Permit: DP13-0151
Permit Details
Apply Date:
08/09/2013
Applicant:
Scott Neeley
Description:
SITE/GRADING: 18TH AND MAIN AVE
Permit Reviews
Permit Number - DP13-0151
Permit Status: Complete
Permit Description: SITE/GRADING: 18TH AND MAIN AVE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/09/2013 | DEV PKG - OK TO SUBMIT | 08/12/2013 | COMPLETED |
08/12/2013 | SITE and/or GRADING | 09/23/2013 | COMPLETED |
09/27/2013 | RESUB - SITE and/or GRADING | 10/30/2013 | COMPLETED |
11/07/2013 | RESUB - SITE and/or GRADING | 11/25/2013 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP13-0151
Permit Status: Complete
Permit Description: SITE/GRADING: 18TH AND MAIN AVE
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
11/25/2013 | AS BUILTS REQUIRED |
11/25/2013 | The following 11 conditions apply to this grading permit DP13-0151:1)Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Planning & Development Services Department, or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2)A copy of the approved Grading Plan and Permit DP13-0151 shall be kept at the site at all times, until final grading approval.3)These sets of plans act as the approved final grading plans for private grading, and drainage improvements for 685 S Main Av, and provides permission to perform private grading, compaction, and drainage improvement construction as shown on the approved plans. 4)There shall be no disturbance outside of the disturbance/grading limits. Grading construction activities includeds staging and compaction of soils on the other 2 eastern lots (which shall not increase or decrease grades on the east lots). Inspector may request gravel erosion protection of any undisturbed areas. Any activity outside of the project boundary may require a construction or maintenance easement and may be required to be reviewed if not already shown on approved plans.5)Contact Permits and Codes (837-6606) for any questions regarding City of Tucson right-of-way permit requirements. 6)If grading construction is expected to last longer than the expiration date of the grading permit, contact PDSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.7)Revisions to the design must be discussed with a Civil Engineer at the City of Tucson Planning & Development Services Department Engineering Division, prior to any construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed, or, whether changes may be provided on as-builts. All work completed without approval is subject to Stop Work Order. 8)The permitee shall notify the PDSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all permanent erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed. Any revegetated areas shall require Landscaping approval of established vegetation prior to Final Grading Approval. Any other exposed areas that are not reseeded shall be covered in gravel, unless other material is proposed and reviewed by the City of Tucson.9)Temporary erosion and sediment control devices may be needed to be placed at locations where stormwater runoff exits grading limits to prevent debris, construction silt, and/or chemicals from entering public streets or any drainage ways. Any interim erosion and sediment controls should be maintained per approved grading plans at downstream areas of disturbance limits.10)Any existing trees or transplanted trees from onsite within SVT's shall be checked and trimmed to assure they are clear of leaves and branches to a height of at least 6 ft above grade. Location of trees within existing and future SVT's may be restricted or modified as determined by City of Tucson Inspectors in order to preserve visibility. 11)Project Engineering and Geotechnical Engineering completion letters, as well as As-Builts are required to be submitted prior to final Grading Inspection. Letters of certification from Engineer of Record for project substantial completion are required and shall be submitted prior to final grading inspection. Specifically, confirmation of finished pad grade (or FFE) for west lot shall be provided for as-builts. |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0151
Permit Description: SITE/GRADING: 18TH AND MAIN AVE
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/14/2014 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 01/14/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MEET WITH JASON AND JIM FOR PRE-CON MEETING.} ; {Activity date: 01/13/2014; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE CITY AP PLANS ON SITE FOR PRE-CON MEETING.} | |
10/31/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 10/31/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
10/31/2017 | ENGR Engineering Final | Passed | {Activity date: 10/31/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/10/2015; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - COMPLET ALL WORK ON AP GRADING PLANS.} | |
10/31/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 10/31/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
10/31/2017 | ENGR Grading Final | Passed | {Activity date: 10/31/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 01/13/2014; Status: Prior to Final Inspectn; Inspector: ELEIBOL1; Comment: Entered by GBONILL1 - TIER 1 REVISION: Elevating approx 8 -in on eastern lots while compaction for 3 lots is underway. Spoke with Architect Scott Neeley RA 343-8153, 13JAN14. East swale will be provided at east side of east lot, within property limits. Any additional erosion protection in the form of riprap or gravel may be neeeded as determined by EOR and Inspector in the field.} | |
10/31/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 10/31/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/14/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} | |
10/31/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 10/31/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |