Permit: DP13-0077
Permit Details
Apply Date:
05/07/2013
Applicant:
Description:
TENTATIVE PLAT - HACIENDAS AT WRIGHTSTOWN II LOTS 13-24
Permit Reviews
Permit Number - DP13-0077
Permit Status: Complete
Permit Description: TENTATIVE PLAT - HACIENDAS AT WRIGHTSTOWN II LOTS 13-24
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/07/2014 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 02/07/2014 | COMPLETED |
04/11/2016 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 05/17/2016 | COMPLETED |
04/17/2014 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 04/11/2016 | COMPLETED |
05/07/2013 | DEV PKG - OK TO SUBMIT | 05/07/2013 | COMPLETED |
05/07/2013 | TENTATIVE PLAT REVIEW | 10/15/2013 | COMPLETED |
05/23/2016 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 07/18/2016 | COMPLETED |
07/18/2016 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 08/18/2016 | COMPLETED |
08/02/2017 | REVISION - TENT PLAT & CORE RESUB | 08/02/2017 | COMPLETED |
08/18/2016 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 08/02/2017 | COMPLETED |
10/15/2013 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 01/07/2014 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0077
Permit Description: TENTATIVE PLAT - HACIENDAS AT WRIGHTSTOWN II LOTS 13-24
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/16/2020 | SITE - Stormwater Follow-up | Passed | {Activity date: 07/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/11/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 03/26/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS ON THE SITE IN REGARDS TO THE REMOVAL OF MATERIAL FROM THE SITE.} ; {Activity date: 03/15/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/30/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/11/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH CONTRACTOR ON SITE ABOUT TRACK OUT.} ; {Activity date: 12/21/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/13/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. 1) NOI NOT ON SITE AT THIS TIME, HAVE ASKED THE CONTRACTOR TO PROVIDE A COPY OF THE NOI. 2) THE STORMWATER CONTROLS HAVE BEEN INSTALLED ON THIS SITE BUT THEY ARE NOT PER THE APPORVED PLANS. I HAVE ASKED THE CONTRACTOR TO ADD THE ADDITIONAL STAKES THAT ARE NEEDED BEFORE THEY CALL THE NEXT INSPECTION.} |
|
07/16/2020 | ENGR Grading Final | Passed | {Activity date: 07/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/11/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
07/16/2020 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 07/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/11/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 03/23/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - 1) NOI NOT ON SITE AT THIS TIME, HAVE ASKED THE CONTRACTOR TO PROVIDE A COPY OF THE NOI. 2) THE STORMWATER CONTROLS HAVE BEEN INSTALLED ON THIS SITE BUT THEY ARE NOT PER THE APPORVED PLANS. I HAVE ASKED THE CONTRACTOR TO ADD THE ADDITIONAL STAKES THAT ARE NEEDED BEFORE THEY CALL THE NEXT INSPECTION.} ; {Activity date: 12/06/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE NEW NOI .} ; {Activity date: 12/05/2016; Status: Partial Approval; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - COMPLET INSTALL OF CONTROLS AND PROVIDE NEW NOI FOR SITE.} ; {Activity date: 12/01/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |
|
09/29/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 09/29/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 07/11/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
09/29/2020 | SITE - Stormwater Final Inspection | Passed | {Activity date: 09/29/2020; Status: Approved; Inspector: rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/11/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
02/09/2021 | ENGR Engineering Final | Passed | {Activity date: 02/09/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/15/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - PARTIAL AT THIS TIME, FINAL NOT TO BE GIVEN TILL I HAVE VERIFIED SOME WORK WITH THE APPROVED PLANS.} ; {Activity date: 06/04/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS PRIOR TO REQUESTING THIS FINAL INSPECTION AND FULL RELEASE OF THIS SITE.} ; {Activity date: 07/11/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
02/09/2021 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 02/09/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/05/2016; Status: Approved; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - MET WITH BRAYN FOR PRE-CON.} ; {Activity date: 12/01/2016; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - OK TO GRUB JUST IN AREAS TO INSTALL NEW SWPPP CONTROLS ONLY.} |