FOR THE CROSS SLOPES. I WILL TRY TO SET DOWN WITH STEVE SHIELDS AND CLAYTO TO DISCUSS THIS SITE AND MAKE A DETERMINATION IN REGARDS TO THESE ISSUES.
03/16/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC TO DROP OFF LOW WATER USE LIST.
01/30/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WETH GC ABOUT REVSION ON NORTH SIDE OF SITE.
11/21/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ABOUT PROVIDING AS-BUILT FOR ALL CHANGES TO AP PLANS BEFORE FINAL.
11/07/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE WITH GC. HE NEEDS TO PROVIDE REVIONS FOR ALL CHANGES TO THE AP PLANS.
11/01/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME.
10/04/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER SIDE WALKS ON NORTH SIDE OF BUILDING OVER 2% CROSS SLOPES AND WORK THAT NEEDS TO BE COMPLTE .
07/22/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - STROM WATER PIPING PER RED LINES TO BE COT AP AS-BUILTS BY FINAL INSPECTION.
06/24/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - METWITH GC ABOUT SIDE WALKS AND CROSS SLOPES.
05/27/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - INSTALLING STORM DRAIN PIPING PER RED LINE DRAWINGS. PER LREN MAKUS. TO MAKE CHANGES TO NEXT REVISION.
05/11/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC GAVE TRASH ENCLOUSER HAND OUT.
03/14/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON GRADING . MET WITH GC ABOUT ADDING CONTROLS TO CATCH BASIN ON SPEEDWAY.
08/07/2017 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
07/21/2016 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - TRASH ENCLOUSE REBAR FOR WALL ONLY.
07/15/2016 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 -
08/10/2017 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -