Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP14-0175
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2017 | ENGR Engineering Final | DROBERTS | Approved | Entered by CTREVIL1 - |
03/15/2017 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS. PROVDE AS-BUILT AND CERT LETTER FROM ENGINEER OF RECODE. |
02/14/2017 | ENGR Engineering Final | RLEDONNE | Continued | Entered by RLEDONN1 - |
02/13/2017 | ENGR Engineering Final | RLEDONNE | Continued | Entered by RLEDONN1 - BAR IN WALL OK. |
02/07/2017 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - WORKING ON TRASH ENCLOUSER. |
09/28/2015 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by DROBERT5 - COMPLETE ALL ITEMS AS SHOWN ON THE APPROVED PLANS PRIOR TO CALLING IN FOR THIS FINAL INSPECTION. |