Description:
QT STORE #1464Original approved 12/03/2014 1st Revision (As Built) Pages 4,5,6,7,9,10,17,18,

Permit Reviews

Permit Number - DP13-0226
Permit Status: Complete
Permit Description: QT STORE #1464Original approved 12/03/2014 1st Revision (As Built) Pages 4,5,6,7,9,10,17,18,
Start Date Submittal Complete Date Status  
06/03/2014 DEV PKG - RESUBMITTAL 09/03/2014 COMPLETED Review Details
09/03/2014 DEV PKG - RESUBMITTAL 10/14/2015 COMPLETED Review Details
10/14/2015 DEV PKG - REVISION 12/15/2015 COMPLETED Review Details
11/13/2013 DEV PKG - OK TO SUBMIT 11/13/2013 COMPLETED Review Details
11/13/2013 DEV PKG 06/03/2014 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0226
Permit Description: QT STORE #1464Original approved 12/03/2014 1st Revision (As Built) Pages 4,5,6,7,9,10,17,18,
Total Completed Inspections - 7
Date Description Inspector Results Comments
04/17/2015 SITE - Stormwater Setup and Controls Passed {Activity date: 04/17/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEDIMENT CONTROLS HAVE BEEN INSTALLED PER THE APPROVED SWPPP. ENSURE EXISTING STORMDRAIN LINES ARE PROTECTED AGAINST CONSTRUCTION DEBRIS AND SOIL.}
04/17/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/17/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/13/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MET WITH SUPERINTENDENT ON SITE
2) CONSTRUCTION TO START NEXT WEEK
3) WILL SCHEDULE A PRE-CON FOR PROJECT} ; {Activity date: 03/04/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - BLDG DEMOLISHED, NO OTHER ACTIVITY AT THIS TIME} ; {Activity date: 02/10/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY HOWEVER SITE HAS BEEN DEMO'D AND PREPED FOR CONSTRUCTION} ; {Activity date: 01/21/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY} ; {Activity date: 12/09/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - DEMO WORK FOR OLD BLDG} ; {Activity date: 12/03/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES/NO ACTIVITY} ; {Activity date: 11/21/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY} ; {Activity date: 10/29/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY} ; {Activity date: 09/11/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION} ; {Activity date: 09/03/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONTACT NO CONSTRUCTION} ; {Activity date: 08/14/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY} ; {Activity date: 08/05/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION} ; {Activity date: 07/31/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES} ; {Activity date: 07/15/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY} ; {Activity date: 06/12/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY} ; {Activity date: 06/05/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION AT THIS TIME} ; {Activity date: 05/07/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION} ; {Activity date: 03/17/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION} ; {Activity date: 03/12/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONTACT ON SITE, NO CONSTRUCTION AT THIS TIME} ; {Activity date: 02/28/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION} ; {Activity date: 02/20/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONSTRUCTION/NO ACTIVITY ON SITE} ; {Activity date: 02/11/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONSTRUCTION OR ACTIVITY ON SITE} ; {Activity date: 01/27/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION} ; {Activity date: 01/16/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONTACT ON SITE, NO CONSTRUCTION AT THIS TIME}
10/08/2015 SITE - Stormwater Follow-up Passed {Activity date: 10/08/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MAJORITY OF SITE IS STABILIZED.
CLEAN OUT CATCH BASINS PRIOR TO FINAL APPROVAL} ; {Activity date: 09/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/09/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 08/11/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) WALKED SITE, SITE PARTIALLY PAVED
2) STORM DRAIN LINES INSTALLED
3) CONTRACTOR WORKING ON RIGHT-OF WAY WITH DEPT OF TRANSPORTATION
4) NO SIGNIFICANT STORM WATER ISSUES, SWEEP UP TRACKED SOIL} ; {Activity date: 07/15/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SOME CURB WORK AN INSTALLATION OF SLEEVES FOR IRRIGATION
2) SOME AB INSTALLED FOR PAVING ON SITE
3) ENSURE COMPLIANCE WITH SWPPP} ; {Activity date: 06/23/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/09/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) RE-BAR LAY OUT FOR SIDEWALK CURBING PER APPROVED PLANS
2) BUBBLER BOX BEING INSTALLED ALONG THE WEST SIDE OF THE BLDG PER DETAIL AC-C540 4 FOOT DEPTH MIN.
3) CANOPY STORM DRAIN LAYOUT PER APPROVED PLANS - CLEANOUT AT BOTH ENDS OF RUN.
4) STORM DRAIN TIE-IN AND MANHOLE INSTALLED - OK
5) NO STORM WATER CONCERNS AT THIS TIME

TOOK PICS OF ALL ABOVE} ; {Activity date: 05/29/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) TOOK PICTURES OF INSTALL OF MANHOLE ALONG FORT LOWELL, #6 RE-BAR IN FLOOR OF MANHOLE, PRE-CAST RINGS
2) SWEEP UP TRACKING OFF OF PARKING AREA} ; {Activity date: 05/28/2015; Status: Continued; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - 1) #4 BARS AT 6" OC EACH DIRECTION PER F1 ON SHEET C540 FOR CATCH BASIN ON SE CORNER AND INLET ALONG EAST SIDE
2) STORM WATER MANHOLES INSTALLED PER COT STD DTL 309 AND 302
3) TYPE #4 CATCH BASIN INSTALLED PER COT STD DTL 309 AND 311.
4) NO STORM WATER CONCERNS AT THIS TIME. PERFORM STORM WATER SELF INSPECTIONS AND SWEEP UP TRACKING ROUTINELY
5) CALL FOR INSPECTION FOR RE-BAR LAYOUT OF CATCH BASINS} ; {Activity date: 05/04/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SWEEP UP TRACKING OFF OF FT LOWELL RD AND ORACLE} ; {Activity date: 04/29/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
SWEEP UP TRACKING} ; {Activity date: 04/17/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MAY NEED TO ADD SEDIMENT CONTROLS IN FRONT OF EXISTING STORM DRAIN LINES.
2) SWEEP UP TRACKING ROUTINELY
3) PERFORM STORM WATER SELF INSPECTIONS PER PLAN
4) INSTALL WASH-OUT WHEN APPLICABLE} ; {Activity date: 04/15/2015; Status: Violation; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS IN NON-COMPLIANCE WITH SWPPP
2) CALL INSPECTION IN FOR PRE-CON
3) PROVIDE SWPPP AND APPROVED SITE/GRADING PLAN
4) IMPLEMENT SWPPP
5) SWEEP UP TRACKED SOIL OFF OF ORACLE AND FT LOWELL.} ; {Activity date: 03/19/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by ARUIZ1 - SITE HAS BEEN DEMO'D NO SITE/GRADING AT THIS TIME}
10/13/2015 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/13/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
10/13/2015 SITE - Stormwater Final Inspection Passed {Activity date: 10/13/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
10/20/2015 ENGR Grading Final Passed {Activity date: 10/20/2015; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
11/23/2015 ENGR Engineering Final Passed {Activity date: 11/23/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/20/2015; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS: 1) PROVIDE THE SEQUENCE NUMBERS AS PREVIOUSLY NOTED BY MIKE RUSSO AND NOTED IN THE LOCKS, HOLDS, AND NOTICES. 2) PROVIDE REVISED DRAWINGS FOR CHANGES THAT HAVE BEEN MADE TO THE SITE. THE CERTIFICATION LETTER IS ACCEPTABLE AT THIS TIME IF THERE HAVE BEEN NO CHANGES FOR THIS SITE. 3) COMPLETE THE STRIPED PEDESTRIAN ACCESS AISLE ON THE NORTH WEST SIDE OF THE SITE ALONG WITH THE WHEEL CHAIR ACCESS RAMP AS NOTED ON THE APPROVED PLANS. 4) PROVIDE CONTRASTING COLORS BETWEEN ALL PAVEMENT HANDICAP MARKINGS WITHIN THE SCOPE OF THE SITE PER THE ICC SECTION 703.6.2 FINISH AND CONTRAST: SYNBOLS OF ACCESSIBILITY AND THEIR BACKGROUND SHALL HAVE A NON-GLARE FINISH. SYMBOLS OF ACCESSIBILITY SHALL CONTRAST WITH THEIR BACKGROUND, WITH EITHER A LIGHT SYMBOL ON A DARK BACKGROUND OR A DARK SYMBOL ON A LIGHT BACK GROUND.} ; {Activity date: 10/13/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD.
2) PROVIDE AN AS-BUILT PLAN
3) PROVIDE THE SEQUENCE NUMBERS FOR PEDESTRIAN ACCESS OFF OF ORACLE AND THE CROSS ACCESS AGREEMNET FOR THE PARKING LOT

CALL FOR RE-INSPECTION} ; {Activity date: 10/08/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL
1) ENSURE WATER HARVESTING IS COMPLETED PER APPROVED PLAN
2) ENSURE CATCH BASINS HAVE BEEN CLEAN OUT
3) SLOPES MUST MEET APPROVED PLANS
4) PROVIDE A CERT LETTER FROM THE ENG OF RECORD AN SUBMIT AN AS-BUILT TO THE COT}

