Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 11/25/2015 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 05/06/2015 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - CREW HAS INSTALLED SOME OF THE STORMWATER CONTROLS ON THIS SITE AND THE ROCK FOR THE ENTRANCE. |
| 04/29/2015 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Partial Approval |
Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) CALL FOR RE-INSPECTION WHEN CONTROLS ARE IN PLACE
3) POST A COPY OF YOUR NOI ON SITE
4) SWEEP UP ANY TRACKED SOIL OFF OF PUBLIC ROADWAYS
5) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT TOT THE SITE
6) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP. |