Permit: DP13-0226

Parcel: 10603087D


Addresses:

3200 N ORACLE RD


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP13-0226

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
10/13/2015 ENGR Grading Final MRUSSO Approved Entered by DROBERT5 -
10/13/2015 ENGR Grading Final MRUSSO Approved Entered by DROBERT5 -
10/08/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - PRIOR TO FINAL APPROVAL 1) ENSURE WATER HARVESTING IS COMPLETED PER APPROVED PLAN 2) ENSURE CATCH BASINS HAVE BEEN CLEAN OUT 3) SLOPES MUST MEET APPROVED PLANS 4) PROVIDE A CERT LETTER FROM THE ENG OF RECORD AN SUBMIT AN AS-BUILT TO THE COT
09/09/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - FOLLOW UP INSPECTION FOR PROGRESS. PRIOR TO FINAL PROVIDE A CERT STATEMENT FROM THE EOR PROVIDE AN APPROVED SET OF PLANS FOR FINAL INSPECTION
08/11/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) WALKED SITE, SITE PARTIALLY PAVED 2) STORM DRAIN LINES INSTALLED 3) CONTRACTOR WORKING ON RIGHT-OF WAY WITH DEPT OF TRANSPORTATION 4) NO SIGNIFICANT STORM WATER ISSUES, SWEEP UP TRACKED SOIL
07/15/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) SOME CURB WORK AN INSTALLATION OF SLEEVES FOR IRRIGATION 2) SOME AB INSTALLED FOR PAVING ON SITE 3) ENSURE COMPLIANCE WITH SWPPP
06/16/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) CONTRACTOR INSTALLED 6" AND 4" LATERAL STORM DRAIN LINE AROUNDNEW BLDG. 2) LINE WAS INSTALLED AND GRADED TO DRAIN PER PLANS. ENSURE PVC IS BEDDED PRIOR TO COVER.
06/09/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) RE-BAR LAY OUT FOR SIDEWALK CURBING PER APPROVED PLANS 2) BUBBLER BOX BEING INSTALLED ALONG THE WEST SIDE OF THE BLDG PER DETAIL AC-C540 4 FOOT DEPTH MIN. 3) CANOPY STORM DRAIN LAYOUT PER APPROVED PLANS - CLEANOUT AT BOTH ENDS OF RUN. 4) STORM DRAIN TIE-IN AND MANHOLE INSTALLED - OK 5) NO STORM WATER CONCERNS AT THIS TIME TOOK PICS OF ALL ABOVE
05/28/2015 ENGR Grading Final MRUSSO1 Continued Entered by DROBERT5 - 1) #4 BARS AT 6" OC EACH DIRECTION PER F1 ON SHEET C540 FOR CATCH BASIN ON SE CORNER AND INLET ALONG EAST SIDE 2) STORM WATER MANHOLES INSTALLED PER COT STD DTL 309 AND 302 3) TYPE #4 CATCH BASIN INSTALLED PER COT STD DTL 309 AND 311. 4) NO STORM WATER CONCERNS AT THIS TIME. PERFORM STORM WATER SELF INSPECTIONS AND SWEEP UP TRACKING ROUTINELY 5) CALL FOR INSPECTION FOR RE-BAR LAYOUT OF CATCH BASINS
05/07/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - CONTRACTOR INSTALLED STORM PIPE, SLOPES AND BEDDING OK. CALL FOR INSPECTION FOR RE-BAR LAY OUT OF MANHOLE FLOORS AND/OR PRIOR TO COVER OF MANHOLE CONNECTIONS
05/04/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) CONTRACTOR INSTALLING 24" SRP AT 3% SLOPE ALONG THE SOUTH SIDE OF SITE 2) STORM PIPE WILL CONSIST OF 24" TRANSITION INTO 18" WITH TWO MANHOLES AND A CATCH BASIN 3) STORM PIPE INSTALLED PER APPROVED PLAN - OK TO COVER
10/20/2015 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -