Permit: DP14-0175
Permit Details
Apply Date:
09/25/2014
Applicant:
Michelle Conklin
Description:
SITE/GRADING/SWPPP- TUCSON BOTANICAL GARDEN
Permit Reviews
Permit Number - DP14-0175
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP- TUCSON BOTANICAL GARDEN
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/29/2014 | DEV PKG - OK TO SUBMIT | 09/29/2014 | COMPLETED |
09/29/2014 | SITE and/or GRADING | 10/28/2014 | COMPLETED |
12/11/2014 | RESUB - SITE/GRADING ALL | 02/04/2015 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP14-0175
Permit Description: SITE/GRADING/SWPPP- TUCSON BOTANICAL GARDEN
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/17/2015 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 03/17/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by CSHARRA1 - PRE-CON W/ PETER THE G.C.} | |
09/28/2015 | SITE - Stormwater Follow-up | Passed | {Activity date: 09/28/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
09/28/2015 | SITE - Stormwater Final Inspection | Passed | {Activity date: 09/28/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
09/28/2015 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 09/28/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
02/14/2017 | ENGR Grading Final | Passed | {Activity date: 02/14/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/09/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - REBAR FOR FOOTER AND MAT FOR TRASH ENCLOSUER OK ONLY.} ; {Activity date: 09/28/2015; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE TRASH ENCLOSURE AS SHOWN ON THE APPROVED PLANS.} | |
03/28/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 03/28/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by CTREVIL1 - } ; {Activity date: 09/28/2015; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS OR PROVIDE A REVISION OF THE PLANS SHOWING THAT ALL THE MISSING ITEMS ARE NOLONGER REQUIRED.} | |
03/28/2017 | ENGR Engineering Final | Passed | {Activity date: 03/28/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by CTREVIL1 - } ; {Activity date: 03/15/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS. PROVDE AS-BUILT AND CERT LETTER FROM ENGINEER OF RECODE.} ; {Activity date: 02/14/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/13/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - BAR IN WALL OK.} ; {Activity date: 02/07/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON TRASH ENCLOUSER.} ; {Activity date: 09/28/2015; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL ITEMS AS SHOWN ON THE APPROVED PLANS PRIOR TO CALLING IN FOR THIS FINAL INSPECTION.} |