Permit: DP14-0020
Permit Details
Status:
Complete
Type:
Development Package
Address:
6520 S I19 FRONTAGE RD
Address NEW:
6520 S I19 FRONTAGE RD
Apply Date:
02/11/2014
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP Orginally approved 12/03/2014.First Revision approved 10/05/2015 (all 44 pa
Permit Reviews
Permit Number - DP14-0020
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP Orginally approved 12/03/2014.First Revision approved 10/05/2015 (all 44 pa
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/11/2014 | DEV PKG - OK TO SUBMIT | 02/11/2014 | COMPLETED |
| 03/21/2014 | DEV PKG | 04/24/2014 | COMPLETED |
| 05/21/2014 | DEV PKG - RESUBMITTAL | 11/14/2014 | COMPLETED |
| 09/15/2015 | DEV PKG - REVISION | 10/06/2015 | COMPLETED |
| 11/17/2014 | DEV PKG - RESUBMITTAL | 05/20/2015 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP14-0020
Permit Description: SITE/GRADING/SWPPP Orginally approved 12/03/2014.First Revision approved 10/05/2015 (all 44 pa
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/25/2015 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 11/25/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 11/25/2015 | ENGR Engineering Final | Passed | {Activity date: 11/25/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 11/18/2015; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE APPROVIED COLOR FOR SYMBOL IN ACCESSIBLE PARKING AREA. AND COMPLET ALL WORK ON AP PLANS.} | |
| 11/25/2015 | SITE - Stormwater Follow-up | Passed | {Activity date: 11/25/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 06/10/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT TRACK OUT.} ; {Activity date: 05/06/2015; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 05/14/2015; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME FOR THIS ITEM.} | |
| 11/25/2015 | ENGR Grading Final | Passed | {Activity date: 11/25/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 11/25/2015 | SITE - Stormwater Final Inspection | Passed | {Activity date: 11/25/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 11/25/2015 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 11/25/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/08/2015; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LOOKED OVER THE SITE AND IT APPEARS THAT THE DEVELOPER HAS INSTALLED ALL THE MATERIAL THAT IS NEEDED AT THIS TIME.} ; {Activity date: 05/06/2015; Status: Partial Approval; Inspector: MPUGH; Comment: Entered by CSHARRA1 - OK TO BACKFILL MANHOLE TO FRONT CATCH BASIN} | |
| 11/25/2015 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 11/25/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/06/2015; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CREW HAS INSTALLED SOME OF THE STORMWATER CONTROLS ON THIS SITE AND THE ROCK FOR THE ENTRANCE.} ; {Activity date: 04/29/2015; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP 2) CALL FOR RE-INSPECTION WHEN CONTROLS ARE IN PLACE 3) POST A COPY OF YOUR NOI ON SITE 4) SWEEP UP ANY TRACKED SOIL OFF OF PUBLIC ROADWAYS 5) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT TOT THE SITE 6) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP.} |