Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP13-0226
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/13/2015 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
10/13/2015 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
10/08/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - PRIOR TO FINAL APPROVAL 1) ENSURE WATER HARVESTING IS COMPLETED PER APPROVED PLAN 2) ENSURE CATCH BASINS HAVE BEEN CLEAN OUT 3) SLOPES MUST MEET APPROVED PLANS 4) PROVIDE A CERT LETTER FROM THE ENG OF RECORD AN SUBMIT AN AS-BUILT TO THE COT |
09/09/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - FOLLOW UP INSPECTION FOR PROGRESS. PRIOR TO FINAL PROVIDE A CERT STATEMENT FROM THE EOR PROVIDE AN APPROVED SET OF PLANS FOR FINAL INSPECTION |
08/11/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) WALKED SITE, SITE PARTIALLY PAVED 2) STORM DRAIN LINES INSTALLED 3) CONTRACTOR WORKING ON RIGHT-OF WAY WITH DEPT OF TRANSPORTATION 4) NO SIGNIFICANT STORM WATER ISSUES, SWEEP UP TRACKED SOIL |
07/15/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) SOME CURB WORK AN INSTALLATION OF SLEEVES FOR IRRIGATION 2) SOME AB INSTALLED FOR PAVING ON SITE 3) ENSURE COMPLIANCE WITH SWPPP |
06/16/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR INSTALLED 6" AND 4" LATERAL STORM DRAIN LINE AROUNDNEW BLDG. 2) LINE WAS INSTALLED AND GRADED TO DRAIN PER PLANS. ENSURE PVC IS BEDDED PRIOR TO COVER. |
06/09/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) RE-BAR LAY OUT FOR SIDEWALK CURBING PER APPROVED PLANS 2) BUBBLER BOX BEING INSTALLED ALONG THE WEST SIDE OF THE BLDG PER DETAIL AC-C540 4 FOOT DEPTH MIN. 3) CANOPY STORM DRAIN LAYOUT PER APPROVED PLANS - CLEANOUT AT BOTH ENDS OF RUN. 4) STORM DRAIN TIE-IN AND MANHOLE INSTALLED - OK 5) NO STORM WATER CONCERNS AT THIS TIME TOOK PICS OF ALL ABOVE |
05/28/2015 | ENGR Grading Final | MRUSSO1 | Continued | Entered by DROBERT5 - 1) #4 BARS AT 6" OC EACH DIRECTION PER F1 ON SHEET C540 FOR CATCH BASIN ON SE CORNER AND INLET ALONG EAST SIDE 2) STORM WATER MANHOLES INSTALLED PER COT STD DTL 309 AND 302 3) TYPE #4 CATCH BASIN INSTALLED PER COT STD DTL 309 AND 311. 4) NO STORM WATER CONCERNS AT THIS TIME. PERFORM STORM WATER SELF INSPECTIONS AND SWEEP UP TRACKING ROUTINELY 5) CALL FOR INSPECTION FOR RE-BAR LAYOUT OF CATCH BASINS |
05/07/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR INSTALLED STORM PIPE, SLOPES AND BEDDING OK. CALL FOR INSPECTION FOR RE-BAR LAY OUT OF MANHOLE FLOORS AND/OR PRIOR TO COVER OF MANHOLE CONNECTIONS |
05/04/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR INSTALLING 24" SRP AT 3% SLOPE ALONG THE SOUTH SIDE OF SITE 2) STORM PIPE WILL CONSIST OF 24" TRANSITION INTO 18" WITH TWO MANHOLES AND A CATCH BASIN 3) STORM PIPE INSTALLED PER APPROVED PLAN - OK TO COVER |
10/20/2015 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |