Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: DP14-0020

Parcel: Unknown

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
11/25/2015 PDSD Engineering Division Pre-Construction SITE RLEDONNE Approved Entered by RLEDONN1 -
05/06/2015 PDSD Engineering Division Pre-Construction SITE DROBERTS Partial Approval Entered by DROBERT5 - CREW HAS INSTALLED SOME OF THE STORMWATER CONTROLS ON THIS SITE AND THE ROCK FOR THE ENTRANCE.
04/29/2015 PDSD Engineering Division Pre-Construction SITE MRUSSO Partial Approval Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP 2) CALL FOR RE-INSPECTION WHEN CONTROLS ARE IN PLACE 3) POST A COPY OF YOUR NOI ON SITE 4) SWEEP UP ANY TRACKED SOIL OFF OF PUBLIC ROADWAYS 5) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT TOT THE SITE 6) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP.