Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
530 E VALENCIA RD
Apply Date:
05/09/2012
Applicant:
Description:
REZONING AND DEV. PACKAGE FOR CIRCLE K

Permit Reviews

Permit Number - DP12-0067
Permit Status: Complete
Permit Description: REZONING AND DEV. PACKAGE FOR CIRCLE K
Start Date Submittal Complete Date Status  
04/03/2013 DEV PKG - RESUBMITTAL 05/03/2013 COMPLETED Review Details
04/03/2014 DEV PKG - REVISION 04/04/2014 COMPLETED Review Details
05/03/2013 DEV PKG - RESUBMITTAL 05/03/2013 COMPLETED Review Details
05/07/2013 DEV PKG - RESUBMITTAL 04/03/2014 COMPLETED Review Details
05/09/2012 DEV PKG - OK TO SUBMIT 05/09/2012 COMPLETED Review Details
05/09/2012 DEV PKG 04/03/2013 COMPLETED Review Details
10/07/2014 REVISION - GRADING 10/07/2014 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0067
Permit Description: REZONING AND DEV. PACKAGE FOR CIRCLE K
Total Completed Inspections - 10
Date Description Inspector Results Comments
04/29/2014 COT - ENGR - Site - Assurance Release Passed {Activity date: 04/29/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
04/29/2014 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/29/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
10/01/2014 SITE - SWPPP Correction Notice Passed {Activity date: 10/01/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 04/30/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GC ABOUT TRACK OUT IN STREET.}
10/01/2014 SITE - Stormwater Follow-up Passed {Activity date: 10/01/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/10/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - BASIN HO;DING WATER OVER 12 HR.} ; {Activity date: 09/04/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GC AND HIS PROJECT MANGER . ABOUT CERT LETTER FOR ALL GRADING AND DRAINAGE.} ; {Activity date: 07/15/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.}
10/01/2014 SITE - Stormwater Setup and Controls Passed {Activity date: 10/01/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
10/08/2014 SITE - SWPPP Violation Notice Passed {Activity date: 10/08/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
10/08/2014 SITE - Stormwater Final Inspection Passed {Activity date: 10/08/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
10/09/2014 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/09/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 10/08/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL STABILIZATION AND RIP-RAP PER APPROVDE PLANS.}
10/09/2014 ENGR Engineering Final Passed {Activity date: 10/09/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 10/08/2014; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL NOTES FROM 9-5-14.}
10/09/2014 ENGR Grading Final Passed {Activity date: 10/09/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }

Documents

File Name Document Type  
None LETTER OF COMPLETION VIEW
001_COVER SHEET_1 OF14.TIF DEVELOPMENT PACKAGE VIEW
002_LEGAL DESCRIPTION/REZONING COND_2 OF14.TIF DEVELOPMENT PACKAGE VIEW
003_SITE_3 OF 14.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / DRAINAGE_4 OF 14.TIF DEVELOPMENT PACKAGE VIEW
005_UTILITY_5 OF 14.TIF DEVELOPMENT PACKAGE VIEW
006_SITE CIVIL DETAILS_6 OF 14.TIF DEVELOPMENT PACKAGE VIEW
007_SWPPP / EXISTING CONDITION MAP_7 OF 14.TIF DEVELOPMENT PACKAGE VIEW
008_SWPPP/BMP CONTROLS INSTALLATION MAP_8 OF 14.TIF DEVELOPMENT PACKAGE VIEW
009_L-1_9 OF 14.TIF DEVELOPMENT PACKAGE VIEW
010_L-2_10 OF 14.TIF DEVELOPMENT PACKAGE VIEW
011_L-3_11 OF 14.TIF DEVELOPMENT PACKAGE VIEW
012_L-4_12 OF 14.TIF DEVELOPMENT PACKAGE VIEW
013_EXISTING CONDITION SURVEY_13 OF 14.TIF DEVELOPMENT PACKAGE VIEW
013_SHEET 13 OF 14.TIF DEVELOPMENT PACKAGE VIEW
014_EXISTING CONDITIONS SURVEY_14 OF 14.TIF DEVELOPMENT PACKAGE VIEW
014_SHEET 14 OF 14.TIF DEVELOPMENT PACKAGE VIEW
AIRPORT DISCLOSURE.TIF DOCUMENTS VIEW
TIA E-MAIL.TIF DOCUMENTS VIEW
PAG COMMENTS 5-22-2012.PDF DOCUMENTS VIEW
PAG COMMENTS 4/26/2013 DOCUMENTS VIEW
PAG COMMENTS 4/26/2013 DOCUMENTS VIEW
None DOCUMENTS VIEW