Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
695 S MAIN AV
Apply Date:
08/09/2013
Applicant:
Scott Neeley
Description:
SITE/GRADING: 18TH AND MAIN AVE

Permit Reviews

Permit Number - DP13-0151
Permit Status: Complete
Permit Description: SITE/GRADING: 18TH AND MAIN AVE
Start Date Submittal Complete Date Status  
08/09/2013 DEV PKG - OK TO SUBMIT 08/12/2013 COMPLETED Review Details
08/12/2013 SITE and/or GRADING 09/23/2013 COMPLETED Review Details
09/27/2013 RESUB - SITE and/or GRADING 10/30/2013 COMPLETED Review Details
11/07/2013 RESUB - SITE and/or GRADING 11/25/2013 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP13-0151
Permit Status: Complete
Permit Description: SITE/GRADING: 18TH AND MAIN AVE
Total Outstanding Activity Conditions - 2
Date Name
11/25/2013 AS BUILTS REQUIRED
11/25/2013 The following 11 conditions apply to this grading permit DP13-0151:1)Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Planning & Development Services Department, or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2)A copy of the approved Grading Plan and Permit DP13-0151 shall be kept at the site at all times, until final grading approval.3)These sets of plans act as the approved final grading plans for private grading, and drainage improvements for 685 S Main Av, and provides permission to perform private grading, compaction, and drainage improvement construction as shown on the approved plans. 4)There shall be no disturbance outside of the disturbance/grading limits. Grading construction activities includeds staging and compaction of soils on the other 2 eastern lots (which shall not increase or decrease grades on the east lots). Inspector may request gravel erosion protection of any undisturbed areas. Any activity outside of the project boundary may require a construction or maintenance easement and may be required to be reviewed if not already shown on approved plans.5)Contact Permits and Codes (837-6606) for any questions regarding City of Tucson right-of-way permit requirements. 6)If grading construction is expected to last longer than the expiration date of the grading permit, contact PDSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.7)Revisions to the design must be discussed with a Civil Engineer at the City of Tucson Planning & Development Services Department Engineering Division, prior to any construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed, or, whether changes may be provided on as-builts. All work completed without approval is subject to Stop Work Order. 8)The permitee shall notify the PDSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all permanent erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed. Any revegetated areas shall require Landscaping approval of established vegetation prior to Final Grading Approval. Any other exposed areas that are not reseeded shall be covered in gravel, unless other material is proposed and reviewed by the City of Tucson.9)Temporary erosion and sediment control devices may be needed to be placed at locations where stormwater runoff exits grading limits to prevent debris, construction silt, and/or chemicals from entering public streets or any drainage ways. Any interim erosion and sediment controls should be maintained per approved grading plans at downstream areas of disturbance limits.10)Any existing trees or transplanted trees from onsite within SVT's shall be checked and trimmed to assure they are clear of leaves and branches to a height of at least 6 ft above grade. Location of trees within existing and future SVT's may be restricted or modified as determined by City of Tucson Inspectors in order to preserve visibility. 11)Project Engineering and Geotechnical Engineering completion letters, as well as As-Builts are required to be submitted prior to final Grading Inspection. Letters of certification from Engineer of Record for project substantial completion are required and shall be submitted prior to final grading inspection. Specifically, confirmation of finished pad grade (or FFE) for west lot shall be provided for as-builts.

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0151
Permit Description: SITE/GRADING: 18TH AND MAIN AVE
Total Completed Inspections - 7
Date Description Inspector Results Comments
01/14/2014 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/14/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MEET WITH JASON AND JIM FOR PRE-CON MEETING.} ; {Activity date: 01/13/2014; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE CITY AP PLANS ON SITE FOR PRE-CON MEETING.}
10/31/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/31/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
10/31/2017 ENGR Engineering Final Passed {Activity date: 10/31/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/10/2015; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - COMPLET ALL WORK ON AP GRADING PLANS.}
10/31/2017 SITE - Stormwater Follow-up Passed {Activity date: 10/31/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
10/31/2017 ENGR Grading Final Passed {Activity date: 10/31/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 01/13/2014; Status: Prior to Final Inspectn; Inspector: ELEIBOL1; Comment: Entered by GBONILL1 - TIER 1 REVISION: Elevating approx 8 -in on eastern lots while compaction for 3 lots is underway. Spoke with Architect Scott Neeley RA 343-8153, 13JAN14. East swale will be provided at east side of east lot, within property limits. Any additional erosion protection in the form of riprap or gravel may be neeeded as determined by EOR and Inspector in the field.}
10/31/2017 SITE - Stormwater Final Inspection Passed {Activity date: 10/31/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/14/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.}
10/31/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 10/31/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }

Documents

File Name Document Type  
001_1 OF 4.TIF GRADING PLANS VIEW
002_2 OF 4.TIF GRADING PLANS VIEW
003_3 OF 4.TIF GRADING PLANS VIEW
004_4 OF 4.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW