Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Signage Final
Permit Number - DP13-0169
Inspection Description - COT - ENGR - Signage Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - ENGR - Signage Final | Not Ready | ||
| 03/20/2023 | COT - ENGR - Signage Final | Not Ready | DP13-0169 CANNOT BE CONSIDERED FOR COMPLETION AND CLOSURE AT THIS TIME FOR THE FOLLOWING REASON. THIS PERMIT IS A PLAN THAT COVERS THE FULL SITE AND NOT JUST A PORTION OF THE SITE, PHASE 1 OR PHASE 2 SO ALL THE SITE WILL NEED TO BE COMPLETED. THE PHASES DO HAVE INDIVIDUAL DP PERMITS THAT CAN BE INSPECTED TO CONSIDER FOR CLOSURE AND THEY AS FOLLOWS DP14-0153 LOTS 1 THRU 160, AND DP15-0102 LOTS 161 THRU 349. DP14-0153 WILL BE SCHEDULED AS SOON AS THE REMAINING ITEM HAS BEEN AS REQUESTED IN THE PAST. A SITE INSPECTION WAS PERFORMED TODAY FOR THE REMOVAL OF ALL STORMWATER WADDLE AND NETTING MATERIAL, THIS STILL HAS NOT BEEN COMPLETED. LENNAR OR THEIR CONTRACTORS REPRESENTATIVE WILL NEED TO WALK THE SITE TO REMOVE ALL MATERIAL. I WILL PERFORM ONE FINAL WALK THROUGH OF THE SITE WHEN IT HAS BEEN RESCHEDULED. |