Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
09/03/2014
Applicant:
Peter Salonga
Description:
TENTATIVE PLAT/FLD - COLUMBUS HOMES, LOTS 1-16

Permit Reviews

Permit Number - DP14-0148
Permit Status: Complete
Permit Description: TENTATIVE PLAT/FLD - COLUMBUS HOMES, LOTS 1-16
Start Date Submittal Complete Date Status  
02/03/2015 DEV PKG - OK TO SUBMIT 02/05/2015 COMPLETED Review Details
02/05/2015 DEV PKG 03/31/2015 COMPLETED Review Details
08/20/2015 DEV PKG - RESUBMITTAL 10/21/2015 COMPLETED Review Details
11/06/2015 DEV PKG - RESUBMITTAL 12/23/2015 COMPLETED Review Details
12/30/2015 DEV PKG - RESUBMITTAL 01/04/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP14-0148
Permit Description: TENTATIVE PLAT/FLD - COLUMBUS HOMES, LOTS 1-16
Total Completed Inspections - 7
Date Description Inspector Results Comments
01/09/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/09/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH BRYAN FROM DESERT EARTH AND GERRY GREY TO LOOK OVER THE PROPOSED WORK FOR THE AREA AND THEIR CONSTRUCTION SCHEDULE. I WILL MEET WITH BRYAN AGAIN NEXT WEEK AND PERFORM ALL OF THE DUTIES FOR THE PERCON MEETING AND WILL INCLUDE BRYAN BENEDON.} ; {Activity date: 01/08/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/11/2021 SITE - Stormwater Final Inspection Passed {Activity date: 01/11/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - APPROVED}
03/02/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 03/02/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/11/2021; Status: Basin in Good Condition; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - GOOD}
03/02/2021 ENGR Engineering Final Passed {Activity date: 03/02/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/11/2021; Status: Not ready for Inspection; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - SIDEWALK AND DRIVEWAY NEED IN FIVE LOTS
} ; {Activity date: 09/11/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - NOT READY AT THIS TIME, MISSING THE SIDE WALK AND DRIVEWAYS, DG AND LANDSCAPING FOR LOTS #5, #9 & 10, 12 - 16. THE SIDEWALKS WILL BE CHECKED FOR ADA COMPLIANCE OF SLOPES PRIOR TO FINAL APPROVAL.}
03/02/2021 SITE - Stormwater Follow-up Passed {Activity date: 03/02/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 11/30/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 11/18/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 11/09/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No track out no concerns at this time.} ; {Activity date: 11/03/2020; Status: Continued; Inspector: RDELONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 10/28/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 10/20/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 09/29/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 09/11/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - CONTINUED, NO CONCERNS AT THIS TIME.

} ; {Activity date: 08/25/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/13/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 08/05/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 07/28/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time.} ; {Activity date: 05/05/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No concerns at this time. 09185 grading intermediate. Continue no grading activity on site at this time.} ; {Activity date: 10/25/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.
} ; {Activity date: 06/04/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - No concerns at this time.
} ; {Activity date: 05/07/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Small pile of concrete on ground. Waddles have been removed from perimeter of site} ; {Activity date: 04/19/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - There are no concerns at this time for this site} ; {Activity date: 04/10/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by CBELL1 - Met with Brian from desert earth on site went over adding swppp Controls to south and east side of site}
03/02/2021 ENGR Grading Final Passed {Activity date: 03/02/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/11/2021; Status: Basin in Good Condition; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - GOOD} ; {Activity date: 01/07/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I DROVE THROUGH THE SITE TO SEE WHAT TYPE OF WORK IS BEING DONE AT THIS TIME. CURRENTLY 5 HOMES ARE UNDER CONSTRUCTION IN VARIOUS STATES, ALL OF THE OTHER LOTS HAVE BEEN COMPLETED.} ; {Activity date: 11/24/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continue. No grading activity on site at this time.} ; {Activity date: 09/21/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. Working on houses.} ; {Activity date: 09/03/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - continue. No grading activity at this time working on houses and house pad.

} ; {Activity date: 07/14/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No grading activity at this time. Working on houses.} ; {Activity date: 06/30/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No grading activity at this time working on houses.} ; {Activity date: 06/24/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No grading activity at this time working on houses.} ; {Activity date: 06/01/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No grading activity at this time.} ; {Activity date: 05/26/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Continue. No grading activity on site at this time.} ; {Activity date: 06/13/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Working on site wall and house pads.} ; {Activity date: 04/19/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH BRYAN FROM DESERT EARTH AND GERRY GREY TO LOOK OVER THE PROPOSED WORK FOR THE AREA AND THEIR CONSTRUCTION SCHEDULE. I WILL MEET WITH BRYAN AGAIN NEXT WEEK AND PERFORM ALL OF THE DUTIES FOR THE PERCON MEETING AND WILL INCLUDE BRYAN BENEDON.} ; {Activity date: 03/13/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ACTIVITY ON SITE.} ; {Activity date: 02/28/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON SEWER REPAIR.}
03/02/2021 SITE - Stormwater Setup and Controls Passed {Activity date: 03/02/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/11/2021; Status: Basin in Good Condition; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - GOOD}

Documents

File Name Document Type  
001_COVER SHEET_1 OF 11.TIF DEVELOPMENT PACKAGE VIEW
002_SITE PLAN_2 OF 11.TIF DEVELOPMENT PACKAGE VIEW
003_GRADING / UTILITY PLAN_3 OF 11.TIF DEVELOPMENT PACKAGE VIEW
004_LANDSCAPE COVER SHEET_4 OF 11.TIF DEVELOPMENT PACKAGE VIEW
005_NPPP_5 OF 11.TIF DEVELOPMENT PACKAGE VIEW
006_LANDSCAPE PLAN_6 OF 11.TIF DEVELOPMENT PACKAGE VIEW
007_IRRIGATION PLAN_7 OF 11.TIF DEVELOPMENT PACKAGE VIEW
008_LANDSCAPE / IRRIGATION DETAILS_8 OF 11.TIF DEVELOPMENT PACKAGE VIEW
009_PRIVACY MITIGATION PLAN_9 OF 11.TIF DEVELOPMENT PACKAGE VIEW
010_BUILDING FLOOR PLAN_10 OF 11_.TIF DEVELOPMENT PACKAGE VIEW
011_BUILDING ELEVATIONS_11 OF 11.TIF DEVELOPMENT PACKAGE VIEW
FLD MAILING DOCUMENTS VIEW
PAG DP14-0148 COLUMBUS TOWNHOMES FLD TENTATIVE PLAT (1).PDF DOCUMENTS VIEW
PAG DP14-0148 COLUMBUS TOWNHOMES FLD TENTATIVE PLAT (2).PDF DOCUMENTS VIEW
2015-01 SWG TUCSON DISTRICT CONTACT INFO-MAP-STANDBY.PDF DOCUMENTS VIEW
SWG COLUMBUS TOWNHOMES.PDF DOCUMENTS VIEW
TW 3103 N. COLUMBUS BLVD.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
1_FLD_DOCS_NEIGHBORHOOD MEETING.PDF PLANS UNDER REVIEW VIEW
1_PIMA COUNTY ASSESSORS PARCEL_INFO.PDF PLANS UNDER REVIEW VIEW