Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP12-0099
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/26/2014 | PDSD Engineering Division Pre-Construction SITE | DROBERTS | Approved | Entered by DROBERT5 - MET WITH THE DEVELOPER AND DISCUSSED THE APPROACH THAHE WILL DO ON SOME OF STORMWATER CONTROLS FOR THIS SITE. HE WILL BE DOING SOME OF THE REMOVALS THAT ARE NEEDED AND THEN WILL PLACE HIS SILT FENCE UP ONCE THE REMOVALS ARE COMPLETE. HE HAS BEEN ADVISED THAT THIS IS A DYNAMIC PLAN AND CAN BE ADJUSTED THROUGH OUT HIS CONSTRUCTION PERIOD, HE JUST NEEDS TO MARK AND DATE WHERE HE INSTALLS HIS CONTROLS ON THE SITE PLANS. HE WILL MEET WITH RON EITHER LATER THIS WEEK OR THE FIRST OF NEXT WEEK ONCE THE DEMO WORK HAS BEEN COMPLETED. |