Permit Details

Status:
Complete
Type:
Development Package
Address:
1509 N OHANA PL
Apply Date:
05/07/2013
Applicant:
Description:
TENTATIVE PLAT - HACIENDAS AT WRIGHTSTOWN II LOTS 13-24

Permit Reviews

Permit Number - DP13-0077
Permit Status: Complete
Permit Description: TENTATIVE PLAT - HACIENDAS AT WRIGHTSTOWN II LOTS 13-24
Start Date Submittal Complete Date Status  
01/07/2014 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 02/07/2014 COMPLETED Review Details
04/11/2016 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 05/17/2016 COMPLETED Review Details
04/17/2014 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 04/11/2016 COMPLETED Review Details
05/07/2013 DEV PKG - OK TO SUBMIT 05/07/2013 COMPLETED Review Details
05/07/2013 TENTATIVE PLAT REVIEW 10/15/2013 COMPLETED Review Details
05/23/2016 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 07/18/2016 COMPLETED Review Details
07/18/2016 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 08/18/2016 COMPLETED Review Details
08/02/2017 REVISION - TENT PLAT & CORE RESUB 08/02/2017 COMPLETED Review Details
08/18/2016 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 08/02/2017 COMPLETED Review Details
10/15/2013 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 01/07/2014 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0077
Permit Description: TENTATIVE PLAT - HACIENDAS AT WRIGHTSTOWN II LOTS 13-24
Total Completed Inspections - 7
Date Description Inspector Results Comments
07/16/2020 SITE - Stormwater Follow-up Passed {Activity date: 07/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/11/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 03/26/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS ON THE SITE IN REGARDS TO THE REMOVAL OF MATERIAL FROM THE SITE.} ; {Activity date: 03/15/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/30/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/11/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH CONTRACTOR ON SITE ABOUT TRACK OUT.} ; {Activity date: 12/21/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/13/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
1) NOI NOT ON SITE AT THIS TIME, HAVE ASKED THE CONTRACTOR TO PROVIDE A COPY OF THE NOI.
2) THE STORMWATER CONTROLS HAVE BEEN INSTALLED ON THIS SITE BUT THEY ARE NOT PER THE APPORVED PLANS. I HAVE ASKED THE CONTRACTOR TO ADD THE ADDITIONAL STAKES THAT ARE NEEDED BEFORE THEY CALL THE NEXT INSPECTION.}
07/16/2020 ENGR Grading Final Passed {Activity date: 07/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/11/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/16/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 07/16/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/11/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 03/23/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - 1) NOI NOT ON SITE AT THIS TIME, HAVE ASKED THE CONTRACTOR TO PROVIDE A COPY OF THE NOI.
2) THE STORMWATER CONTROLS HAVE BEEN INSTALLED ON THIS SITE BUT THEY ARE NOT PER THE APPORVED PLANS. I HAVE ASKED THE CONTRACTOR TO ADD THE ADDITIONAL STAKES THAT ARE NEEDED BEFORE THEY CALL THE NEXT INSPECTION.} ; {Activity date: 12/06/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE NEW NOI .} ; {Activity date: 12/05/2016; Status: Partial Approval; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - COMPLET INSTALL OF CONTROLS AND PROVIDE NEW NOI FOR SITE.} ; {Activity date: 12/01/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
09/29/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/29/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Approved.} ; {Activity date: 07/11/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
09/29/2020 SITE - Stormwater Final Inspection Passed {Activity date: 09/29/2020; Status: Approved; Inspector: rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/11/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
02/09/2021 ENGR Engineering Final Passed {Activity date: 02/09/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 06/15/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - PARTIAL AT THIS TIME, FINAL NOT TO BE GIVEN TILL I HAVE VERIFIED SOME WORK WITH THE APPROVED PLANS.} ; {Activity date: 06/04/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS PRIOR TO REQUESTING THIS FINAL INSPECTION AND FULL RELEASE OF THIS SITE.} ; {Activity date: 07/11/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
02/09/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/09/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/05/2016; Status: Approved; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - MET WITH BRAYN FOR PRE-CON.} ; {Activity date: 12/01/2016; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - OK TO GRUB JUST IN AREAS TO INSTALL NEW SWPPP CONTROLS ONLY.}

Documents

File Name Document Type  
001_TENTATIVE PLAT_CI.TIF DEVELOPMENT PACKAGE VIEW
002_GRADING / DRAINAGE_C2.TIF DEVELOPMENT PACKAGE VIEW
003_CONCEPTUAL PAVING / SEWER_C3.TIF DEVELOPMENT PACKAGE VIEW
004_DETAILS / REZONING CONDITIONS_C4.TIF DEVELOPMENT PACKAGE VIEW
005_SWPPP_C5.TIF DEVELOPMENT PACKAGE VIEW
006_NPPO_N1.TIF DEVELOPMENT PACKAGE VIEW
007_NPPO NOTES_N2.TIF DEVELOPMENT PACKAGE VIEW
008_PLANTING_P1.TIF DEVELOPMENT PACKAGE VIEW
009_ IRRIGATION_I1.TIF DEVELOPMENT PACKAGE VIEW
010_DETAILS_D-1.TIF DEVELOPMENT PACKAGE VIEW
011_DETAILS_D-2.TIF DEVELOPMENT PACKAGE VIEW
012_DETAILS_D-3.TIF DEVELOPMENT PACKAGE VIEW
013_DETAILS_D-4.TIF DEVELOPMENT PACKAGE VIEW
014_DETAILS_D-5.TIF DEVELOPMENT PACKAGE VIEW
015_DETAILS_D-6.TIF DEVELOPMENT PACKAGE VIEW
APPROVAL FROM TUCSON WATER.PDF DOCUMENTS VIEW
SOUTHWEST GAS.PDF DOCUMENTS VIEW
PAG DOCUMENTS.PDF DOCUMENTS VIEW
SWG DP13-0077.PDF DOCUMENTS VIEW
SWG TUCSON DISTRICT CONTACT INFO-MAP-STANDBY.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW