Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2014 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 01/30/2014 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
| 12/23/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 12/10/2013 | STORMWATER FOLLOW-UP INSP | Continued | 1) SEDIMENT CONTROLS IN PLACE. 2) CONTRACTOR IS WORKING ON THE BLDG PAD AND FOUNDATION AND THE UTILITIES 3) CONTRACTOR INSTALLING THE FOOTINGS FOR THE PERIMETER WALL 4) MINIMAL TRACKING 5) NO OTHER STORM WATER CONCERNS AT THIS TIME |