Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
10/22/2013
Applicant:
Description:
GRADING ONLY

Permit Reviews

Permit Number - DP13-0211
Permit Status: Complete
Permit Description: GRADING ONLY
Start Date Submittal Complete Date Status  
06/23/2014 GRADING 07/15/2014 COMPLETED Review Details
10/22/2013 GRADING 10/24/2013 COMPLETED Review Details
10/24/2013 GRADING 06/23/2014 COMPLETED Review Details

Conditions

Permit Number - DP13-0211
Permit Status: Complete
Permit Description: GRADING ONLY
Date Description Comments
12/02/2013 The following 11 conditions apply to this grading permit DP13-0211:1)Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Planning & Development Services Department - Angie 837-4917, or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2)Copy of approved plan/permit DP13-0211 shall be kept at site at all times until final grading approval.3)These sets of plans act as the approved final grading plans for Rancho Cancion West Lot 122 custom grading per approved plans sealed by Peter Livingston, P.E. 4)There shall be no disturbance outside of the disturbance/grading limits as shown on approved grading plans. Disturbance outside these limits may result in Stop Work Order, fines, and / or require revised plan submittal & review. 5)PDSD Inspector should inspect special grading such as temporary fencing when under construction. 6)Contact Permits and Codes (837-6606) for any questions regarding City of Tucson right-of-way permit requirements. 7)If grading construction is expected to last longer than the expiration date of the grading permit, contact PDSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.8)Revisions to the design must be discussed with a Civil Engineer at the City of Tucson Planning & Development Services Department Engineering Division, prior to any construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed, or, whether changes may be provided on as-builts. All work completed without approval is subject to Stop Work Order. 9)Permittee shall notify the PDSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all permanent erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed. Any revegetated areas shall require Landscaping approval of established vegetation prior to Final Grading Approval. Any other exposed areas that are not reseeded shall be covered in gravel or rip rap, unless other material is proposed, reviewed, and accepted by City of Tucson.10)Temporary erosion and sediment control devices may be placed at locations where stormwater runoff exits grading limits to prevent debris, construction silt, and/or chemicals from entering public streets or any drainage ways. Any interim erosion and sediment controls that are installed should be maintained, per approved grading plans or per EOR, at downstream areas of disturbance limits.11)Project Engineering completion letters, as well as As-Builts may be required to be submitted prior to final Grading Inspection. Letters of certification from Engineer of Record for project substantial completion may be required and submitted prior to final grading inspection. As-builts should include as-built elevations for finished pad grades, front of driveway at street elevation, and other areas as deemed needed by surveyor.

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0211
Permit Description: GRADING ONLY
Total Completed Inspections - 7
Date Description Inspector Results Comments
10/31/2014 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/31/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THEREFORE A STORM WATER PERMIT IS NOT REQUIRED
2) RECOMMEND SEDIMENT CONTROLS BE INSTALLED PER THE APPROVED PLAN.
3) NO NPPO REQUIRED
4) PROVIDE REVISED DRAWING W/ CORRECT ELEVATION.
5) WILL RE-INSPECT WHEN STORM WATER CONTROLS ARE INSTALLED.}
11/06/2014 SITE - Stormwater Setup and Controls Passed {Activity date: 11/06/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEDIMENT CONTROLS HAVE BEEN INSTALLED PER THE APPROVED PLANS AND PER THE INSPECTION COMMENTS}
05/04/2015 SITE - Stormwater Follow-up Passed {Activity date: 05/04/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/17/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by CSHARRA1 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 03/02/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/20/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/21/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATYER CONCERNS AT THIS TIME} ; {Activity date: 12/10/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/19/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) GRADING LIMIT MARKED
2) PERIMETER SEDIMENT CONTROLS HAVE BEEN INSTALLED
3) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION
4) INSTALL A CONCRETE MATERIALS WASH OUT WHEN NEEDED.
5) SWEEP UP TRACKING OFF ADJACENT ROADWAY} ; {Activity date: 11/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNCERS AT THIS TIME} ; {Activity date: 11/06/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME}
08/14/2015 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/14/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/26/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PRIOR TO FINAL APPROVAL ENSURE ALL SITE/GRADING IS COMPLETED
2) ENSURE ALL LANDSCAPING IS DONE PER THE APPROVED PLANS.
3) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD
4) SUBMIT A NOTICE OF TERMINATION TO ADEQ}
08/14/2015 ENGR Engineering Final Passed {Activity date: 08/14/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/08/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MAJORITY OF HOUSE IS COMPLETE. SITE WORK AND LANDSCAPING NEED TO BE COMPLETED PER PLAN, CALL FOR FINAL GRADING INSPECTION} ; {Activity date: 05/04/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CALL IN FOR FINAL GRADING WHEN ALL SITE/GRADING HAS BEEN COMPLETED}
08/14/2015 ENGR Grading Final Passed {Activity date: 08/14/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
08/14/2015 SITE - Stormwater Final Inspection Passed {Activity date: 08/14/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/04/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES, FILE (NOT) WHEN SITE HAS BEEN STABILIZED}

Documents

File Name Document Type  
001_SHEET 1 OF 2.TIF GRADING PLANS VIEW
002_SHEET 2 OF 2.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW