Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
530 E VALENCIA RD
Apply Date:
05/09/2012
Applicant:
Description:
REZONING AND DEV. PACKAGE FOR CIRCLE K

Permit Reviews

Permit Number - DP12-0067
Permit Status: Complete
Permit Description: REZONING AND DEV. PACKAGE FOR CIRCLE K
Start Date Submittal Complete Date Status  
04/03/2013 DEV PKG - RESUBMITTAL 05/03/2013 COMPLETED Review Details
04/03/2014 DEV PKG - REVISION 04/04/2014 COMPLETED Review Details
05/03/2013 DEV PKG - RESUBMITTAL 05/03/2013 COMPLETED Review Details
05/07/2013 DEV PKG - RESUBMITTAL 04/03/2014 COMPLETED Review Details
05/09/2012 DEV PKG - OK TO SUBMIT 05/09/2012 COMPLETED Review Details
05/09/2012 DEV PKG 04/03/2013 COMPLETED Review Details
10/07/2014 REVISION - GRADING 10/07/2014 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0067
Permit Description: REZONING AND DEV. PACKAGE FOR CIRCLE K
Total Completed Inspections - 10
Date Description Inspector Results Comments
04/29/2014 COT - ENGR - Site - Assurance Release Passed {Activity date: 04/29/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
04/29/2014 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/29/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
10/01/2014 SITE - SWPPP Correction Notice Passed {Activity date: 10/01/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 04/30/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GC ABOUT TRACK OUT IN STREET.}
10/01/2014 SITE - Stormwater Follow-up Passed {Activity date: 10/01/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/10/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - BASIN HO;DING WATER OVER 12 HR.} ; {Activity date: 09/04/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GC AND HIS PROJECT MANGER . ABOUT CERT LETTER FOR ALL GRADING AND DRAINAGE.} ; {Activity date: 07/15/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.}
10/01/2014 SITE - Stormwater Setup and Controls Passed {Activity date: 10/01/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
10/08/2014 SITE - SWPPP Violation Notice Passed {Activity date: 10/08/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
10/08/2014 SITE - Stormwater Final Inspection Passed {Activity date: 10/08/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
10/09/2014 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/09/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 10/08/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL STABILIZATION AND RIP-RAP PER APPROVDE PLANS.}
10/09/2014 ENGR Engineering Final Passed {Activity date: 10/09/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 10/08/2014; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL NOTES FROM 9-5-14.}
10/09/2014 ENGR Grading Final Passed {Activity date: 10/09/2014; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }

Documents

File Name Document Type  
None LETTER OF COMPLETION VIEW
001_COVER SHEET_1 OF14.TIF DEVELOPMENT PACKAGE VIEW
002_LEGAL DESCRIPTION/REZONING COND_2 OF14.TIF DEVELOPMENT PACKAGE VIEW
003_SITE_3 OF 14.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / DRAINAGE_4 OF 14.TIF DEVELOPMENT PACKAGE VIEW
005_UTILITY_5 OF 14.TIF DEVELOPMENT PACKAGE VIEW
006_SITE CIVIL DETAILS_6 OF 14.TIF DEVELOPMENT PACKAGE VIEW
007_SWPPP / EXISTING CONDITION MAP_7 OF 14.TIF DEVELOPMENT PACKAGE VIEW
008_SWPPP/BMP CONTROLS INSTALLATION MAP_8 OF 14.TIF DEVELOPMENT PACKAGE VIEW
009_L-1_9 OF 14.TIF DEVELOPMENT PACKAGE VIEW
010_L-2_10 OF 14.TIF DEVELOPMENT PACKAGE VIEW
011_L-3_11 OF 14.TIF DEVELOPMENT PACKAGE VIEW
012_L-4_12 OF 14.TIF DEVELOPMENT PACKAGE VIEW
013_EXISTING CONDITION SURVEY_13 OF 14.TIF DEVELOPMENT PACKAGE VIEW
013_SHEET 13 OF 14.TIF DEVELOPMENT PACKAGE VIEW
014_EXISTING CONDITIONS SURVEY_14 OF 14.TIF DEVELOPMENT PACKAGE VIEW
014_SHEET 14 OF 14.TIF DEVELOPMENT PACKAGE VIEW
AIRPORT DISCLOSURE.TIF DOCUMENTS VIEW
TIA E-MAIL.TIF DOCUMENTS VIEW
PAG COMMENTS 5-22-2012.PDF DOCUMENTS VIEW
PAG COMMENTS 4/26/2013 DOCUMENTS VIEW
PAG COMMENTS 4/26/2013 DOCUMENTS VIEW
None DOCUMENTS VIEW