Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP13-0173
Permit Details
Apply Date:
09/05/2013
Applicant:
Description:
GRADING
Permit Reviews
Permit Number - DP13-0173
Permit Status: Complete
Permit Description: GRADING
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/16/2014 | REVISION - GRADING | 05/22/2014 | COMPLETED |
09/05/2013 | GRADING | 09/05/2013 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP13-0173
Permit Status: Complete
Permit Description: GRADING
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
09/05/2013 | Any revision to site not shown on approved Development Plan D09-0003 (permit plans DP13-0173), may require a revised Development Plan. |
09/05/2013 | ADOT ROW Use permits may be required. |
09/05/2013 | Construction activity, material storage, or construction vehicular parking shall only be located on parcel 105-08-014E. |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0173
Permit Description: GRADING
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/09/2014 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 01/09/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MET WITH SUPERINTENDENT 2) SCOPE OF WORK HAS CHANGED, ENTIRE SITE HAS BEEN DEMOLISHED AND WILL BE PAVED. 3) AN APPROVED REVISION SHOWING CHANGES MUST BE AVAILABLE FOR INSPECTION 4) CONTRACTOR HAS A ROW PERMIT FOR WORK IN THE RIGHT OF WAY 5) SITE IS LESS THAN 1 AC NO SWPP REQUIRED 6) KEEP DISTURBED SOIL ON SITE DURING CONSTRUCTION 7) INSTALL SEDIMENT CONTROLS IN FRONT OF STORM DRAIN CULVERT IN ROW} ; {Activity date: 12/27/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONSTRUCTION ACTIVITY ON SITE} ; {Activity date: 12/12/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CONSTRUCTION ACTIVITY AT THIS TIME} ; {Activity date: 11/06/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY} ; {Activity date: 10/31/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION} ; {Activity date: 10/23/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY, NO CONSTRUCTION} |
|
02/07/2014 | SITE - Stormwater Follow-up | Passed | {Activity date: 02/07/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/24/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CONCENS AT THIS TIME ALL CHANGES TO SITE/GRADING MUST BE SHOWN ON AN APPROVED REVISION} ; {Activity date: 01/16/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME TRASH ENCLOSURE IS UNDER CONSTRUCTION MEASURED INSIDE CLEAR WIDTH - OK} ; {Activity date: 01/09/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MET WITH SUPERINTENDENT 2) SCOPE OF WORK HAS CHANGED, ENTIRE SITE HAS BEEN DEMOLISHED AND WILL BE PAVED. 3) AN APPROVED REVISION SHOWING CHANGES MUST BE AVAILABLE FOR INSPECTION 4) CONTRACTOR HAS A ROW PERMIT FOR WORK IN THE RIGHT OF WAY 5) SITE IS LESS THAN 1 AC NO SWPP REQUIRED 6) KEEP DISTURBED SOIL ON SITE DURING CONSTRUCTION 7) INSTALL SEDIMENT CONTROLS IN FRONT OF STORM DRAIN CULVERT IN ROW} |
|
02/11/2014 | SITE - Stormwater Final Inspection | Passed | {Activity date: 02/11/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/07/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MAJORITY OF SITE IS STABILIZED HOWEVER NO FINAL INSPECTION CALLED IN} | |
04/07/2014 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 04/07/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/07/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PROVIDE AN APPROVED PLAN THAT SHOWS WHAT WAS CONSTRUCTED AND CALL IN FOR FINAL INSPECTION} | |
04/07/2014 | ENGR Engineering Final | Passed | {Activity date: 04/07/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/19/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE AN APPROVED PLAN THAT SHOWS WHAT WAS CONSTRUCTED FOR INSPECTION. 2) CALL IN FOR FINAL INSPECTION} ; {Activity date: 02/11/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) AWAITING GRADING FINAL INSPECTION 2) ENSURE SITE/GRADING PLAN SHOWS WHAT WAS CONSTRUCTED ON SITE} ; {Activity date: 02/07/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CALL IN FOR FINAL INSPECTION AND PROVIDE AN APPROVED PLAN FOR THAT INSPECTION} ; {Activity date: 01/24/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE NOT READY FOR FINAL APPROVAL. NO SIGNIFICANT CONCENS AT THIS TIME ALL CHANGES TO SITE/GRADING MUST BE SHOWN ON AN APPROVED REVISION} |
|
10/28/2014 | RSBU - Building Final | Passed | {Activity date: 10/28/2014; Status: Approved; Inspector: kmedina; Comment: Entered by KMEDINA1 - } | |
11/08/2016 | ENGR Grading Final | Passed | {Activity date: 11/08/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
11/08/2016 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 11/08/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |