Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
10/11/2013
Applicant:
Peter Salonga
Description:
SITE/GRADING - NEW CHURCH

Permit Reviews

Permit Number - DP13-0200
Permit Status: Complete
Permit Description: SITE/GRADING - NEW CHURCH
Start Date Submittal Complete Date Status  
02/17/2016 REVISION - SITE 02/17/2016 COMPLETED Review Details
02/17/2016 REVISION - SITE 03/24/2016 COMPLETED Review Details
03/24/2016 REVISION - SITE 04/20/2016 COMPLETED Review Details
06/15/2016 REVISION - SITE 06/15/2016 COMPLETED Review Details
08/01/2016 REVISION - - 1ST 08/26/2016 COMPLETED Review Details
08/26/2014 RESUB - SITE and/or GRADING 09/26/2014 COMPLETED Review Details
08/26/2016 REVISION - SITE 08/29/2016 COMPLETED Review Details
10/11/2013 DEV PKG - OK TO SUBMIT 10/11/2013 COMPLETED Review Details
10/15/2013 SITE and/or GRADING 11/25/2013 COMPLETED Review Details
10/16/2014 SITE and/or GRADING 11/03/2014 COMPLETED Review Details
12/23/2015 REVISION - SITE 12/23/2015 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0200
Permit Description: SITE/GRADING - NEW CHURCH
Total Completed Inspections - 8
Date Description Inspector Results Comments
02/02/2016 SITE - Stormwater Follow-up Passed {Activity date: 02/02/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
02/02/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 02/02/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
09/12/2016 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/12/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/12/2016 ENGR Engineering Final Passed {Activity date: 09/12/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/01/2016; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE CONTRACTOR AND LOOKED OVER THE WORK THAT THEY HAVE BEEN DOING ON THE SITE RECENTLY. THEY HAVE ADVISED ME THAT THEY ARE PLANNING ON INSTALLING THE WIER OUTLET FOR THE BASIN. I HAVE ADVISED THEM THAT THE WIER WALL THAT ARE PREPARING TO COMPLETE IS TOO LONG AND STICKS OUT INTO THE RIGHT-OF-WAY AND THAT THEY WOULD NEED A PERMIT FROM THE TRANSPORTATION DEPARTMENT. I HAVE ASKED THAT THEY CONTACT THE TRANSPORTATION FOR THIS AREA AND HAVE HIM LOOK OVER WHAT THEY WANT TO DO BEFORE THEY GO ANY FURTHER. HE WILL CHECK INTO THIS THIS NEXT WEEK AND WILL RESCHEDULE THE SITE INSPECTION ACCORDINGLY.} ; {Activity date: 08/24/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ON SITE CHECKING ON SLOPES FOR SIDEWALKS FORMS ONLY. ONE SPOT OVER 2% CROSS SLOPE AND ONE SPOT OVER 5% RUNNING SLOPES.} ; {Activity date: 08/08/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC AND WALKED SITE.} ; {Activity date: 08/05/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SITE WITH DAVE .} ; {Activity date: 07/22/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CHANGES FROM LAST INSPECTION.} ; {Activity date: 05/24/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - CROSS SLOPE ON NEW SIDE WALKS WEST SIDE OF BUILDING OVER 2%.} ; {Activity date: 05/24/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - } ; {Activity date: 05/11/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON ADA RAMP.} ; {Activity date: 02/10/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSTALLING ROCK IN BASIN ON NORTH SIDE OF SITE.} ; {Activity date: 02/02/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - DAVE ROBERTS AND I WALKED SITE WITH GC REPS . ARCHITET AND CHURCH REPS . WENT OVER THE WORK THAT NEEEDS TO BE DONE FOR FINAL.}
09/12/2016 ENGR Grading Final Passed {Activity date: 09/12/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/01/2016; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE CONTRACTOR AND LOOKED OVER THE WORK THAT THEY HAVE BEEN DOING ON THE SITE RECENTLY. THEY HAVE ADVISED ME THAT THEY ARE PLANNING ON INSTALLING THE WIER OUTLET FOR THE BASIN. I HAVE ADVISED THEM THAT THE WIER WALL THAT ARE PREPARING TO COMPLETE IS TOO LONG AND STICKS OUT INTO THE RIGHT-OF-WAY AND THAT THEY WOULD NEED A PERMIT FROM THE TRANSPORTATION DEPARTMENT. I HAVE ASKED THAT THEY CONTACT THE TRANSPORTATION FOR THIS AREA AND HAVE HIM LOOK OVER WHAT THEY WANT TO DO BEFORE THEY GO ANY FURTHER. HE WILL CHECK INTO THIS THIS NEXT WEEK AND WILL RESCHEDULE THE SITE INSPECTION ACCORDINGLY.}
09/12/2016 SITE - Stormwater Final Inspection Passed {Activity date: 09/12/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
09/12/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/01/2016; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE NOT READY AT THIS TIME} ; {Activity date: 09/12/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/05/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CHANGES FROM LAST INSPECTION.} ; {Activity date: 02/02/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/04/2015; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GLENN WITH G&J WENT OVER PLANS HE'S GOING TO GET BACK TO ME WITH CHANGES TO AP PLANS.}
07/01/2017 RSBU - Building Final Passed {Activity date: 07/01/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
None CONSTRPLANS VIEW
001_SITE_C1 OF 7.TIF DEVELOPMENT PACKAGE VIEW
002_GRADING / SECTION / DETAILS_C2 OF 7.TIF DEVELOPMENT PACKAGE VIEW
003_LANDSCAPE_L-1.TIF DEVELOPMENT PACKAGE VIEW
004_LANDSCAPE_L-2.TIF DEVELOPMENT PACKAGE VIEW
005_IRRIGATION_L-3.TIF DEVELOPMENT PACKAGE VIEW
006_IRRIGATION_L-4.TIF DEVELOPMENT PACKAGE VIEW
007_LANDSCAPE CONST DETAILS_L-5.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW