Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/18/2014 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 08/27/2014 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 08/13/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - INSPECTED CONDUIT FOR PARKING LOT LIGHTING : 24"DEPTH IN PARKING AREA AND 18" IN ISLANDS. WILL INSPECT LIGHT POLES RE-BAR LAYOUT PRIOR TO POURING OF CONCRETE |
| 07/29/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - CONTRACTOR ON HOLD SOME CHANGES MADE DUE TO EXISTING GRADES |
| 07/18/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) CALL FOR INSPECTION FOR ANY CHANGES AND/OR CONCERNS
2) PROVIDE A LANDSCAPE PLAN FOR FINAL INSPECTION
3) ENSURE SEDIMENT CONTROLS REMAIN IN PLACE UNTIL THE SITE IS PAVED |
| 08/29/2014 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - INSTALL OF LIGHT POLE BASES X 3. RE-BAR LAYOUT AND FORMS PER PLAN. SPECIAL INSPECTION WILL BE PERFORMED AND SUBMITTED |
| 09/16/2014 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 08/13/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - CHANGE TO INSTALL PARKING LOT LIGHTING. ENSURE PLAN IS APPROVED BY THE CITY OF TUCSON.
INSPECTED CONDUIT FOR PARKING LOT LIGHTING : 24"DEPTH IN PARKING AREA AND 18" IN ISLANDS. WILL INSPECT LIGHT POLES RE-BAR LAYOUT PRIOR TO POURING OF CONCRETE |