Permit: DP13-0200
Permit Details
Apply Date:
10/11/2013
Applicant:
Peter Salonga
Description:
SITE/GRADING - NEW CHURCH
Permit Reviews
Permit Number - DP13-0200
Permit Status: Complete
Permit Description: SITE/GRADING - NEW CHURCH
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/17/2016 | REVISION - SITE | 02/17/2016 | COMPLETED |
02/17/2016 | REVISION - SITE | 03/24/2016 | COMPLETED |
03/24/2016 | REVISION - SITE | 04/20/2016 | COMPLETED |
06/15/2016 | REVISION - SITE | 06/15/2016 | COMPLETED |
08/01/2016 | REVISION - - 1ST | 08/26/2016 | COMPLETED |
08/26/2014 | RESUB - SITE and/or GRADING | 09/26/2014 | COMPLETED |
08/26/2016 | REVISION - SITE | 08/29/2016 | COMPLETED |
10/11/2013 | DEV PKG - OK TO SUBMIT | 10/11/2013 | COMPLETED |
10/15/2013 | SITE and/or GRADING | 11/25/2013 | COMPLETED |
10/16/2014 | SITE and/or GRADING | 11/03/2014 | COMPLETED |
12/23/2015 | REVISION - SITE | 12/23/2015 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0200
Permit Description: SITE/GRADING - NEW CHURCH
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/02/2016 | SITE - Stormwater Follow-up | Passed | {Activity date: 02/02/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
02/02/2016 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 02/02/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
09/12/2016 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 09/12/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
09/12/2016 | ENGR Engineering Final | Passed | {Activity date: 09/12/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/01/2016; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE CONTRACTOR AND LOOKED OVER THE WORK THAT THEY HAVE BEEN DOING ON THE SITE RECENTLY. THEY HAVE ADVISED ME THAT THEY ARE PLANNING ON INSTALLING THE WIER OUTLET FOR THE BASIN. I HAVE ADVISED THEM THAT THE WIER WALL THAT ARE PREPARING TO COMPLETE IS TOO LONG AND STICKS OUT INTO THE RIGHT-OF-WAY AND THAT THEY WOULD NEED A PERMIT FROM THE TRANSPORTATION DEPARTMENT. I HAVE ASKED THAT THEY CONTACT THE TRANSPORTATION FOR THIS AREA AND HAVE HIM LOOK OVER WHAT THEY WANT TO DO BEFORE THEY GO ANY FURTHER. HE WILL CHECK INTO THIS THIS NEXT WEEK AND WILL RESCHEDULE THE SITE INSPECTION ACCORDINGLY.} ; {Activity date: 08/24/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ON SITE CHECKING ON SLOPES FOR SIDEWALKS FORMS ONLY. ONE SPOT OVER 2% CROSS SLOPE AND ONE SPOT OVER 5% RUNNING SLOPES.} ; {Activity date: 08/08/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC AND WALKED SITE.} ; {Activity date: 08/05/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SITE WITH DAVE .} ; {Activity date: 07/22/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CHANGES FROM LAST INSPECTION.} ; {Activity date: 05/24/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - CROSS SLOPE ON NEW SIDE WALKS WEST SIDE OF BUILDING OVER 2%.} ; {Activity date: 05/24/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - } ; {Activity date: 05/11/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON ADA RAMP.} ; {Activity date: 02/10/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSTALLING ROCK IN BASIN ON NORTH SIDE OF SITE.} ; {Activity date: 02/02/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - DAVE ROBERTS AND I WALKED SITE WITH GC REPS . ARCHITET AND CHURCH REPS . WENT OVER THE WORK THAT NEEEDS TO BE DONE FOR FINAL.} | |
09/12/2016 | ENGR Grading Final | Passed | {Activity date: 09/12/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/01/2016; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE CONTRACTOR AND LOOKED OVER THE WORK THAT THEY HAVE BEEN DOING ON THE SITE RECENTLY. THEY HAVE ADVISED ME THAT THEY ARE PLANNING ON INSTALLING THE WIER OUTLET FOR THE BASIN. I HAVE ADVISED THEM THAT THE WIER WALL THAT ARE PREPARING TO COMPLETE IS TOO LONG AND STICKS OUT INTO THE RIGHT-OF-WAY AND THAT THEY WOULD NEED A PERMIT FROM THE TRANSPORTATION DEPARTMENT. I HAVE ASKED THAT THEY CONTACT THE TRANSPORTATION FOR THIS AREA AND HAVE HIM LOOK OVER WHAT THEY WANT TO DO BEFORE THEY GO ANY FURTHER. HE WILL CHECK INTO THIS THIS NEXT WEEK AND WILL RESCHEDULE THE SITE INSPECTION ACCORDINGLY.} | |
09/12/2016 | SITE - Stormwater Final Inspection | Passed | {Activity date: 09/12/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
09/12/2016 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/01/2016; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE NOT READY AT THIS TIME} ; {Activity date: 09/12/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/05/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CHANGES FROM LAST INSPECTION.} ; {Activity date: 02/02/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/04/2015; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GLENN WITH G&J WENT OVER PLANS HE'S GOING TO GET BACK TO ME WITH CHANGES TO AP PLANS.} | |
07/01/2017 | RSBU - Building Final | Passed | {Activity date: 07/01/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |