Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
10495 S MILLICENT TR
Apply Date:
09/09/2014
Applicant:
Description:
GRADING/SWPPP - The Vistas at Rincon Knolls, Lots 1-160, C.S. "A"-"E" and Block 1.

Permit Reviews

Permit Number - DP14-0153
Permit Status: Complete
Permit Description: GRADING/SWPPP - The Vistas at Rincon Knolls, Lots 1-160, C.S. "A"-"E" and Block 1.
Start Date Submittal Complete Date Status  
04/15/2015 RESUB - SITE and/or GRADING 05/27/2015 COMPLETED Review Details
05/29/2018 REVISION - GRADING 05/30/2018 COMPLETED Review Details
06/23/2015 RESUB - SITE and/or GRADING 01/17/2018 COMPLETED Review Details
09/09/2014 GRADING 09/09/2014 COMPLETED Review Details
09/09/2014 GRADING 10/16/2014 COMPLETED Review Details
10/03/2019 REVISION - GRADING 11/04/2019 COMPLETED Review Details
12/18/2019 REVISION - GRADING 01/30/2020 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP14-0153
Permite Description: GRADING/SWPPP - The Vistas at Rincon Knolls, Lots 1-160, C.S. "A"-"E" and Block 1.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/03/2022 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 05/03/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME} ; {Activity date: 03/01/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED, NO CONCERNS AT THIS TIME 9185 (GRADING - INTERMEDIATE) IS CONTINUED, A COMPLETE WALK THROUGH OF THE SITE WILL BE REQUIRED PRIOR TO CONSIDERING FOR A FULL APPROVAL, PLUS PROVIDE ALL CLISEOUT DOCUMENTS} ; {Activity date: 12/01/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 11/25/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 11/17/2020; Status: Continued; Inspector: RDELONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 11/10/2020; Status: Continued; Inspector: RLADONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 10/22/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 09/28/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.

} ; {Activity date: 09/01/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/21/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/17/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.

} ; {Activity date: 08/03/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 05/06/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - No concerns at this time.} ; {Activity date: 02/14/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/29/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 09/27/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No track out at this time.} ; {Activity date: 08/20/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.} ; {Activity date: 07/09/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT ON STREETS OR OTHER CONCERNS AT THIS TIME.} ; {Activity date: 04/17/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by CMURPHY1 - NO CONCERN ON THE EXTERIOR OF THE SITE OR WITHIN THE PROJECT.
} ; {Activity date: 04/17/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by CMURPHY1 - no concerns on the exterior portion of the project.
} ; {Activity date: 03/22/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by CBELL1 - Want to check out the journal noted on internal roadways but nothing out onto Mary and Cleveland everybody is the John tractor ensure that all material from the state sales within the site} ; {Activity date: 03/05/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - No concerns at this time.} ; {Activity date: 02/13/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - No concerns at this time.} ; {Activity date: 02/08/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Met with Matt from borderline about making repairs to sweat controls} ; {Activity date: 01/18/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Make repairs to wattles on North and westside of site met with GC about repairs} ; {Activity date: 12/20/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - new waddle added} ; {Activity date: 11/27/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Working on adding new controls.} ; {Activity date: 11/21/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Still no repairs to swppp controls talked with Eddie from Borderland he said that he was going to make repairs on Monday.} ; {Activity date: 09/21/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - TRACK OUT ROCK HAS BEEN ADDED.} ; {Activity date: 09/14/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GRADING CONTRACTOR ABOUT INSTALLING AND REPAIRING SWPPP CONTOLS. AND ADDING TRACK OUT ROCK.} ; {Activity date: 08/28/2018; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GRADING CONTRACTOR ABOUT MAKING REPAIRS TO SWPPP CONTOLS.} ; {Activity date: 08/09/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GRADING CONTRACTOR ABOUT REPAIRS TO SWPPP CONTROLS.} ; {Activity date: 06/06/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GRADING CONTRACTOR ABOUT ADDING TRACK OUT ROCK.} ; {Activity date: 06/01/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - TRACK OUT ROCK NEEDS TO BE ADDED .} ; {Activity date: 05/21/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GRADING CONTRATOR ON SITE HE IS STARTING TO INSTALL CONTROLS.}

Completed Inspections

Permit Status: Complete
Permit Number: DP14-0153
Permit Description: GRADING/SWPPP - The Vistas at Rincon Knolls, Lots 1-160, C.S. "A"-"E" and Block 1.
Total Completed Inspections - 6
Date Description Inspector Results Comments
06/10/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 06/10/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by CBELL1 - }
06/10/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 06/10/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by CBELL1 - } ; {Activity date: 02/06/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH BORDERLAND ONSITE AND LOOKED OVER THE FUTURE WORK THAT WILL BE STARTING NEXT WEEK ON 2/12/18. RON AND I WILL LOOK AT THIS SITE NEXT WEEK TOO ENSURE THAT THEY HAVE COMPLETED THE WORK NEEDED TO SATISFY THE SWPPP'S.}
05/03/2022 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/03/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/31/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - complete all landscaping per approved plans and details.}
05/03/2022 ENGR Grading Final Passed {Activity date: 05/03/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
12/29/2023 ENGR Engineering Final Passed
12/29/2023 SITE - Stormwater Final Inspection Passed

Documents

File Name Document Type  
001_COVER SHEET_G1.TIF DEVELOPMENT PACKAGE VIEW
002_GENERAL NOTES_G2.TIF DEVELOPMENT PACKAGE VIEW
003_PLAN SHEETS_G3.TIF DEVELOPMENT PACKAGE VIEW
004_PLAN SHEETS_G4.TIF DEVELOPMENT PACKAGE VIEW
005_PLAN SHEETS_G5.TIF DEVELOPMENT PACKAGE VIEW
006_PLAN SHEETS_G6.TIF DEVELOPMENT PACKAGE VIEW
007_PLAN SHEETS_G7.TIF DEVELOPMENT PACKAGE VIEW
008_PLAN SHEETS_G8.TIF DEVELOPMENT PACKAGE VIEW
009_PLAN SHEETS_G9.TIF DEVELOPMENT PACKAGE VIEW
010_DETAIL SHEETS_G10.TIF DEVELOPMENT PACKAGE VIEW
011_DETAIL SHEETS_G11.TIF DEVELOPMENT PACKAGE VIEW
012_DETAIL SHEETS_G12.TIF DEVELOPMENT PACKAGE VIEW
013_DETAIL SHEETS_G13.TIF DEVELOPMENT PACKAGE VIEW
014_TEMPORARY STOCKPILE AREA_G14.TIF DEVELOPMENT PACKAGE VIEW
015_DESERT TORTOISE MITIGATION_G15.TIF DEVELOPMENT PACKAGE VIEW
016_DESERT TORTOISE MITIGATION DETAILS_G16.TIF DEVELOPMENT PACKAGE VIEW
017_COVER SHEET_PS1.TIF DEVELOPMENT PACKAGE VIEW
018_GENERAL NOTES_PS2.TIF DEVELOPMENT PACKAGE VIEW
019_PLAN / PROFILE SHEETS_PS3.TIF DEVELOPMENT PACKAGE VIEW
020_PLAN / PROFILE SHEETS_PS4.TIF DEVELOPMENT PACKAGE VIEW
021_PLAN / PROFILE SHEETS_PS5.TIF DEVELOPMENT PACKAGE VIEW
022_PLAN / PROFILE SHEETS_PS6.TIF DEVELOPMENT PACKAGE VIEW
023_PLAN / PROFILE SHEETS_PS7.TIF DEVELOPMENT PACKAGE VIEW
024_PLAN / PROFILE SHEETS_PS8.TIF DEVELOPMENT PACKAGE VIEW
025_PLAN / PROFILE SHEETS_PS9.TIF DEVELOPMENT PACKAGE VIEW
026_PLAN / PROFILE SHEETS_PS10.TIF DEVELOPMENT PACKAGE VIEW
027_PLAN / PROFILE SHEETS_PS11.TIF DEVELOPMENT PACKAGE VIEW
028_PLAN / PROFILE SHEETS_PS12.TIF DEVELOPMENT PACKAGE VIEW
029_PLAN / PROFILE SHEETS_PS13.TIF DEVELOPMENT PACKAGE VIEW
030_PLAN / PROFILE SHEETS_PS14.TIF DEVELOPMENT PACKAGE VIEW
031_PLAN / PROFILE SHEETS_PS15.TIF DEVELOPMENT PACKAGE VIEW
032_ENTRANCES DETAIL SHEET_PS16.TIF DEVELOPMENT PACKAGE VIEW
033_PUMP STATION / FORCE MAIN_PS17.TIF DEVELOPMENT PACKAGE VIEW
034_PUMP STATION / FORCE MAIN_PS18.TIF DEVELOPMENT PACKAGE VIEW
035_PUMP STATION / FORCE MAIN_PS19.TIF DEVELOPMENT PACKAGE VIEW
036_PUMP STATION / FORCE MAIN_PS20.TIF DEVELOPMENT PACKAGE VIEW
037_HORIZONTAL CONTROL_PS21.TIF DEVELOPMENT PACKAGE VIEW
038_HORIZONTAL CONTROL_PS22.TIF DEVELOPMENT PACKAGE VIEW
039_HORIZONTAL CONTROL_PS23.TIF DEVELOPMENT PACKAGE VIEW
040_STRIPING SHEET_PS24.TIF DEVELOPMENT PACKAGE VIEW
041_DETAIL SHEETS_PS25.TIF DEVELOPMENT PACKAGE VIEW
042_DETAIL SHEET_PS26.TIF DEVELOPMENT PACKAGE VIEW
043_STRUCTURAL_S1.TIF DEVELOPMENT PACKAGE VIEW
044_STRUCTURAL_S2.TIF DEVELOPMENT PACKAGE VIEW
045_STRUCTURAL_S3.TIF DEVELOPMENT PACKAGE VIEW
046_STRUCTURAL_S4.TIF DEVELOPMENT PACKAGE VIEW
047_LIFT STATION ELECTRICAL_E1.TIF DEVELOPMENT PACKAGE VIEW
048_LIFT STATION ELECTRICAL_E2.TIF DEVELOPMENT PACKAGE VIEW
049_LIFT STATION ELECTRICAL_E3.TIF DEVELOPMENT PACKAGE VIEW
050_SWPPP_SW1.TIF DEVELOPMENT PACKAGE VIEW
051_SWPPP_SW2.TIF DEVELOPMENT PACKAGE VIEW
052_SWPPP_SW3.TIF DEVELOPMENT PACKAGE VIEW
053_SWPPP_SW4.TIF DEVELOPMENT PACKAGE VIEW
054_SWPPP_SW5.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW
GPDPREV#22ND COMMENT RESP DOCUMENTS VIEW
ST-ONSITE TESTING GEOTECH CERT.PDF DOCUMENTS VIEW
UG-ONSITE TESTING GEOTECH CERT.PDF DOCUMENTS VIEW
REVISION LETTER.PDF DOCUMENTS VIEW
EW-ONSITE TESTING GEOTECH CERT_6-20-2018.PDF DOCUMENTS VIEW
LANDSCAPE LETTER.PDF DOCUMENTS VIEW
SEALED CERT LTR 10-2-19.PDF DOCUMENTS VIEW