Permit Details

Status:
Complete
Type:
Development Package
Address:
4426 E 22ND ST
Apply Date:
10/07/2014
Applicant:
Lisa Bowers
Description:
GRADING ONLY

Permit Reviews

Permit Number - DP14-0184
Permit Status: Complete
Permit Description: GRADING ONLY
Start Date Submittal Complete Date Status  
10/07/2014 DEV PKG - OK TO SUBMIT (GRADING ONLY) 10/07/2014 COMPLETED Review Details
10/07/2014 GRADING 12/17/2014 COMPLETED Review Details
12/17/2014 GRADING 02/20/2015 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP14-0184
Permit Status: Complete
Permit Description: GRADING ONLY
Total Outstanding Activity Conditions - 2
Date Name
10/09/2014 Conditions shall be addressed during grading construction, prior to CofO and as-built submittal, prior to FPUP & GP final inspection approvals, and for final block plat. Conditions are based on Tucson Code Chapter 26, Unified Development Code, Technical Manual, and Administrative Manual. PERMIT CONDITIONS:1)Finished floor elevation requirements for building shall meet City of Tucson regulations and approved drainage report sealed 8-19-14.2)SWPPP shall be sealed by registrant prior to commencement of disturbance activities.3)Prior to CofO final block plat shall be approved/completed.4)Maintenance access easement improvements shall include grading for traversability, gravel for ground cover, access gate, and driveway apron, which will be inspected for acceptance by TDOT prior to final grading inspection approval.5)Easement sequence numbers shall be provided at as-built and final block plat stage for this project and prior to CofO. This easement condition applies to the revised 1-ft access control easement.6)Type and function of maintenance access easement gate shall be inspected and accepted by TDOT.7)Designated concrete washout locations are required and shall not be located in or near water harvesting areas. Location of temporary material or vehicle staging / stockpile area shall be placed within grading limits and not located in any water harvesting or floodplain areas or near/adjacent to Naylor Wash.8)There shall be no disturbance or activity within the Naylor Wash area. There shall be no vehicle access, storage or any type of disturbance outside of the approved disturbance/grading limits, and no grading shall begin until all required SWPPP controls are installed. Stop Work Order may be issued for disturbance outside of grading limits. Stop Work Order shall be issued if disturbance of Naylor Wash occurs.9)Dust control methods such as water truck will be provided, as well as daily sweeping of public streets.10)Any remaining operator signatures from must be on the site copy of the SWPPP at or before commencement of construction.11)Regarding the SVT's, other than trees as noted below, plant materials located within existing and future sight visibility triangles shall be limited to ground cover or low-growing vegetation of a species that will not grow higher than thirty inches. Trees may be located within existing and future sight visibility triangles only if clear of leaves and branches to a height of at least six feet above grade upon installation, and at all times thereafter. The trunk caliper of any species selected may not exceed twelve inches in diameter at maturity. Trees with multiple trunks are not allowed. Trees may not be planted in a line that could result in a solid wall effect as viewed from the motorist's perspective. The number and location of trees within existing and future sight visibility triangles may be restricted or modified by the City of Tucson Inspectors in order to preserve visibility.12)Contractor is responsible to protect in place any existing utilities; all work within these easements must be coordinated with the proper utilities prior to any site construction. All recordation dkt/pg or sequence numbers shall be listed on subsequent plans for revisions or as-builts.13)Special inspections may be required for the sewer, signage, and water harvesting areas, maintenance access easement improvements.14)Any revision to the Grading Plan may require a re-submittal of a revised grading plan for review. Contact Civil Engineer at the City of Tucson Planning & Development Services Department Engineering Division, to discuss changes in grading design, and to determine whether additional details, calculations, drainage report, or a revised grading plan is needed, or, whether changes may be provided on as-builts. 15)Separate building permit applications are required for any walls.16)Prior to request for final inspection approval, any outstanding fees shall be paid.
12/15/2014 THIS CONDITION SUPERCEDES ALL OTHER REQUIREMENTS OR APPROVALS FOR FINISHED FLOOR ELEVATION REQUIREMENTS PER PDSD ENGINEERING ADMINISTRATOR JIM VOGELSBERG P.E.. CITY OF TUCSON REGULATIONS PRESENTLY DO NOT PERMIT THE FLOODPROOFING OF A NEW STRUCTURE BY ANY METHOD OTHER THAN RAISING THE LOWEST FINISHED FLOOR AT LEAST ONE FOOT ABOVE THE HIGHEST WATER-SURFACE ELEVATION INTERSECTING THE FOOTPRINT OF THE STRUCTURE DURING A BASE (I.E., 100-YEAR OR JURISDICTIONAL) FLOOD. HOWEVER, PER JIM VOGELSBERG P.E. AN EXCEPTION APPLIES TO THIS PROJECT, WHERE, UNDER CERTAIN CIRCUMSTANCES AS ACCEPTED BY THE FLOODPLAIN ADMINISTRATOR, IN AREAS OF NON-SFHA AREAS WHERE JURISDICTIONAL NON-SFHA FLOWS ARE INDICATED AS LESS THAN 1-FOOT, AND FOR COMMERCIAL BUILDINGS LARGER THAN 50,000 SQFT THAT MAY HAVE STEPPED FINISHED FLOORS, EACH FINISHED FLOOR WILL MEET AN ELEVATION THAT IS AT LEAST ONE FOOT ABOVE THE HIGHEST WATER-SURFACE ELEVATION INTERSECTING THE FOOTPRINT OF EACH FINISHED FLOOR. PRE-SLAB & FINAL ELEVATION CERTIFICATIONS, WITH EXHIBITS, PREPARED BY AN ARIZONA REGISTERED LAND SURVEYOR, AND SPECIAL INSPECTIONS ARE REQUIRED PER JIM VOGELSBERG P.E.. THIS CONDITION APPLIES TO INSPECTION 1015 AND SUBSEQUESNT INSPECTIONS SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATION DOCUMENT AND OTHER ASSOCIATED PERMIT CONDITIONS HAVE BEEN APPROVED. PER JIM VOGELSBERG P.E., CERTIFICATION DOCUMENT SHALL INCLUDE ELEVATION OF EACH FORMED PRE-SLAB TO SHOW THAT EACH FLOOR FOR THIS PROJECT WILL BE AT, OR ABOVE HIGHEST REGULATORY WATER-SURFACE ELEVATION INTERSECTING THE FOOTPRINT OF EACH FINISHED FLOOR, WHICH IS 1-FOOT ABOVE THE 100-YR WSEL IMPACTING EACH SLAB (2-FEET ABOVE NATURAL GRADE AT ANY POINT UNDER EACH SLAB). THIS CONDITION ALSO APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND INSPECTIONS SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATION AND ASSOCIATED PERMIT CONDITIONS HAVE BEEN APPROVED. ORIGINAL PRE-SLAB AND FINAL ELEVATION CERTIFICATION STATEMENTS ARE REQUIRED AND SHALL DOCUMENT THE PRE-SLAB AND FINAL ELEVATIONS TO SHOW COMPLIANCE WITH THIS CONDITION AND SHALL BE SEALED BY A REGISTERED LAND SURVEYOR. MAIL ELEVATION CERTIFICATION DOCUMENTAION TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: JASON GREEN OR LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER DOCUMENTATION TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. JASON'S NUMBER IS 837-4929 AND LOREN'S IS 837-4927.

Completed Inspections

Permit Status: Complete
Permit Number: DP14-0184
Permit Description: GRADING ONLY
Total Completed Inspections - 7
Date Description Inspector Results Comments
02/19/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/19/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR HAD AN APPROVED SET OF CIVIL DRAWINGS ON SITE} ; {Activity date: 01/23/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) REPAIR SEDIMENT CONTROLS SOUTH PERIMETER RE-ESTABLISH GRADING LIMIT NEAR WASH
2) NO CONTROLS INSTALLED ALONG SOUTHWEST CORNER, NEED TO APPROVED SWPPP
3) NO CONTROLS ALONG SECTION OF WEST SIDE - EXISTING CURB - OK
4) PROVIDE STORM WATER SELF INSPECTIONS PER YOUR SWPPP
5) SWEEP UP TRACKED SOIL OFF AREAS OUTSIDE PROPERTY LINE
6) ENSURE AN APPROVED SET OF PLANS ON SITE
7) WILL REVIEW NPPO FOR COMPLIANCE WILL RE-INSPECT W/ PLANS}
10/14/2015 SITE - Stormwater Follow-up Passed {Activity date: 10/14/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/21/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE COMPLIANCE WITH YOUR SWPPP UNTIL THE SITE IS 100% STABILIZED} ; {Activity date: 08/11/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/15/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO INSPECTIONS DONE ON INSTALL OF BUBBLER BOX
2) CLEAN OUT BUBBLER BOX PRIOR TO FINAL APPROVAL
3) PROVIDE CERTIFICATION STATEMENT FROM THE ENG OF RECORD
4) STABILIZE EASEMENT NEAR REGULATED WASH
5) PROVIDE ELEVATION CERT
6) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/10/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/09/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NEED TO INSPECT INSTALL OF BUBBLER BOX ALONG THE NORTH SIDE OF BLDG. CALL FOR INSPECTION PRIOR TO COVER.
2) NEED TO INSPECT TRASH ENCLOSURE RE-BAR LAY OUT AND DIMENSIONS.
3) SWEEP UP TRACKED SOIL OFF OF SUROUNDING ROADWAYS
4) RE-ESTABLISH AND MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION} ; {Activity date: 05/05/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE YOR STORM WATER PLAN IS COMPLIED WITH UNTIL THE SITE IS STABILIZED
2) ENSURE SEDIMENT CONTROLS ARE KEPT IN PLACE ALONG THE SOUTH PERIMETER UNTIL THE SITE WORK IS COMPLETED} ; {Activity date: 04/22/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) REMOVE CONSTRUCTION MATERIAL AFF OF SEDIEMNT CONTROLS ALONG SOUTH SIDE OF SITE.
2) RE-ESTABLISH SEDIEMNT CONTROLS ALONG THE NORTH SIDE OF SITE - SITE IS UNDER A STORM WATER PLAN/PERMIT UNTIL SITE IS STABILIZED
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
4) SWEEP UP TRACKED SOIL ROUTINELY

PICTURES TAKEN} ; {Activity date: 03/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by CSHARRA1 - 1. FOLLOW-UP INSPECTION
2. ENSURE SEDIMENT CONTROLS ARE MAINTAINED
3. ENSURE STORM WATER SELF-INSPECTIONS ARE PERFORMED & DOCUMENTED
4. CALL FOR RE-INSPECTION FOR ANY CONCERNS AND/OR PROBLEMS} ; {Activity date: 03/02/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/19/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION.
2) ENSURE CONTRACTOR PERFORMS STORM WATER SELF INSPECTIONS AND DOCUMENTS THEM
3) SWEEP UP TRACKED SOIL AS NEEDED
4) INSTALL A CONCRETE/MATERIALS WASH OUT
5) CONTRACTOR BUILT UP BLDG PAD AND IS DIGGING FOOTINGS FOR BLDG.
6) CONTRACTOR DOING UTILITY WORK} ; {Activity date: 02/10/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER / SITE CONCERNS AT THIS TIME} ; {Activity date: 02/04/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER APPROVED STORM WATER PLAN AND INSPECTORS RECOMMENDATIONS
2) SITE IS IN FLOOD PLAIN AND MUST COMPLY WITH PERMIT CONDITIONS PROR TO FINAL APPROVAL
3) NPPO WAS NOT FOLLOWED AND COMPLIANCE MUST BE OBTAINED PRIOR TO FINAL APPROVAL
4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED}
10/14/2015 ENGR Grading Final Passed {Activity date: 10/14/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
10/14/2015 SITE - Stormwater Final Inspection Passed {Activity date: 10/14/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SUBMIT A NOTICE OF TERMINATION TO ADEQ}
10/28/2015 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/28/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/14/2015; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PROVIDE AN ACCEPTANCE LETTER FROM THE LANDSCAPE ARCHITECT STATING THAT THEY APPROVE SITE CONDITIONS.}
10/28/2015 ENGR Engineering Final Passed {Activity date: 10/28/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/14/2015; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD
2) SUBMIT AN AS-BUILT DRAWING TO THE CITY OF TUCSON
3) PROVIDE AN ACCEPTANCE LETTER FROM THE LANDSCAPE ARCHITECT.
4) SEE NOTES BELOW:

THIS CONDITION SUPERCEDES ALL OTHER REQUIREMENTS OR APPROVALS FOR FINISHED FLOOR ELEVATION REQUIREMENTS PER PDSD ENGINEERING ADMINISTRATOR JIM VOGELSBERG P.E.. CITY OF TUCSON REGULATIONS PRESENTLY DO NOT PERMIT THE FLOODPROOFING OF A NEW STRUCTURE BY ANY METHOD OTHER THAN RAISING THE LOWEST FINISHED FLOOR AT LEAST ONE FOOT ABOVE THE HIGHEST WATER-SURFACE ELEVATION INTERSECTING THE FOOTPRINT OF THE STRUCTURE DURING A BASE (I.E., 100-YEAR OR JURISDICTIONAL) FLOOD. HOWEVER, PER JIM VOGELSBERG P.E. AN EXCEPTION APPLIES TO THIS PROJECT, WHERE, UNDER CERTAIN CIRCUMSTANCES AS ACCEPTED BY THE FLOODPLAIN ADMINISTRATOR, IN AREAS OF NON-SFHA AREAS WHERE JURISDICTIONAL NON-SFHA FLOWS ARE INDICATED AS LESS THAN 1-FOOT, AND FOR COMMERCIAL BUILDINGS LARGER THAN 50,000 SQFT THAT MAY HAVE STEPPED FINISHED FLOORS, EACH FINISHED FLOOR WILL MEET AN ELEVATION THAT IS AT LEAST ONE FOOT ABOVE THE HIGHEST WATER-SURFACE ELEVATION INTERSECTING THE FOOTPRINT OF EACH FINISHED FLOOR. PRE-SLAB & FINAL ELEVATION CERTIFICATIONS, WITH EXHIBITS, PREPARED BY AN ARIZONA REGISTERED LAND SURVEYOR, AND SPECIAL INSPECTIONS ARE REQUIRED PER JIM VOGELSBERG P.E.. THIS CONDITION APPLIES TO INSPECTION 1015 AND SUBSEQUESNT INSPECTIONS SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATION DOCUMENT AND OTHER ASSOCIATED PERMIT CONDITIONS HAVE BEEN APPROVED. PER JIM VOGELSBERG P.E., CERTIFICATION DOCUMENT SHALL INCLUDE ELEVATION OF EACH FORMED PRE-SLAB TO SHOW THAT EACH FLOOR FOR THIS PROJECT WILL BE AT, OR ABOVE HIGHEST REGULATORY WATER-SURFACE ELEVATION INTERSECTING THE FOOTPRINT OF EACH FINISHED FLOOR, WHICH IS 1-FOOT ABOVE THE 100-YR WSEL IMPACTING EACH SLAB (2-FEET ABOVE NATURAL GRADE AT ANY POINT UNDER EACH SLAB). THIS CONDITION ALSO APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND INSPECTIONS SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATION AND ASSOCIATED PERMIT CONDITIONS HAVE BEEN APPROVED. ORIGINAL PRE-SLAB AND FINAL ELEVATION CERTIFICATION STATEMENTS ARE REQUIRED AND SHALL DOCUMENT THE PRE-SLAB AND FINAL ELEVATIONS TO SHOW COMPLIANCE WITH THIS CONDITION AND SHALL BE SEALED BY A REGISTERED LAND SURVEYOR. MAIL ELEVATION CERTIFICATION DOCUMENTAION TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: JASON GREEN OR LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER DOCUMENTATION TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. JASON'S NUMBER IS 837-4929 AND LOREN'S IS 837-4927.} ; {Activity date: 08/11/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PRIOR TO FINAL APPROVAL PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL BUBBLER BOX INSTALLATIONS ON SUTE WERE CONSTRUCTED PER THE APPROVED PLANS, NO INSPECTIONS WERE CALLED IN
2) ENSURE MAIN ROOF DRAINS DO NOT DROP ONTO SIDEWALKS
} ; {Activity date: 07/15/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO INSPECTIONS DONE ON INSTALL OF BUBBLER BOX
2) CLEAN OUT BUBBLER BOX PRIOR TO FINAL APPROVAL
3) PROVIDE CERTIFICATION STATEMENT FROM THE ENG OF RECORD
4) STABILIZE EASEMENT NEAR REGULATED WASH
5) PROVIDE ELEVATION CERT
6) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
10/28/2015 SITE - Stormwater Setup and Controls Passed {Activity date: 10/28/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ALL CONDITIONS HAVE BEEN MET PER THE ENGINEER OF RECORD} ; {Activity date: 10/14/2015; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD
2) SUBMIT AN AS-BUILT DRAWING TO THE CITY OF TUCSON
3) PROVIDE AN ACCEPTANCE LETTER FROM THE LANDSCAPE ARCHITECT.
4) SEE NOTES BELOW:

THIS CONDITION SUPERCEDES ALL OTHER REQUIREMENTS OR APPROVALS FOR FINISHED FLOOR ELEVATION REQUIREMENTS PER PDSD ENGINEERING ADMINISTRATOR JIM VOGELSBERG P.E.. CITY OF TUCSON REGULATIONS PRESENTLY DO NOT PERMIT THE FLOODPROOFING OF A NEW STRUCTURE BY ANY METHOD OTHER THAN RAISING THE LOWEST FINISHED FLOOR AT LEAST ONE FOOT ABOVE THE HIGHEST WATER-SURFACE ELEVATION INTERSECTING THE FOOTPRINT OF THE STRUCTURE DURING A BASE (I.E., 100-YEAR OR JURISDICTIONAL) FLOOD. HOWEVER, PER JIM VOGELSBERG P.E. AN EXCEPTION APPLIES TO THIS PROJECT, WHERE, UNDER CERTAIN CIRCUMSTANCES AS ACCEPTED BY THE FLOODPLAIN ADMINISTRATOR, IN AREAS OF NON-SFHA AREAS WHERE JURISDICTIONAL NON-SFHA FLOWS ARE INDICATED AS LESS THAN 1-FOOT, AND FOR COMMERCIAL BUILDINGS LARGER THAN 50,000 SQFT THAT MAY HAVE STEPPED FINISHED FLOORS, EACH FINISHED FLOOR WILL MEET AN ELEVATION THAT IS AT LEAST ONE FOOT ABOVE THE HIGHEST WATER-SURFACE ELEVATION INTERSECTING THE FOOTPRINT OF EACH FINISHED FLOOR. PRE-SLAB & FINAL ELEVATION CERTIFICATIONS, WITH EXHIBITS, PREPARED BY AN ARIZONA REGISTERED LAND SURVEYOR, AND SPECIAL INSPECTIONS ARE REQUIRED PER JIM VOGELSBERG P.E.. THIS CONDITION APPLIES TO INSPECTION 1015 AND SUBSEQUESNT INSPECTIONS SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATION DOCUMENT AND OTHER ASSOCIATED PERMIT CONDITIONS HAVE BEEN APPROVED. PER JIM VOGELSBERG P.E., CERTIFICATION DOCUMENT SHALL INCLUDE ELEVATION OF EACH FORMED PRE-SLAB TO SHOW THAT EACH FLOOR FOR THIS PROJECT WILL BE AT, OR ABOVE HIGHEST REGULATORY WATER-SURFACE ELEVATION INTERSECTING THE FOOTPRINT OF EACH FINISHED FLOOR, WHICH IS 1-FOOT ABOVE THE 100-YR WSEL IMPACTING EACH SLAB (2-FEET ABOVE NATURAL GRADE AT ANY POINT UNDER EACH SLAB). THIS CONDITION ALSO APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND INSPECTIONS SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATION AND ASSOCIATED PERMIT CONDITIONS HAVE BEEN APPROVED. ORIGINAL PRE-SLAB AND FINAL ELEVATION CERTIFICATION STATEMENTS ARE REQUIRED AND SHALL DOCUMENT THE PRE-SLAB AND FINAL ELEVATIONS TO SHOW COMPLIANCE WITH THIS CONDITION AND SHALL BE SEALED BY A REGISTERED LAND SURVEYOR. MAIL ELEVATION CERTIFICATION DOCUMENTAION TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: JASON GREEN OR LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER DOCUMENTATION TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. JASON'S NUMBER IS 837-4929 AND LOREN'S IS 837-4927.}

Documents

File Name Document Type  
001_SHEET 1 OF 5.TIF DEVELOPMENT PACKAGE VIEW
002_SHEET 2 OF 5.TIF DEVELOPMENT PACKAGE VIEW
003_SHEET 3 OF 5.TIF DEVELOPMENT PACKAGE VIEW
004_SHEET 4 OF 5.TIF DEVELOPMENT PACKAGE VIEW
005_SHEET 5 OF 5.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW