Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 04/21/2015 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) PHASE II OF PROJECT, SALES BLDG.
2) ENSURE INSTALLED SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION
3) ENSURE STORMWATER SELF INSPECTION ARE PERFORMED AND DOCUMENTED |