Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/02/2021 |
ENGR Engineering Final
|
DROBERTS |
Closed |
Entered by DROBERT5 - THIS SITE IS BEING CLOSED AT THIS TIME, IT HAS BEEN FINALED IN THE PASSED BY BGRANT BUT WAS NOT INSPECTED AND APPROVED BY THE ENGINEERING SECTION. SEE THE PREVIOUS COMMENTS FROM THE INSPECTION DATED ON 1/29/2020 AND 1/26/2021. |
| 01/26/2021 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by VLEON1 - PARTIALLY APPROVED, MINOR CHANGES HAVE BEEN MADE TO THE SITE AND NEEDS TO BE REFLECTED ON REVISED DRAWINGS FOR THIS SITE PRIOR TO A FINAL APPROVAL.MOST OF THE CHANGES ARE MISSING LONG TERM AND SHORT TERM BICYCLE PARKING. |
| 01/29/2020 |
ENGR Engineering Final
|
DROBERTS |
Denied |
Entered by DMERANZ1 - 1) THE SIDEWALK RAMP AT THE SOUTHWEST CORNER OF THE NEW ADDITION EXCEEDS 5% IN THE RUNNING SLOP. THIS REQUIRES HANDRAILS ON BOTH SIDES OF THE SIDEWALK WHICH HAS NOT BEEN PROVIDED AT THIS TIME.
2) THE SHORT TERM BICYCLE CALLED TO BE INSTALLED AT THE SOUTHEAST CORNER OF THE EXISTING BUILDING HAS NOT BEEN PROVIDED. ALSO IN THIS AREA THE OWNER HAS USED THE SIDEWALK FOR THE STORAGE OF BICYCLES AND OTHER EQUIPMENT NOT ALLOWING THE MINIMAL 36 INCHES OF CLEARANCE.
3) MISSING THE LONG TERM BICYCLE LOCKERS CALLED OUT AT THE NORTHEAST CORNER OF THE EXISTING BUILDING.
4) ON THE NORTHERN SIDEWALK THERE IS AN AREA THAT REQUIRES HANDRAIL DUE TO A 30INCH DROP OFF ALONG THE NORTH SIDE OF THE SIDEWALK. |