Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/30/2018 |
ENGR Grading Final |
bbenedo1 |
Approved |
Entered by BBENEDO1 - |
| 11/30/2018 |
ENGR Grading Final |
bbenedo1 |
Approved |
Entered by BBENEDO1 - |
| 11/30/2018 |
ENGR Grading Final |
bbenedo1 |
Approved |
Entered by BBENEDO1 - |
| 08/11/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ON SITE ABOUT NOI. |
| 11/30/2018 |
ENGR Grading Final |
bbenedo1 |
Approved |
Entered by BBENEDO1 - |
| 09/27/2018 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - CREWS ARE WORKING ON THE INSTALLATION OF THE ONSITE CURBSON THE SOUTHSIDE OF THE SITE. |
| 07/26/2018 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME. |
| 05/17/2018 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO GRADING ACTIVITY ON SITE. |
| 10/27/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - PERIMETER DRAIN 4'' AROUND BUILDING PER AP PLANS ON P-PAGE. |