Permit Details

Status:
Issued
Type:
Development Package
Address NEW:
10495 S MILLICENT TR
Apply Date:
08/29/2013
Applicant:
Description:
TENTATIVE PLAT - Vistas at Rincon Knolls, LOTS 1-349 and C.A. "A"-"E"

Permit Reviews

Permit Number - DP13-0169
Permit Status: Issued
Permit Description: TENTATIVE PLAT - Vistas at Rincon Knolls, LOTS 1-349 and C.A. "A"-"E"
Start Date Submittal Complete Date Status  
01/07/2015 REVISION - TENT PLAT & CORE RESUB 03/24/2015 COMPLETED Review Details
01/14/2019 REVISION - TENT PLAT & CORE RESUB 01/28/2019 COMPLETED Review Details
02/21/2014 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 03/18/2014 COMPLETED Review Details
03/24/2015 REVISION - TENT PLAT & CORE RESUB 05/08/2015 COMPLETED Review Details
04/13/2020 DEV PKG - REVISION 04/27/2020 COMPLETED Review Details
04/15/2014 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 05/02/2014 COMPLETED Review Details
05/02/2014 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 05/21/2014 COMPLETED Review Details
05/08/2015 REVISION - TENT PLAT & CORE RESUB 05/21/2015 COMPLETED Review Details
05/20/2020 DEV PKG - REVISION 06/19/2020 COMPLETED Review Details
05/21/2015 REVISION - TENT PLAT & CORE RESUB 05/29/2015 COMPLETED Review Details
06/18/2018 REVISION - TENT PLAT & CORE RESUB 06/22/2018 COMPLETED Review Details
08/29/2013 TENTATIVE PLAT REVIEW 09/03/2013 COMPLETED Review Details
09/03/2013 TENTATIVE PLAT REVIEW 10/03/2013 COMPLETED Review Details
12/23/2013 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 02/21/2014 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP13-0169
Permite Description: TENTATIVE PLAT - Vistas at Rincon Knolls, LOTS 1-349 and C.A. "A"-"E"
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
03/20/2023 PDSD Site/Engineering Division - NPPO N/A Not Ready DP13-0169 CANNOT BE CONSIDERED FOR COMPLETION AND CLOSURE AT THIS TIME FOR THE FOLLOWING REASON. THIS PERMIT IS A PLAN THAT COVERS THE FULL SITE AND NOT JUST A PORTION OF THE SITE, PHASE 1 OR PHASE 2 SO ALL THE SITE WILL NEED TO BE COMPLETED.
THE PHASES DO HAVE INDIVIDUAL DP PERMITS THAT CAN BE INSPECTED TO CONSIDER FOR CLOSURE AND THEY AS FOLLOWS DP14-0153 LOTS 1 THRU 160, AND DP15-0102 LOTS 161 THRU 349.
DP14-0153 WILL BE SCHEDULED AS SOON AS THE REMAINING ITEM HAS BEEN AS REQUESTED IN THE PAST. A SITE INSPECTION WAS PERFORMED TODAY FOR THE REMOVAL OF ALL STORMWATER WADDLE AND NETTING MATERIAL, THIS STILL HAS NOT BEEN COMPLETED. LENNAR OR THEIR CONTRACTORS REPRESENTATIVE WILL NEED TO WALK THE SITE TO REMOVE ALL MATERIAL. I WILL PERFORM ONE FINAL WALK THROUGH OF THE SITE WHEN IT HAS BEEN RESCHEDULED.
10/27/2022 ENGR Engineering Final N/A Not Ready
03/20/2023 COT - ENGR - Signage Final N/A Not Ready DP13-0169 CANNOT BE CONSIDERED FOR COMPLETION AND CLOSURE AT THIS TIME FOR THE FOLLOWING REASON. THIS PERMIT IS A PLAN THAT COVERS THE FULL SITE AND NOT JUST A PORTION OF THE SITE, PHASE 1 OR PHASE 2 SO ALL THE SITE WILL NEED TO BE COMPLETED.
THE PHASES DO HAVE INDIVIDUAL DP PERMITS THAT CAN BE INSPECTED TO CONSIDER FOR CLOSURE AND THEY AS FOLLOWS DP14-0153 LOTS 1 THRU 160, AND DP15-0102 LOTS 161 THRU 349.
DP14-0153 WILL BE SCHEDULED AS SOON AS THE REMAINING ITEM HAS BEEN AS REQUESTED IN THE PAST. A SITE INSPECTION WAS PERFORMED TODAY FOR THE REMOVAL OF ALL STORMWATER WADDLE AND NETTING MATERIAL, THIS STILL HAS NOT BEEN COMPLETED. LENNAR OR THEIR CONTRACTORS REPRESENTATIVE WILL NEED TO WALK THE SITE TO REMOVE ALL MATERIAL. I WILL PERFORM ONE FINAL WALK THROUGH OF THE SITE WHEN IT HAS BEEN RESCHEDULED.
11/21/2023 ENGR Grading Final N/A Not Ready This DP cannot be closed at this time, once we either have a completed package (site developed) we can then close this out. Phase 1 and 2 will need to be completed.
11/21/2023 PDSD Engineering Division Pre-Construction SITE N/A Not Ready This DP cannot be closed at this time, once we either have a completed package (site developed) we can then close this out. Phase 1 and 2 will need to be completed.
PDSD Site/Engineering Division - Landscaping N/A Requested

Documents

File Name Document Type  
1-73 OF 71.PDF DEVELOPMENT PACKAGE VIEW
DESIGN PROFESSIONAL APPROVAL LETTER, 06.17.20.PDF DOCUMENTS VIEW
LENNARAVPRINCONKNOLLS NARRATIVE 5-2020.PDF DOCUMENTS VIEW
RINCON KNOLLS AERIAL PICTURE.PDF DOCUMENTS VIEW
THEVISTASRINCONKNOLLSLOTRELSCHEDMAPEXAMPLE.PDF DOCUMENTS VIEW
LENNAR AVP RINCON KNOLLS NARRATIVEAMENDED 4-16-20.PDF DOCUMENTS VIEW
RINCON KNOLLS - 3507, 04.13.2020.PDF DOCUMENTS VIEW
RINCON KNOLLS - 3506, 04.13.2020.PDF DOCUMENTS VIEW
TUCSON WATER.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
PAG DATA DOCUMENTS VIEW
SWG LETTER.PDF DOCUMENTS VIEW
SWG TUCSON DISTRICT CONTACT INFO-MAP-STANDBY.PDF DOCUMENTS VIEW
DP13-0169 PARKS AND RECS..PDF DOCUMENTS VIEW
DP13-0169 PAG.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
JONES AZGFD MITIGATION PLAN APPROVAL EMAIL 180319.PDF DOCUMENTS VIEW
RINCONKNOLLSDESERTTORTOISEMITIGATIONAND MONITORINGPLAN_180313_OPT.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
ARCHITECTURAL VARIATION PLAN.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW