Permit: DP14-0016
Permit Details
Apply Date:
02/04/2014
Applicant:
Lisa Bowers
Description:
GRADING ONLY
Permit Reviews
Permit Number - DP14-0016
Permit Status: Complete
Permit Description: GRADING ONLY
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/04/2014 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 02/04/2014 | COMPLETED |
02/05/2014 | GRADING | 03/13/2014 | COMPLETED |
03/13/2014 | RESUB - SITE and/or GRADING | 03/25/2014 | COMPLETED |
03/25/2014 | RESUB - SITE and/or GRADING | 05/05/2014 | COMPLETED |
08/05/2014 | REVISION - GRADING | 08/05/2014 | COMPLETED |
08/21/2014 | REVISION - GRADING | 08/22/2014 | COMPLETED |
Conditions
Permit Number - DP14-0016
Permit Status: Complete
Permit Description: GRADING ONLY
Date | Description | Comments |
---|---|---|
02/28/2014 | The following 8 conditions apply to permit DP14-0016:1)Call for Pre-construction meeting, intermediate and final inspections. 2)This plan acts as the Grading Plan for reconstructed parking lot in the center of the hospital campus. 3)Temporary erosion/stormwater controls may be used at entrance to existing pipe and be field adjusted with discussions with Contractor and Engineer of record and Inspector as necessary.4)There shall be no disturbance outside of the approved disturbance/grading limits.5)Any revision to the Grading Plan may require a re-submittal of a revised grading plan for review. Contact PDSD Engineering to discuss changes in grading design.6)If grading construction is expected to last longer than the expiration date of the grading permit, contact PDSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.7)The permitee shall notify PDSD when the grading operation is ready for final grading inspection. 8)Prior to request for final grading inspection approval, all erosion control improvements shall be installed and accepted by PDSD including rock / established revegetation for all disturbed areas if not improved as per approved plan. As-builts shall be provided. | |
03/20/2014 | The following 8 conditions apply to permit DP14-0016:1)Call for Pre-construction meeting, intermediate and final inspections. 2)This plan acts as the Grading Plan for reconstructed parking lot in the center of the hospital campus. 3)Temporary erosion/stormwater controls may be used at entrance to existing pipe and be field adjusted with discussions with Contractor and Engineer of record and Inspector as necessary.4)There shall be no disturbance outside of the approved disturbance/grading limits.5)Any revision to the Grading Plan may require a re-submittal of a revised grading plan for review. Contact PDSD Engineering to discuss changes in grading design.6)If grading construction is expected to last longer than the expiration date of the grading permit, contact PDSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.7)The permitee shall notify PDSD when the grading operation is ready for final grading inspection. 8)Prior to request for final grading inspection approval, all erosion control improvements shall be installed and accepted by PDSD including rock / established revegetation for all disturbed areas if not improved as per approved plan. As-builts shall be provided. |
Completed Inspections
Permit Status: Complete
Permit Number: DP14-0016
Permit Description: GRADING ONLY
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2014 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 07/18/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 07/17/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE, NO SWPPP REQUIRED. 2) RAINING AT THE TIME OF INSPECTION, NO CONSTRUCTION ACTIVITY, WILL RE-INSPECT.} ; {Activity date: 07/15/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY} ; {Activity date: 07/09/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY AT THIS TIME} ; {Activity date: 07/02/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY} ; {Activity date: 06/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY OR CONCERNS AT THIS TIME} ; {Activity date: 06/09/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO INSPECTIONS CALLED IN, NO ACTIVITY AT THIS TIME} ; {Activity date: 06/05/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION AT THIS TIME} ; {Activity date: 06/03/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY NO CONSTRUCTION AT THIS TIME} |
|
07/29/2014 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 07/29/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 07/18/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN PLACED IN FRONT OF EXISTING CATCH BASIN WHERE STORM WATER FROM PARKING AREA DRAINS 2) SITE IS LESS THAN 1 ACRE, THEREFORE A SWPPP IS NOT REQUIRED} |
|
08/13/2014 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/13/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 07/23/2014; Status: Not Applicable; Inspector: ACONNOR; Comment: Entered by CPIERCE1 - NOT NEEDED PER ANDY CONNOR} | |
08/27/2014 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/27/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 08/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 08/07/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 07/29/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} | |
09/04/2014 | SITE - Stormwater Final Inspection | Passed | {Activity date: 09/04/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE HAS BEEN PAVED, ENSURE ALL SEDIMENT CONTROLS ARE PICKED UP.} ; {Activity date: 08/27/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MAJORITY OF SITE IS STABILIZED} | |
09/16/2014 | ENGR Engineering Final | Passed | {Activity date: 09/16/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/09/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) COMPLETE RIP RAP ALONG SLOPE SW SIDE 2) INSTALL BOLLARDS SHOWN ALONG DRAINAGE OR REMOVE FROM PLAN 3) COMPLETE CONSTRUCTION TO INCLUDE STEPS SHOWN ON PLAN SW SIDE 4) INSTALL DIRECTIONAL SIGNS PER PLAN 5) CUT OR REMOVE CURB TO ENSURE A 24' PAAL NORTH ENTRANCE 6) INSTALL ORFICE PLATE ON EXISTING DRAIN PIPE} ; {Activity date: 09/04/2014; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PROVIDE AN APPROVED PLAN THAT SHOW ALL CHANGES MADE.} ; {Activity date: 08/27/2014; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE CONSTRUCTION CALL FOR RE-INSPECTION} |
|
09/16/2014 | ENGR Grading Final | Passed | {Activity date: 09/16/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 08/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CHANGE TO INSTALL PARKING LOT LIGHTING. ENSURE PLAN IS APPROVED BY THE CITY OF TUCSON. INSPECTED CONDUIT FOR PARKING LOT LIGHTING : 24"DEPTH IN PARKING AREA AND 18" IN ISLANDS. WILL INSPECT LIGHT POLES RE-BAR LAYOUT PRIOR TO POURING OF CONCRETE} |
|
10/28/2014 | RSBU - Building Final | Passed | {Activity date: 10/28/2014; Status: Approved; Inspector: kmedina; Comment: Entered by KMEDINA1 - } |