Permit: DP12-0099
Permit Details
Apply Date:
07/05/2012
Applicant:
Description:
DEV PACKAGE
Permit Reviews
Permit Number - DP12-0099
Permit Status: Complete
Permit Description: DEV PACKAGE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/23/2015 | REVISION - GRADING | 01/23/2015 | COMPLETED |
07/05/2012 | DEV PKG - OK TO SUBMIT | 07/05/2012 | COMPLETED |
07/05/2012 | DEV PKG | 09/27/2012 | COMPLETED |
10/22/2013 | DEV PKG - RESUBMITTAL | 11/25/2013 | COMPLETED |
11/13/2014 | REVISION - GRADING | 12/31/2014 | COMPLETED |
12/17/2013 | DEV PKG - RESUBMITTAL | 12/30/2013 | COMPLETED |
12/30/2013 | RESUB - SITE and/or GRADING | 02/12/2014 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP12-0099
Permit Description: DEV PACKAGE
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/26/2014 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 03/26/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE DEVELOPER AND DISCUSSED THE APPROACH THAHE WILL DO ON SOME OF STORMWATER CONTROLS FOR THIS SITE. HE WILL BE DOING SOME OF THE REMOVALS THAT ARE NEEDED AND THEN WILL PLACE HIS SILT FENCE UP ONCE THE REMOVALS ARE COMPLETE. HE HAS BEEN ADVISED THAT THIS IS A DYNAMIC PLAN AND CAN BE ADJUSTED THROUGH OUT HIS CONSTRUCTION PERIOD, HE JUST NEEDS TO MARK AND DATE WHERE HE INSTALLS HIS CONTROLS ON THE SITE PLANS. HE WILL MEET WITH RON EITHER LATER THIS WEEK OR THE FIRST OF NEXT WEEK ONCE THE DEMO WORK HAS BEEN COMPLETED.} | |
11/18/2014 | SITE - Stormwater Follow-up | Passed | {Activity date: 11/18/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
11/18/2014 | SITE - Stormwater Final Inspection | Passed | {Activity date: 11/18/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
11/18/2014 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 11/18/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 04/04/2014; Status: Denied; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET INSTALL OF SWPPP CONTROLS. PROVIDE RED LINES FOR ALL CHANGES TO AP SWPP PLANS.} | |
01/27/2015 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 01/27/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by KROBLES1 - } ; {Activity date: 11/18/2014; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 11/18/2014; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 11/13/2014; Status: Cancelled; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 10/21/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON LANDSCAPING ON NORTH SIDE OF SITE.} | |
01/27/2015 | ENGR Engineering Final | Passed | {Activity date: 01/27/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by KROBLES1 - PER RLEDONNE OK TO APPROVE BY PHONE CONVERSATION} | |
01/27/2015 | ENGR Grading Final | Passed | {Activity date: 01/27/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by KROBLES1 - } ; {Activity date: 12/12/2014; Status: Correction Required; Inspector: JLINVIL1; Comment: Entered by JLINVIL1 - Any missing trees are required to be replaced per the landscape plan notes which require 48" box trees of the same species. A revised plan and COT DOT approval is required for replanting the public right-of-way.} ; {Activity date: 12/02/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - 8 OF THE TREE'S TO REMAIN PER PAGE LA-02 HAVE BEEN REMOVED. 2 NEW FIRE HYDRANT'S PER SITE KEY NOTE #35 HAVE NOT BEEN INSTALLED. SIDE WALK AROUND NEW BUILDING NOT INSTALLED PER PLANS.} |