Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
03/25/2014
Applicant:
Description:
SITE/GRADING/SWPPP- NEW ADMIN BUILDING

Permit Reviews

Permit Number - DP14-0044
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP- NEW ADMIN BUILDING
Start Date Submittal Complete Date Status  
03/25/2014 DEV PKG - OK TO SUBMIT 03/25/2014 COMPLETED Review Details
03/25/2014 SITE and/or GRADING 04/28/2014 COMPLETED Review Details
06/04/2014 RESUB - SITE/GRADING ALL 09/08/2014 COMPLETED Review Details
09/17/2014 RESUB - SITE/GRADING ALL 10/09/2014 ACTIVE Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP14-0044
Permit Description: SITE/GRADING/SWPPP- NEW ADMIN BUILDING
Total Completed Inspections - 7
Date Description Inspector Results Comments
10/20/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/20/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/28/2016 SITE - Stormwater Follow-up Passed {Activity date: 04/06/2016; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - INSTALL ALL OF THE STORMWATER ITEMS PER THE APPROVED PLANS.} ; {Activity date: 07/28/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 07/06/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/13/2016; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - SITE IS IN NON-COMPLIANCE WITH THERE SWPPP, CONTRACTOR HAS NOT PROVIDED STORM WATER SELF INSPECTIONS} ; {Activity date: 04/11/2016; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) PROVIDE COPIES OF YOUR STORM WATER SELF INSPECTIONS REQUIRED BY YOUR PERMIT
2) CONTRCTOR INSTALLING SECTIONS OF 24" CMP TO CONNECT TO EAST CATCH BASIN.
3) CONTRACTOR RE-INSTALLING CENTER CATCH BASIN - CALL FOR INSPECTION WHEN FORMED.
4) ENSURE STORM PIPE SLOPE IS AT 0.5% OR GREATER.
5) ENSURE YOUR SWPPP AND NOI ARE ON SITE DURING CONSTRUCTION} ; {Activity date: 04/07/2016; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERTS - INSPECTION WAS ACCOMPLISHED BY MIKE RUSSO AND DAVE ROBERTS.
1) INSTALL WADDLE PROPERLY PER YOUR PERMIT.
2) PROVIDE A PROPER WASH OUT
3) CATCH BASIN FLOOR MISSING RE-BAR.
4) CALL FOR INSPECTION PRIOR TO COVERING STORM PIPE.
5) CALL FOR RE-INSPECTION FOR APPROVAL OF CORRECTIONS REQUIRED.} ; {Activity date: 10/20/2015; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE TRACKOUT MATERIAL HAS BEEN PLACED AT THIS TIME ALONG WITH THE WADDLE ON THE NORTHSIDE OF THE SITE. I HAVE ADVISED THE CONTRACTOR THAT THEY NEED TO MAKE SURE THAT ALL THE TRACKOUT MATERIAL IS PICKED UP ON A DAILY BASIS. NO CONCERNS AT THIS TIME}
07/28/2016 SITE - Stormwater Final Inspection Passed {Activity date: 04/06/2016; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NOT READY AT THIS TIME} ; {Activity date: 07/28/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - FILE YOUR NOI WITH ADEQ} ; {Activity date: 10/20/2015; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NOT READY AT THIS TIME, THIS INSPECTION WILL BE CALLED IN AT A LATER DATE.}
07/28/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 04/06/2016; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE CONTRACTOR NEEDS THE FOLLOWING: 1) INSTALL THE STORMWATER WADDLE AS NEEDED. 2) PROVIDE PROPER WASHOUTS. 3) CATCH BASINS ARE MISSING REBAR, REMOVE AND CALL IN FOR THE INSPECTION PRIOR TO POURING. 4) CALL IN ALL THE SCHEDULED INSPECTIONS PRIOR TO FORMING THE TASK. 5) RE-INSPECT ON 4/15/16 TO VERIFY THAT THE STORMWATER IS PER THE APPROVED PLANS.} ; {Activity date: 07/28/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 10/20/2015; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CONTROLS HAVE BEEN INSTALLED FOR THE FIRST PHASE OF THE WORK. ADDITIONAL MATERIALS MAY BE NEEDED IN THE FUTURE DEPENDING HOW THE WORK PROGRESSES. THE SITE WILL CONTINUE FOR THE CONSTRUCION OF THE NORTHERN BUILDINGS AT THIS TIME, THE SOUTHERN PORTION WILL BE DONE AT A LATER DATE.}
04/22/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/22/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THESE APPEAR TO HAVE BEEN COMPLETED PER THE APPROVED PLANS.} ; {Activity date: 07/28/2016; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - COMPLETE, CALL FOR RE-INSPECTION}
04/22/2020 ENGR Engineering Final Passed {Activity date: 04/22/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THESE APPEAR TO HAVE BEEN COMPLETED PER THE APPROVED PLANS.} ; {Activity date: 08/03/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - AWAITING FINAL INSPECTION} ; {Activity date: 07/28/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) CALL FOR FINAL GRADING INSPECTION FOR PERMIT# DP14-0044
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD
3) PROVIDE AN AS-BUILT DRAWING FOR THE FINAL INSPECTION, SHOWING APPROVED CHANGES MADE TO THE SITE.} ; {Activity date: 04/11/2016; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) PROVIDE COPIES OF YOUR STORM WATER SELF INSPECTIONS REQUIRED BY YOUR PERMIT
2) CONTRCTOR INSTALLING SECTIONS OF 24" CMP TO CONNECT TO EAST CATCH BASIN.
3) CONTRACTOR RE-INSTALLING CENTER CATCH BASIN - CALL FOR INSPECTION WHEN FORMED.
4) ENSURE STORM PIPE SLOPE IS AT 0.5% OR GREATER.
5) ENSURE YOUR SWPPP AND NOI ARE ON SITE DURING CONSTRUCTION

SITE IS IN NON-COMPLIANCE WITH THIER STORM WATER PERMIT.
A CERTIFICATION LETTER FROM THE ENG OF RECORD IS REQUIRED PRIOR TO FINAL APPROVAL}
04/22/2020 ENGR Grading Final Passed {Activity date: 04/22/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THESE APPEAR TO HAVE BEEN COMPLETED PER THE APPROVED PLANS.}

Documents

File Name Document Type  
001_COVER SHEET_C1.0.TIF DEVELOPMENT PACKAGE VIEW
002_NOTES / LEGEND_C1.1.TIF DEVELOPMENT PACKAGE VIEW
003_DEMOLITION_C2.0.TIF DEVELOPMENT PACKAGE VIEW
004_SITE_C3.0.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING_C4.0.TIF DEVELOPMENT PACKAGE VIEW
006_PRIVATE UTILITY_C5.0.TIF DEVELOPMENT PACKAGE VIEW
007_DETAILS_C6.0.TIF DEVELOPMENT PACKAGE VIEW
008_DETAILS_C6.1.TIF DEVELOPMENT PACKAGE VIEW
009_HORIZONTAL CONTROL_C7.0.TIF DEVELOPMENT PACKAGE VIEW
010_HORIZONTAL CONTROL_C7.1.TIF DEVELOPMENT PACKAGE VIEW
011_SWPPP_C8.0.TIF DEVELOPMENT PACKAGE VIEW
012_LANDSCAPE NOTES_L-1.TIF DEVELOPMENT PACKAGE VIEW
013_LANDSCAPE_L2.TIF DEVELOPMENT PACKAGE VIEW
014_IRRIGATION_L-3.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW