Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP14-0184
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/21/2015 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - NO SITE/GRADING CHANGES AT THIS TIME NO SITE INSPECTIONS CALLED IN BY CONTRACTOR ENSURE SITE IS CONSTRUCTED PER THE APPROVED PLANS |
07/15/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) NO INSPECTIONS DONE ON INSTALL OF BUBBLER BOX 2) CLEAN OUT BUBBLER BOX PRIOR TO FINAL APPROVAL 3) PROVIDE CERTIFICATION STATEMENT FROM THE ENG OF RECORD 4) STABILIZE EASEMENT NEAR REGULATED WASH 5) PROVIDE ELEVATION CERT 6) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
06/09/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) NEED TO INSPECT INSTALL OF BUBBLER BOX ALONG THE NORTH SIDE OF BLDG. CALL FOR INSPECTION PRIOR TO COVER. 2) NEED TO INSPECT TRASH ENCLOSURE RE-BAR LAY OUT AND DIMENSIONS. 3) SWEEP UP TRACKED SOIL OFF OF SUROUNDING ROADWAYS 4) RE-ESTABLISH AND MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION |
05/05/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - RIGHT OF WAY SITE WORK IS BEING COMPLETED NO OTHER SITE CONCERNS AND/OR CHANGES AT THIS TIME |
04/23/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES AT THIS TIME |
03/02/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT CHANGES AT THIS TIME |
02/19/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION. 2) ENSURE CONTRACTOR PERFORMS STORM WATER SELF INSPECTIONS AND DOCUMENTS THEM 3) SWEEP UP TRACKED SOIL AS NEEDED 4) INSTALL A CONCRETE/MATERIALS WASH OUT 5) CONTRACTOR BUILT UP BLDG PAD AND IS DIGGING FOOTINGS FOR BLDG. 6) CONTRACTOR DOING UTILITY WORK |
02/04/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER APPROVED STORM WATER PLAN AND INSPECTORS RECOMMENDATIONS 2) SITE IS IN FLOOD PLAIN AND MUST COMPLY WITH PERMIT CONDITIONS PROR TO FINAL APPROVAL 3) NPPO WAS NOT FOLLOWED AND COMPLIANCE MUST BE OBTAINED PRIOR TO FINAL APPROVAL 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
10/14/2015 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
10/14/2015 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |