Permit: DP13-0161
Permit Details
Apply Date:
08/22/2013
Applicant:
N/A
Description:
SITE/GRADING/SWPPP Originally approved 11/13/13 Revision 1 approved 1/14/2013 (pages 9, 11 and 20) Revision 2 approved 1/22/2013 (pages 9 and 11)
Contractors:
- DAY S EXCAVATING INC ,
Permit Reviews
Permit Number - DP13-0161
Permit Status: Void
Permit Description: SITE/GRADING/SWPPP
Originally approved 11/13/13
Revision 1 approved 1/14/2013 (pages 9, 11 and 20)
Revision 2 approved 1/22/2013 (pages 9 and 11)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/15/2014 | REVISION - SITE | 01/22/2014 | COMPLETED |
01/22/2014 | DEV PKG - REVISION | 01/22/2014 | COMPLETED |
08/22/2013 | DEV PKG - OK TO SUBMIT | 08/22/2013 | COMPLETED |
08/23/2013 | DEV PKG | 09/11/2013 | COMPLETED |
10/02/2013 | DEV PKG - RESUBMITTAL | 11/04/2013 | COMPLETED |
11/04/2013 | DEV PKG - RESUBMITTAL | 11/18/2013 | COMPLETED |
Completed Inspections
Permit Status: Void
Permit Number: DP13-0161
Permit Description: SITE/GRADING/SWPPP
Originally approved 11/13/13
Revision 1 approved 1/14/2013 (pages 9, 11 and 20)
Revision 2 approved 1/22/2013 (pages 9 and 11)
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/21/2013 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER APPROVED SWPPP AND INSPECTION RECOMMENDATIONS 2) ENSURE TRACKED SOIL IS SWEPT OFF OF PUBLIC ROADWAYS ROUTINELY 3) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP 5) POSTA A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE 6) CALL FOR INSPECTION FOR ANY CHANGES AND/OR CONCERNS |
11/26/2013 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | SEDIMENT CONTROLS HAVE BEEN INSTALLED PER APPROVED SWPPP AND INSPECTION RECOMMENDATIONS. |
12/10/2013 | GRADING - INTERMEDIATE | MRUSSO | Approved | 1) SEDIMENT CONTROLS IN PLACE. 2) CONTRACTOR IS WORKING ON THE BLDG PAD ,FOUNDATION AND THE UTILITIES 3) CONTRACTOR INSTALLING THE FOOTINGS FOR THE PERIMETER WALL 4) MINIMAL TRACKING 5) NO OTHER STORM WATER CONCERNS AT THIS TIME |
12/23/2013 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
03/25/2014 | GRADING - FINAL | DROBERTS | Approved | COMPLETE ALL REMAINING WORK AND REMOVE ALL EXCESS MATERIAL FROM THIS SITE. |
03/25/2014 | GRADING - TIER REV | DROBERTS | Approved | |
03/25/2014 | GRADING - CHECK FOR ACTIVITY | DROBERTS | Approved | |
03/25/2014 | GRADING - REBAR | DROBERTS | Approved | |
03/25/2014 | LANDSCAPE INSPECTION | DROBERTS | Approved | |
03/25/2014 | STORMWATER FINAL INSPECTION | DROBERTS | Approved | |
02/25/2020 | DRAINAGE/BASIN CORRESPONDENCE | DROBERTS | Approved | |
02/25/2020 | DRAINAGE/BASIN COMPLAINT INSP | DROBERTS | Approved |