Permit: DP13-0225
Permit Details
Status:
Complete
Type:
Development Package
Address:
5200 N GRACIOUS CT
Address NEW:
5200 N GRACIOUS CT
Apply Date:
11/13/2013
Applicant:
Description:
GRADING
Permit Reviews
Permit Number - DP13-0225
Permit Status: Complete
Permit Description: GRADING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/13/2013 | GRADING | 12/05/2013 | COMPLETED |
Conditions
Permit Number - DP13-0225
Permit Status: Complete
Permit Description: GRADING
| Date | Description | Comments |
|---|---|---|
| 12/02/2013 | The following 13 conditions apply to this grading permit DP13-0225:1)Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Planning & Development Services Department, or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2)Copy of approved plan/permit DP13-0225 shall be kept at site at all times until final grading approval.3)These sets of plans act as the approved final grading plans for Gracious Estates private lot 16 custom grading per approved plans sealed by Peter Livingston, P.E. 4)There shall be no disturbance outside of the disturbance/grading limits as shown on approved grading plans. Disturbance outside these limits may result in Stop Work Order, fines, and / or require revised plan submittal & review. 5)PDSD Inspector should inspect special grading such as interceptor swales when under construction. 6)Contact Permits and Codes (837-6606) for any questions regarding City of Tucson right-of-way permit requirements. 7)If grading construction is expected to last longer than the expiration date of the grading permit, contact PDSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.8)Revisions to the design must be discussed with a Civil Engineer at the City of Tucson Planning & Development Services Department Engineering Division, prior to any construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed, or, whether changes may be provided on as-builts. All work completed without approval is subject to Stop Work Order. 9)Permittee shall notify the PDSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all permanent erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed. Any revegetated areas shall require Landscaping approval of established vegetation prior to Final Grading Approval. Any other exposed areas that are not reseeded shall be covered in gravel or handplaced rip rap, unless other material is proposed and reviewed by City of Tucson.10)Temporary erosion and sediment control devices may be placed at locations where stormwater runoff exits grading limits to prevent debris, construction silt, and/or chemicals from entering public streets or any drainage ways. Any interim erosion and sediment controls that are installed should be maintained, per approved grading plans or per EOR, at downstream areas of disturbance limits.11)Any existing trees or transplanted trees from onsite within SVT's shall be checked and trimmed to assure they are clear of leaves and branches to a height of at least 6 ft above grade. Location of trees within existing and future SVT's may be restricted or modified as determined by City of Tucson Inspectors in order to preserve visibility. 12)Project Engineering completion letters, as well as As-Builts may be required to be submitted prior to final Grading Inspection. Letters of certification from Engineer of Record for project substantial completion may be required and submitted prior to final grading inspection. As-builts should include as-built elevations along drainage systems, finished pad grades, and other areas as deemed needed by surveyor. 13)All rip rap for this site shall be handplaced per HDZ requirements. |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0225
Permit Description: GRADING
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2013 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/17/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PRE-CON MEETING APPROVED 2) ENSURE ANY PROTECTED PLANTS ARE TEMPORARILY MOVED 3) CALL FOR RE-INSPECTION AFTER SILT SOCK IS INSTALLED} |
|
| 01/07/2014 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 01/07/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) TEMPORARY SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE PERIMETER. NO STORM WATER CONCERNS AT THIS TIME. 2) PROVIDE CLARIFICATION ON DRAINAGE SWALE TO BE CONSTRUCTED ALONG THE SOUTH SLOPE OF BOTH LOTS #15 AND 16. PROVIDE A DETAIL SHOWING DIMENSIONS OF THE SWALE. 3) ENSURE CONSTRUCTION DOES NOT GO BEYOND THE GRADING LIMITS PRESCRIBED IN THE PERMIT GRADING CONDITIONS. } |
|
| 04/29/2014 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 04/29/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/29/2014 | ENGR Engineering Final | Passed | {Activity date: 04/29/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/29/2014 | SITE - Stormwater Follow-up | Passed | {Activity date: 04/29/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/06/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} | |
| 04/29/2014 | SITE - Stormwater Final Inspection | Passed | {Activity date: 04/29/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 06/28/2019 | ENGR Grading Final | Passed | {Activity date: 06/28/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |