Date Description Inspector Results Comments
10/09/2014 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
10/09/2014 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
10/01/2014 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
10/09/2014 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
10/01/2014 ENGR Grading Final RLEDONNE Partial Approval Entered by RLEDONN1 - WALKED SITE WITH GC.
09/12/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - HYDRO INTERNATIONAL INSTALLED PER GC INFO (ONLY).
09/10/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - BASIN PER SD 307 INSTALLED ON NORTH SIDE OF SITE.
09/10/2014 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 -
09/09/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NEW CATCH BASIN NOT COMPLET.
09/05/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - PROVIDE CERT LETTER FROM ENGINEEROF RECORD FOR ALL GRADING AND DRAINAGE AND AS-BUILTS THAT HAVE BEEN APPROVED BY COT FOR ALL CHANGES TO APPROVED PLANS COMPLET ALL WORK BEFORE CALLING FOR FINAL.
10/09/2014 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
10/07/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ABOUT WORK THAT NEEDS TO BE DONE BEFORE FINAL.
09/12/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - PROVIDE AS-BUILTING FOR ALL CHANGES TO DRAINAGE AND GRADING . BASIN HAS STANDING WATER FOR OVER 48 HR.
09/02/2014 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 - STORM DRAIN PIPING COVERED WITH OUT INSPECTION.
08/26/2014 ENGR Grading Final RLEDONN1 Continued Entered by RLEDONN1 - WORKING ON SIDE WALK ON EAST SIDE OF SITE.
08/22/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WORKING ON WALL ON EAST SIDE.
08/14/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME.
08/08/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - STARTING GRADING WORK IN PARKING AREAS.
08/05/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY.
07/21/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - GOT WITH GC NO CONCERNS AT THIS TIME.
07/08/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT OR GRADING ACTIVITY AT THIS TIME.
07/03/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY.
07/01/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY.
06/24/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY.
06/09/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY ON SITE.
06/05/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY ON SITE.
05/13/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY.
05/01/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT.
04/28/2014 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - GOT WITH GC ABOUT CALLING FOR PRE-CON MEETING.