Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
1895 W VALENCIA RD
Apply Date:
06/17/2013
Applicant:
Lisa Bowers
Description:
SITE

Permit Reviews

Permit Number - DP13-0110
Permit Status: Complete
Permit Description: SITE
Start Date Submittal Complete Date Status  
06/17/2013 SITE and/or GRADING 06/19/2013 COMPLETED Review Details
06/19/2013 SITE and/or GRADING 07/19/2013 COMPLETED Review Details
07/19/2013 RESUB - SITE/GRADING ALL 07/22/2013 COMPLETED Review Details
07/22/2013 RESUB - SITE and/or GRADING 08/14/2013 COMPLETED Review Details
08/14/2013 RESUB - SITE and/or GRADING 10/30/2013 COMPLETED Review Details
10/31/2013 REVISION - - 1ST 10/31/2013 COMPLETED Review Details
11/01/2013 REVISION - - 2ND 11/05/2013 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0110
Permit Description: SITE
Total Completed Inspections - 1
Date Description Inspector Results Comments
02/02/2021 ENGR Engineering Final Passed {Activity date: 02/02/2021; Status: Closed; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS BEING CLOSED AT THIS TIME, IT HAS BEEN FINALED IN THE PASSED BY BGRANT BUT WAS NOT INSPECTED AND APPROVED BY THE ENGINEERING SECTION. SEE THE PREVIOUS COMMENTS FROM THE INSPECTION DATED ON 1/29/2020 AND 1/26/2021.} ; {Activity date: 01/26/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VLEON1 - PARTIALLY APPROVED, MINOR CHANGES HAVE BEEN MADE TO THE SITE AND NEEDS TO BE REFLECTED ON REVISED DRAWINGS FOR THIS SITE PRIOR TO A FINAL APPROVAL.MOST OF THE CHANGES ARE MISSING LONG TERM AND SHORT TERM BICYCLE PARKING.} ; {Activity date: 01/29/2020; Status: Denied; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - 1) THE SIDEWALK RAMP AT THE SOUTHWEST CORNER OF THE NEW ADDITION EXCEEDS 5% IN THE RUNNING SLOP. THIS REQUIRES HANDRAILS ON BOTH SIDES OF THE SIDEWALK WHICH HAS NOT BEEN PROVIDED AT THIS TIME.
2) THE SHORT TERM BICYCLE CALLED TO BE INSTALLED AT THE SOUTHEAST CORNER OF THE EXISTING BUILDING HAS NOT BEEN PROVIDED. ALSO IN THIS AREA THE OWNER HAS USED THE SIDEWALK FOR THE STORAGE OF BICYCLES AND OTHER EQUIPMENT NOT ALLOWING THE MINIMAL 36 INCHES OF CLEARANCE.
3) MISSING THE LONG TERM BICYCLE LOCKERS CALLED OUT AT THE NORTHEAST CORNER OF THE EXISTING BUILDING.
4) ON THE NORTHERN SIDEWALK THERE IS AN AREA THAT REQUIRES HANDRAIL DUE TO A 30INCH DROP OFF ALONG THE NORTH SIDE OF THE SIDEWALK.}

Documents

File Name Document Type  
001_TITLE SHEET/PROJECT DATA_TS1.TIF DEVELOPMENT PACKAGE VIEW
002_DEVELOPMENT PLAN NOTES/DETAILS_1 OF 5.TIF DEVELOPMENT PACKAGE VIEW
003_DEVELOPMENT PLAN/NOTES_2 OF 5.TIF DEVELOPMENT PACKAGE VIEW
004_DEVELOPMENT PLAN DETAILS_3 OF 5.TIF DEVELOPMENT PACKAGE VIEW
005_LANDSCAPE_4 OF 5.TIF DEVELOPMENT PACKAGE VIEW
006_IRRIGATION_5 OF 5.TIF DEVELOPMENT PACKAGE VIEW
007_FLOOR_A1.0.TIF DEVELOPMENT PACKAGE VIEW
008_REFLECTED CEILING_A2.0.TIF DEVELOPMENT PACKAGE VIEW
009_SECTION/EXTERIOR ELEVATIONS_A3.0.TIF DEVELOPMENT PACKAGE VIEW
010_ROOF_A4.0.TIF DEVELOPMENT PACKAGE VIEW
011_FOUNDATION PLAN/DETAILS_S1.0.TIF DEVELOPMENT PACKAGE VIEW
012_FRAMING/DETAILS_S2.0.TIF DEVELOPMENT PACKAGE VIEW
013_GENERAL STRUCTURAL NOTES_S3.0.TIF DEVELOPMENT PACKAGE VIEW
014_MECHANICAL_M1.0.TIF DEVELOPMENT PACKAGE VIEW
015_MECHANICAL/PLUMBING SPECS_MP1.0.TIF DEVELOPMENT PACKAGE VIEW
016_PLUMBING_P1.0.TIF DEVELOPMENT PACKAGE VIEW
017_ELECTRICAL SPECS / SYMBOLS_E1.0.TIF DEVELOPMENT PACKAGE VIEW
018_LIGHTING / POWER_E2.0.TIF DEVELOPMENT PACKAGE VIEW
019_ELECTRICAL DETAILS_E3.0.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW