Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
8257 S RITA RD
Address NEW:
8257 S RITA RD
Apply Date:
04/11/2014
Applicant:
Description:
SITE/GRADING/SWPPP

Permit Reviews

Permit Number - DP14-0056
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP
Start Date Submittal Complete Date Status  
01/20/2017 REVISION - SITE 01/23/2017 ACTIVE Review Details
04/11/2014 DEV PKG - OK TO SUBMIT 05/09/2014 COMPLETED Review Details
05/09/2014 SITE and/or GRADING 06/11/2014 COMPLETED Review Details
05/21/2015 REVISION - SITE 05/22/2015 COMPLETED Review Details
10/15/2014 RESUB - SITE/GRADING ALL 11/14/2014 COMPLETED Review Details
11/18/2014 RESUB - SITE/GRADING ALL 11/19/2014 COMPLETED Review Details
12/27/2016 REVISION - - 1ST 01/05/2017 COMPLETED Review Details

Conditions

Permit Number - DP14-0056
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP
Date Description Comments
11/19/2014 The following 11 conditions apply to this grading permit DP14-0056:1)Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Planning & Development Services Department - Angie 837-4917, or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2)Copy of approved plan/permit DP14-0056 shall be kept at site at all times until final grading approval.3)These sets of plans act as the approved grading plan for Brown/Rita Ranch Lot 42 sealed by Jeff Stanley P.E. 4)There shall be no disturbance outside of the disturbance/grading limits as shown on approved grading plans. 5)PDSD Inspector shall be called to inspect special grading, such as drainage, outlet when under construction. 6)Contact Permits and Codes (837-6606) for any questions regarding City of Tucson right-of-way permit requirements. 7)If grading construction is expected to last longer than the expiration date of the grading permit, contact PDSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.8)Revisions to the design must be discussed with a Civil Engineer at the City of Tucson Planning & Development Services Department Engineering Division, prior to any construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed, or, whether changes may be provided on as-builts. All work completed without approval is subject to Stop Work Order. 9)Permittee shall notify the PDSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all permanent erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed. Any revegetated areas shall require Landscaping approval of established vegetation prior to Final Grading Approval. Any other exposed areas that are not reseeded shall be covered in gravel, unless other material is proposed, reviewed, and accepted by City of Tucson.10)Temporary erosion and sediment control devices shall be placed at locations where stormwater runoff exits grading limits to prevent debris, construction silt, and/or chemicals from entering streets or any drainage ways. Any interim erosion and sediment controls that are installed should be maintained, per approved SWPPP plans or per EOR, at downstream areas of disturbance limits. These interim controls must be removed after all permanent controls have been established.11)Final Revised Grading Plan (as-builts) is required to be submitted prior to final Grading Inspection. As-builts should include as-built elevations for finished pad grades, outlet area, and other areas as deemed needed by surveyor.

Completed Inspections

Permit Status: Complete
Permit Number: DP14-0056
Permit Description: SITE/GRADING/SWPPP
Total Completed Inspections - 7
Date Description Inspector Results Comments
01/15/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/15/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROJECT IS GREATER THAN 1 ACRE AND IS UNDER A STORM WATER PERMIT.
2) CONTRACTOR HAS FILED A NOTICE OF INTENT WITH ADEQ
3) INSTALL SEDIMENT CONTROLS PER YOU APPROVED STORM WATER PLAN AND PER MY INSPECTION.
4) CALL FOR RE-INSPECTION WHEN CONTROLS HAVE BEEN INSTALLED.
5) ENSURE STORM WATER SELF INSPECTION ARE PERFORMED AND DOCUMENTED.
6) INSTALL A STABILIZED CONSTRUCTION ENTRANCE AND CONCRETE WASH OUT PER YOU PLAN.
7) WILL VERIFY NPPO}
02/17/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 02/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/30/2016; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled}
02/17/2017 ENGR Engineering Final Passed {Activity date: 02/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/17/2017 SITE - Stormwater Follow-up Passed {Activity date: 02/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/31/2016; Status: Violation; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - SITE IN NON-COMPLIANCE WITH SWPPP}
02/17/2017 ENGR Grading Final Passed {Activity date: 02/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/17/2017 SITE - Stormwater Final Inspection Passed {Activity date: 02/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/17/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 02/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/15/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET_1 OF 10.TIF DEVELOPMENT PACKAGE VIEW
002_DEVELOPMENT_2 OF 10.TIF DEVELOPMENT PACKAGE VIEW
003_PRIVATE PAVING / GRADING_3 OF 10.TIF DEVELOPMENT PACKAGE VIEW
004_DETAILS_4 OF 10.TIF DEVELOPMENT PACKAGE VIEW
005_SWPPP_5 OF 10.TIF DEVELOPMENT PACKAGE VIEW
006_LANDSCAPE_L-1.TIF DEVELOPMENT PACKAGE VIEW
007_IRRIGATION_L-2.TIF DEVELOPMENT PACKAGE VIEW
008_WATER HARVESTING_L-3.TIF DEVELOPMENT PACKAGE VIEW
009_LANDSCAPE DETAILS_L-4.TIF DEVELOPMENT PACKAGE VIEW
010_NPPO_N-1.TIF DEVELOPMENT PACKAGE VIEW
None DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW