Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
09/25/2014
Applicant:
Michelle Conklin
Description:
SITE/GRADING/SWPPP- TUCSON BOTANICAL GARDEN

Permit Reviews

Permit Number - DP14-0175
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP- TUCSON BOTANICAL GARDEN
Start Date Submittal Complete Date Status  
09/29/2014 DEV PKG - OK TO SUBMIT 09/29/2014 COMPLETED Review Details
09/29/2014 SITE and/or GRADING 10/28/2014 COMPLETED Review Details
12/11/2014 RESUB - SITE/GRADING ALL 02/04/2015 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP14-0175
Permit Description: SITE/GRADING/SWPPP- TUCSON BOTANICAL GARDEN
Total Completed Inspections - 7
Date Description Inspector Results Comments
03/17/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 03/17/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by CSHARRA1 - PRE-CON W/ PETER THE G.C.}
09/28/2015 SITE - Stormwater Follow-up Passed {Activity date: 09/28/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/28/2015 SITE - Stormwater Final Inspection Passed {Activity date: 09/28/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/28/2015 SITE - Stormwater Setup and Controls Passed {Activity date: 09/28/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
02/14/2017 ENGR Grading Final Passed {Activity date: 02/14/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/09/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - REBAR FOR FOOTER AND MAT FOR TRASH ENCLOSUER OK ONLY.} ; {Activity date: 09/28/2015; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE TRASH ENCLOSURE AS SHOWN ON THE APPROVED PLANS.}
03/28/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 03/28/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by CTREVIL1 - } ; {Activity date: 09/28/2015; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS OR PROVIDE A REVISION OF THE PLANS SHOWING THAT ALL THE MISSING ITEMS ARE NOLONGER REQUIRED.}
03/28/2017 ENGR Engineering Final Passed {Activity date: 03/28/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by CTREVIL1 - } ; {Activity date: 03/15/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS. PROVDE AS-BUILT AND CERT LETTER FROM ENGINEER OF RECODE.} ; {Activity date: 02/14/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/13/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - BAR IN WALL OK.} ; {Activity date: 02/07/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON TRASH ENCLOUSER.} ; {Activity date: 09/28/2015; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL ITEMS AS SHOWN ON THE APPROVED PLANS PRIOR TO CALLING IN FOR THIS FINAL INSPECTION.}

Documents

File Name Document Type  
001_GENERAL NOTES FOR SITE_1 OF 10.TIF DEVELOPMENT PACKAGE VIEW
002_GENERAL NOTES FOR GRADING/PAVING/SURVEY/LEGEND_2 OF 10.TIF DEVELOPMENT PACKAGE VIEW
003_DEMOLITION_3 OF 10.TIF DEVELOPMENT PACKAGE VIEW
004_SITE_4 OF 10.TIF DEVELOPMENT PACKAGE VIEW
005_PAVING / GRADING_5 OF 10.TIF DEVELOPMENT PACKAGE VIEW
006_PAVING / GRADING_6 OF 10.TIF DEVELOPMENT PACKAGE VIEW
007_BUILDING CONNECTION SEWER_7 OF 10.TIF DEVELOPMENT PACKAGE VIEW
008_FIRE SERVICE LINE RELOCATION_8 OF 10.TIF DEVELOPMENT PACKAGE VIEW
009_DETAILS_9 OF 10.TIF DEVELOPMENT PACKAGE VIEW
010_DETAILS_10 OF 10.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW