Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP13-0077
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2017 | ENGR Grading Final | REDONNE | Approved | Entered by RLEDONN1 - |
07/11/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - |
03/23/2017 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - THE CREWS ARE WORKING ON THE INSTALLATION OF THE REBAR FOR THE SOUTH WALL FOOTER OF THE RETENTION / DETENTION BASIN, THIS AREA WILL BE POURED LATER ON TODAY. |
07/16/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
07/06/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON HOUSES. |
11/07/2017 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - TALKED TO ZACH AND DISCUSSED WHAT ARE HIS INTENTIONS FOR THIS SITE IN THE FUTURE. HE IS LOOKING TO CLOSE OUT THE SITE FOR THE ASSURANCES AND FOR THE DEVELOPMENT PACKAGE AT THIS TIME. I HAVE ADVISED HIM THAT HE NEEDS TO LOOK AT HAVING THE DEVELOPER TO APPLY FOR A NEW DEVELOPMENT PACKAGE AN A NOTICE OF INTENT BY THE DEVELOPER SO THAT THEY WOULD BE ABLE TO REQUEST THE RELEASE OF THE ASSURANCES AND THE ORIGINAL DEVOLMENT PACKAGE PERMITS. CURRENTLY THE WORK ON SITE IS WITH THE NEW HOUSING CONSTRUCTION AND THE PLANTING OF THE COMMON AREAS. |
10/17/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CHANGE FROM LAST INSPECTION. |
07/11/2017 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - |
03/23/2017 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - THE CREWS ARE WORKIN ON THE FOLLOWING ITEMS TODAY: 1 DETENTION BASIN SOUTH WALL FOOTER. 2) GAS LINE AND UTILITY INSTALLATION. 3) POURING THE FOOTER FOR THE ROYCE WALLS ALONG THE SOUTH AND EASTERN PERIMETER WALLS. |
02/28/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON GRADING AND DRAINAGE. |
01/30/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON SITE WATER. |
07/16/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
07/11/2017 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - |
07/16/2020 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
08/15/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CHANGE FROM LAST INSPECTION. |
07/11/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - |
06/08/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON HOUSE PADS. |