Permit Details

Status:
Complete
Type:
Development Package
Address:
5901 S PARK AV
Address NEW:
5901 S PARK AV
Apply Date:
09/19/2013
Applicant:
Description:
SITE AND GRADING FOR NEW APARTMENT COMPLEX

Permit Reviews

Permit Number - DP13-0191
Permit Status: Complete
Permit Description: SITE AND GRADING FOR NEW APARTMENT COMPLEX
Start Date Submittal Complete Date Status  
09/19/2013 DEV PKG - OK TO SUBMIT 10/04/2013 COMPLETED Review Details
10/04/2013 SITE and/or GRADING 11/05/2013 COMPLETED Review Details
11/13/2013 RESUB - SITE/GRADING ALL 11/14/2013 COMPLETED Review Details
11/14/2013 RESUB - SITE/GRADING ALL 12/12/2013 COMPLETED Review Details
12/12/2013 RESUB - SITE/GRADING ALL 12/13/2013 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP13-0191
Permit Status: Complete
Permit Description: SITE AND GRADING FOR NEW APARTMENT COMPLEX
Total Outstanding Activity Conditions - 4
Date Name
12/13/2013 The following 13 conditions apply to this grading permit DP13-0191:1)Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Planning & Development Services Department, or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2)Copy of approved plan/permit DP13-0191 shall be kept at site at all times until final grading approval.3)These sets of plans act as the approved final grading plans for Alvord Apartments grading per approved plans sealed by Bill Schlesinger, P.E. 4)Any existing trees or transplanted trees from onsite within SVT's shall be checked and trimmed to assure they are clear of leaves and branches to a height of at least 6 ft above grade. Location of trees within existing and future SVT's may be restricted or modified as determined by City of Tucson Inspectors in order to preserve visibility.
12/13/2013 5)Geotechnical requirements for irrigation lines near building foundations are per discussion with Pattison-Evanoff office 12DEC13. There shall be 2-3 feet minimum setback for irrigation lines from building foundation, low-water desert vegetation used, and positive surface gradient from building.6)Contact Permits and Codes (837-6606) for any questions regarding City of Tucson right-of-way permit requirements. 7)There shall be no disturbance outside of the disturbance/grading limits as shown on approved grading plans. 8)If grading construction is expected to last longer than the expiration date of the grading permit, contact PDSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.
12/13/2013 9)Basin and water harvesting areas shall be fenced off so that no construction vehicular parking, no material storage, and no staging occurs in these areas, to minimize compaction or consolidation that could lessen infiltration potential. 10)PDSD Inspector should inspect special grading such as bleed pipes when under construction. 11)Revisions to the design must be discussed with a Civil Engineer at the City of Tucson Planning & Development Services Department Engineering Division, prior to any construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed, or, whether changes may be provided on as-builts. All work completed without approval is subject to Stop Work Order. 12)Permittee shall notify the PDSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all permanent erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed. Any revegetated areas shall require Landscaping approval of established vegetation prior to Final Grading Approval. Any other exposed areas that are not reseeded shall be covered in gravel or rip rap, unless other material is proposed and reviewed by City of Tucson.
12/13/2013 13)Project Engineering completion letters, as well as As-Builts may be required to be submitted prior to final Grading Inspection. Letters of certification from Engineer of Record, for substantial completion of drainage facilities and project substantial completion, are required to be submitted prior to final grading inspection. As-builts should include as-built elevations along drainage systems, finished pad grades, basin elevations, and other areas as deemed needed by surveyor.

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0191
Permit Description: SITE AND GRADING FOR NEW APARTMENT COMPLEX
Total Completed Inspections - 7
Date Description Inspector Results Comments
01/24/2014 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/24/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 01/23/2014; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSTALL SWPP CONTROLS PER AP PLANS.}
01/28/2014 SITE - Stormwater Setup and Controls Passed {Activity date: 01/28/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 01/24/2014; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET SWPPP INFO SIGN.}
07/02/2015 SITE - Stormwater Follow-up Passed {Activity date: 07/02/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/21/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/14/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.}
07/02/2015 SITE - Stormwater Final Inspection Passed {Activity date: 07/02/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
11/25/2015 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 11/25/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/30/2015; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - 2- 15 GAL DESERT MUSEVM PALO VERDE NEED TO BE REPLAC PER AP PLANS. INSTALL TREE STAKING PER DETAIL D ON PAGE L-7 INSTALL VACUUM BREAKERS ON ALL HOSE BIBBS.} ; {Activity date: 09/08/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PLANT TREES PER DETAIL ON AP PLANS.} ; {Activity date: 07/02/2015; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET GEN NOTES#3 . FOR AREA WEST OF BUILDING. LIST MAY NOT BE COMPLET.}
11/25/2015 ENGR Grading Final Passed {Activity date: 11/25/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/30/2015; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
12/01/2015 ENGR Engineering Final Passed {Activity date: 12/01/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 11/25/2015; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE NONPOTABLE WATER AT HOSE BIBBS.} ; {Activity date: 11/23/2015; Status: Continued; Inspector: eleibol1; Comment: Entered by ELEIBOL1 - Certification letters accepted, final inspection approval pending identification of non-potable water on hose bibs.} ; {Activity date: 10/08/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - DROPED OFF INFO TO GC TO COMPLET FOR FINAL.} ; {Activity date: 10/02/2015; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - REMOVE ALL CONSTRUCTION EQUIPMENT.FROM PARKING AREA. COMPLET ALL NOTES FROM PAST INSPECTIONS PROVIDE ENGINEER CERT AND AP AS BUILTS FROM ENGINEER OF RECORD.} ; {Activity date: 08/25/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME.} ; {Activity date: 07/02/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE AS-BUILTS AND CERT LETTER FROM ENGINEER OF RECORD.}

Documents

File Name Document Type  
001_G000.TIF DOCUMENTS VIEW
002_SHEET 1 OF 1.TIF DOCUMENTS VIEW
003_C100.TIF DOCUMENTS VIEW
004_C101.TIF DOCUMENTS VIEW
005_C102.TIF DOCUMENTS VIEW
006_C200.TIF DOCUMENTS VIEW
007_C201.TIF DOCUMENTS VIEW
008_NP1.TIF DOCUMENTS VIEW
009_NP2.TIF DOCUMENTS VIEW
010_L1.TIF DOCUMENTS VIEW
011_L2.TIF DOCUMENTS VIEW
012_L3.TIF DOCUMENTS VIEW
013_L4.TIF DOCUMENTS VIEW
014_L5.TIF DOCUMENTS VIEW
015_L6.TIF DOCUMENTS VIEW
016_L7.TIF DOCUMENTS VIEW
017_L8.TIF DOCUMENTS VIEW
018_A000.TIF DOCUMENTS VIEW
PERMIT DOCUMENTS DOCUMENTS VIEW