Documents

File Name Document Type  
001_COVER SHEET_C001.TIF DEVELOPMENT PACKAGE VIEW
002_GENERAL NOTES SHEET_C002.TIF DEVELOPMENT PACKAGE VIEW
003_DEMOLITION_C030.TIF DEVELOPMENT PACKAGE VIEW
004_SITE_C100.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING_C110.TIF DEVELOPMENT PACKAGE VIEW
006_DETAILED GRADING_C111.TIF DEVELOPMENT PACKAGE VIEW
007_DETAILED CANOPY GRADING_C112.TIF DEVELOPMENT PACKAGE VIEW
008_ADA COMPLIANCE REFERENCE_C113.TIF DEVELOPMENT PACKAGE VIEW
009_STORM_C120.TIF DEVELOPMENT PACKAGE VIEW
010_PAVING_C130.TIF DEVELOPMENT PACKAGE VIEW
011_BUILDING PAVING_C131.TIF DEVELOPMENT PACKAGE VIEW
012_SWPPP COVER_C140.TIF DEVELOPMENT PACKAGE VIEW
013_SWPPP NOTES_C141.TIF DEVELOPMENT PACKAGE VIEW
014_SWPPP INSPECTION SHEET_C142.TIF DEVELOPMENT PACKAGE VIEW
015_EROSION CONTROL PHASE 1_C143.TIF DEVELOPMENT PACKAGE VIEW
016_EROSION CONTROL PHASE 2_C144.TIF DEVELOPMENT PACKAGE VIEW
017_UTILITY_C150.TIF DEVELOPMENT PACKAGE VIEW
018_SECURITY_C170.TIF DEVELOPMENT PACKAGE VIEW
019_MISC. SITE DETAILS SHEET 1_C500.TIF DEVELOPMENT PACKAGE VIEW
020_MISC. SITE DETAILS SHEET 2_C501.TIF DEVELOPMENT PACKAGE VIEW
021_ADA DETAILS SHEET 1_C510.TIF DEVELOPMENT PACKAGE VIEW
022_ADA DETAILS SHEET 2_C511.TIF DEVELOPMENT PACKAGE VIEW
023_PAVING DETAILS SHEET 1_C520.TIF DEVELOPMENT PACKAGE VIEW
024_PAVING DETAILS SHEET 2_C521.TIF DEVELOPMENT PACKAGE VIEW
025_PAVING DETAILS SHEET 3_C522.TIF DEVELOPMENT PACKAGE VIEW
026_PAVING DETAILS SHEET 4_C523.TIF DEVELOPMENT PACKAGE VIEW
027_PAVING DETAILS SHEET 5_C524.TIF DEVELOPMENT PACKAGE VIEW
028_TRENCHING DETAILS SHEET 1_C530.TIF DEVELOPMENT PACKAGE VIEW
029_TRENCHING DETAILS SHEET 2_C531.TIF DEVELOPMENT PACKAGE VIEW
030_DRAINAGE DETAILS SHEET 1_C540.TIF DEVELOPMENT PACKAGE VIEW
031_EROSION CONTROL DETAILS SHEET 1_C570.TIF DEVELOPMENT PACKAGE VIEW
032_CITY OF TUCSON DETAILS SHEET 1_C571.TIF DEVELOPMENT PACKAGE VIEW
033_CITY OF TUCSON DETAILS SHEET 2_C572.TIF DEVELOPMENT PACKAGE VIEW
034_CITY OF TUCSON DETAILS SHEET 3_C573.TIF DEVELOPMENT PACKAGE VIEW
035_CITY OF TUCSON DETAILS SHEET 4_C574.TIF DEVELOPMENT PACKAGE VIEW
036_LANDSCAPE_L100.TIF DEVELOPMENT PACKAGE VIEW
037_PLANTING_L101.TIF DEVELOPMENT PACKAGE VIEW
038_RAINWATER HARVESTING_L102.TIF DEVELOPMENT PACKAGE VIEW
039_IRRIGATION_L110.TIF DEVELOPMENT PACKAGE VIEW
040_LANDSCAPING DETAILS SHEET 1_L500.TIF DEVELOPMENT PACKAGE VIEW
041_IRRIGATION DETAILS SHEET 1_L510.TIF DEVELOPMENT PACKAGE VIEW
042_IRRIGATION DETAILS SHEET 2_L511.TIF DEVELOPMENT PACKAGE VIEW