Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
03/17/2014
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP/IID - WEST END STATION Originally approved on 9/9/2014 (19 pages) appproved b

Permit Reviews

Permit Number - DP14-0041
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP/IID - WEST END STATION Originally approved on 9/9/2014 (19 pages) appproved b
Start Date Submittal Complete Date Status  
02/04/2016 REVISION - SITE 02/16/2016 COMPLETED Review Details
02/09/2015 RESUB - SITE/GRADING ALL 02/10/2015 COMPLETED Review Details
02/13/2015 RESUB - SITE/GRADING ALL 02/13/2015 COMPLETED Review Details
02/18/2016 REVISION - SITE 11/17/2016 COMPLETED Review Details
03/17/2014 DEV PKG - OK TO SUBMIT 03/17/2014 COMPLETED Review Details
03/17/2014 SITE and/or GRADING 03/28/2014 COMPLETED Review Details
04/09/2014 RESUB - SITE/GRADING ALL 08/22/2014 COMPLETED Review Details
07/28/2017 DEV PKG - REVISION 08/18/2017 COMPLETED Review Details
08/22/2014 RESUB - SITE/GRADING ALL 02/09/2015 COMPLETED Review Details
09/12/2017 DEV PKG - REVISION 04/17/2018 COMPLETED Review Details
10/26/2018 DEV PKG - REVISION 01/23/2019 COMPLETED Review Details
11/29/2016 DEV PKG - RESUBMITTAL 07/11/2017 COMPLETED Review Details

Conditions

Permit Number - DP14-0041
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP/IID - WEST END STATION Originally approved on 9/9/2014 (19 pages) appproved b
Date Description Comments
09/19/2018 Temporary Use Permit associated with D05-0022 shall be removed prior to finaling.

Completed Inspections

Permit Status: Complete
Permit Number: DP14-0041
Permit Description: SITE/GRADING/SWPPP/IID - WEST END STATION Originally approved on 9/9/2014 (19 pages) appproved b
Total Completed Inspections - 7
Date Description Inspector Results Comments
11/30/2018 SITE - Stormwater Follow-up Passed {Activity date: 11/30/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } ; {Activity date: 09/27/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME} ; {Activity date: 08/14/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 07/26/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 03/14/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT REPAIRS TO CONTROLS.} ; {Activity date: 01/24/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 01/10/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT.} ; {Activity date: 01/03/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 12/19/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/06/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 11/20/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 11/15/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/16/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 09/22/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 09/18/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 09/06/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 08/29/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/17/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.}
11/30/2018 ENGR Grading Final Passed {Activity date: 11/30/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - }
11/30/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 11/30/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - }
01/23/2019 SITE - Stormwater Final Inspection Passed {Activity date: 01/23/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/23/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/23/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/17/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 03/08/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 07/28/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/24/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE COT AP PLANS AND NOI.}
05/11/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/11/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by DROBERT5 - } ; {Activity date: 01/25/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL ITEMS AS SHOWN ON THE APPROVED PLANS
(DEVELOPMENT PACKAGE (DP14-0041), PRIVATE IMPROVEMENT AGREEMENT (T17PI00028 AND FUTURE PIA PLANS) THAT MAY BE PULLED TO COMPLETE ALL OF THE LANDSCAPING AND OTHER ITEMS AS DETERMINED BY DEVELOPMENT SERVICES AND THE TRANSPORTATION DEPARTMENTS.
THIS WILL INCLUDE PROVIDING THIS DEPARTMENT WITH ALL APPROVED REVISIONS, CERTIFICATION LETTER FROM THE ENGINEER OF RECORD THAT THE SITE HAS BEEN CONSTRUCTED PER THE APPROVED PLANS. THE N.O.T. NOTICE OF TERMINATION FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR THE STORMWATER POLLUTION PREVENTION PLAN FOR THIS SITE, AND ANY OTHER DOCUMENT THAT MAY BE DETERMINED TO BE NEEDED IN THE FUTURE BY EITHER PDSD OR TDOT.} ; {Activity date: 01/23/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THIS SITE AS SHOWN ON THE APPROVED PLANS.} ; {Activity date: 01/24/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - IT APPEARS THAT THE WORK FOR THIS SITE HAS BEEN COMPLETED EXCEPT FOR GENERAL CLEANUP, AND THE WORK WITHIN THE PUBLIC RIGHTS-OF-WAY. I HAVE ASKED THE DEVELOPER TO PROVIDE US WITH A LETTER FROM THE CITY OF TUCSON FOR ALL THE WORK THAT HAS BEEN ELIMINATED FROM THIS PROJECT AND HAS BEEN ADDED ONTO THE PUBLIC IMPROVEMENT AGREEMENTS PLANS NUMBER I-2017-010 (
PIA #) PERMIT # T17PI00028. THE ACKNOWLEDGEMENT OF THIS INFORMATION WILL ALLOW US TO CLOSE OUT OF THIS PERMIT AND DP14-0041.} ; {Activity date: 01/16/2019; Status: Not ready for Inspection; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - Contractor installing DG, side walk covered with dirt.} ; {Activity date: 11/30/2018; Status: Not ready for Inspection; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - work is in progress}
05/11/2020 ENGR Engineering Final Passed {Activity date: 05/11/2020; Status: Approved; Inspector: DROBERT5; Comment: Entered by DROBERT5 - } ; {Activity date: 04/25/2019; Status: Approved; Inspector: DROBERT5; Comment: Entered by DROBERT5 - MET WITH TOFEL ONSITE TO DISCUSS THE FINAL COMMENTS THAT I HAVE FOR THIS SITE. THEY WILL BE WORKING WITH WLB TO WORK OUT THE FINAL REVISED DRAWING AND THE INSTALLATION OF THE TREES IN THE SOUTHERN PARKING LOT IF THEY CANNOT BE REMOVED.} ; {Activity date: 01/25/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL ITEMS AS SHOWN ON THE APPROVED PLANS
(DEVELOPMENT PACKAGE (DP14-0041), PRIVATE IMPROVEMENT AGREEMENT (T17PI00028 AND FUTURE PIA PLANS) THAT MAY BE PULLED TO COMPLETE ALL OF THE LANDSCAPING AND OTHER ITEMS AS DETERMINED BY DEVELOPMENT SERVICES AND THE TRANSPORTATION DEPARTMENTS.
THIS WILL INCLUDE PROVIDING THIS DEPARTMENT WITH ALL APPROVED REVISIONS, CERTIFICATION LETTER FROM THE ENGINEER OF RECORD THAT THE SITE HAS BEEN CONSTRUCTED PER THE APPROVED PLANS. THE N.O.T. NOTICE OF TERMINATION FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR THE STORMWATER POLLUTION PREVENTION PLAN FOR THIS SITE, AND ANY OTHER DOCUMENT THAT MAY BE DETERMINED TO BE NEEDED IN THE FUTURE BY EITHER PDSD OR TDOT.} ; {Activity date: 01/24/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - IT APPEARS THAT THE WORK FOR THIS SITE HAS BEEN COMPLETED EXCEPT FOR GENERAL CLEANUP, AND THE WORK WITHIN THE PUBLIC RIGHTS-OF-WAY. I HAVE ASKED THE DEVELOPER TO PROVIDE US WITH A LETTER FROM THE CITY OF TUCSON FOR ALL THE WORK THAT HAS BEEN ELIMINATED FROM THIS PROJECT AND HAS BEEN ADDED ONTO THE PUBLIC IMPROVEMENT AGREEMENTS PLANS NUMBER I-2017-010 (
PIA #) PERMIT # T17PI00028. THE ACKNOWLEDGEMENT OF THIS INFORMATION WILL ALLOW US TO CLOSE OUT OF THIS PERMIT AND DP14-0041.} ; {Activity date: 01/23/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE WORK ON THIS SITE AS SHOWN ON THE APPROVED PLANS.} ; {Activity date: 01/16/2019; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - Dirt lot to south has been cleared.} ; {Activity date: 11/30/2018; Status: Not ready for Inspection; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - Inspector has no issues preventing TCO}

Documents

File Name Document Type  
001_MASTER COVER SHEET_1 OF 19.TIF DEVELOPMENT PACKAGE VIEW
002_DEMOLITION_2 OF 19.TIF DEVELOPMENT PACKAGE VIEW
003_SITE_3 OF 19.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / PAVING / DRAINAGE_4 OF 19.TIF DEVELOPMENT PACKAGE VIEW
005_PRIVATE UTILITY_5 OF 19.TIF DEVELOPMENT PACKAGE VIEW
006_NOTES / DETAILS_6 OF 19.TIF DEVELOPMENT PACKAGE VIEW
007_NOTES / DETAILS_7 OF 19.TIF DEVELOPMENT PACKAGE VIEW
008_NOTES / DETAILS_8 OF 19.TIF DEVELOPMENT PACKAGE VIEW
009_SWPPP_9 OF 19.TIF DEVELOPMENT PACKAGE VIEW
010_SWPPP_10 OF 19.TIF DEVELOPMENT PACKAGE VIEW
011_SWPPP_11 OF 19.TIF DEVELOPMENT PACKAGE VIEW
012_SWPPP_12 OF 19.TIF DEVELOPMENT PACKAGE VIEW
013_SWPPP_13 OF 19.TIF DEVELOPMENT PACKAGE VIEW
014_LANDSCAPE_14 OF 19.TIF DEVELOPMENT PACKAGE VIEW
015_LANDSCAPE_15 OF 19.TIF DEVELOPMENT PACKAGE VIEW
016_LANDSCAPE_16 OF 19.TIF DEVELOPMENT PACKAGE VIEW
017_LANDSCAPE_17 OF 19.TIF DEVELOPMENT PACKAGE VIEW
018_LANDSCAPE_18 OF 19.TIF DEVELOPMENT PACKAGE VIEW
019_LANDSCAPE_19 OF 19.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW
R3.1A_WEST END STATION REVISION LETTER_JULY 2017.PDF DOCUMENTS VIEW
R3.1E_SIGNED CHECKLIST.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
R3.1A_WEST END STATION REVISION LETTER_JULY 2017.PDF DOCUMENTS VIEW
R3.1D_IID-14-01_DL_2.PDF DOCUMENTS VIEW
R3.1D_IID-14-01_DL_2.PDF DOCUMENTS VIEW