Permit: DP13-0063
Permit Details
Status:
Complete
Type:
Development Package
Address:
700 W WETMORE RD 02
Address NEW:
700 W WETMORE RD 02
Apply Date:
04/10/2013
Applicant:
Marty Magelli
Description:
GRADING ONLY FOR PHASE 2
Permit Reviews
Permit Number - DP13-0063
Permit Status: Complete
Permit Description: GRADING ONLY FOR PHASE 2
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/10/2013 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 04/10/2013 | COMPLETED |
| 04/10/2013 | GRADING | 05/10/2013 | COMPLETED |
| 09/25/2013 | RESUB - SITE and/or GRADING | 01/23/2015 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP13-0063
Permit Description: GRADING ONLY FOR PHASE 2
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2015 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 04/21/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PHASE II OF PROJECT, SALES BLDG. 2) ENSURE INSTALLED SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION 3) ENSURE STORMWATER SELF INSPECTION ARE PERFORMED AND DOCUMENTED} |
|
| 04/21/2015 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 04/21/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PHASE II OF PROJECT, SALES BLDG. 2) ENSURE INSTALLED SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION 3) ENSURE STORMWATER SELF INSPECTION ARE PERFORMED AND DOCUMENTED} |
|
| 08/23/2016 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/23/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } | |
| 08/23/2016 | ENGR Engineering Final | Passed | {Activity date: 08/23/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 07/21/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - PRIOR TO FIANL APPROVAL FOR PHASE II OF CONSTRUCTION: 1) COMPLETE ALL ASPECTS OF PHASE II 2) ANY OCCUPANCY MUST BE APPROVED AND REMAINING CONSTRUCTION MUST BE PHYSICALLY SEPARATED FROM THE PUBLIC 3) OCCUPANTS MUST BE ABLE TO SAFELY ACCESS BLDG TO INCLUDE HC PARKING AND ACCESS 4) ENSURE ALL PERMANENT STORM DRAINAGE IS IN PLACE AND WORKING} ; {Activity date: 04/27/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) PROVIDE A STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ANY AND ALL SITE/GRADING CHANGES MADE ARE ACCEPTABLE/ PROVIDE A CERT AT FINAL 2) SITE IS UNDER A SWPPP, ENSURE COMPLIANCE UNTIL A NOTICE OF TERMINATION IS FILED WITH ADEQ 3) PROGRESS ON FLAT WORK/CONCRETE - OK SO FAR WILL FOLLOW UP NEXT WEEK} |
|
| 08/23/2016 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/23/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 06/03/2016; Status: Continued; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - 1) PROGRESS INSPECTION FOR SITE/GRADING. NO SITE CONCERNS AT THIS TIME. 2) ENSURE YOUR IN COMPLIANCE WITH YOUR STORM WATER PERMIT AND PLAN UNTIL CONSTRUCTION IS COMPLETED. 3) PRIOR TO FINAL APPROVAL FOR ENGINEERING, ENSURE NO LIFE/SAFETY CONCERNS EXISTS ON SITE AND REMAINING CONSTRUCTION IS SEPARATE FROM PUBLIC ACCESS} ; {Activity date: 04/28/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) FLAT WORK BEING DONE IN VEHICLE PARKING AREA AND DISPLAY AREAS, COMPLETED PER APPROVED PLANS - CHECK PROGRESS. 2) PROVIDE APPROVAL FOR CHANGES MADE TO SITE 3) NO STORM WATER CONCERNS AT THIS TIME} |
|
| 08/23/2016 | ENGR Grading Final | Passed | {Activity date: 08/23/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } | |
| 08/23/2016 | SITE - Stormwater Final Inspection | Passed | {Activity date: 08/23/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } |