Permit: DP12-0047
Permit Details
Apply Date:
04/12/2012
Applicant:
Jeffrey Stanley
Description:
DOLLAR GENERAL
Permit Reviews
Permit Number - DP12-0047
Permit Status: Expired
Permit Description: DOLLAR GENERAL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/12/2012 | DEV PKG - OK TO SUBMIT (SITE) | 04/16/2012 | COMPLETED |
| 04/16/2012 | SITE and/or GRADING | 05/07/2012 | COMPLETED |
| 05/08/2012 | RESUB - SITE and/or GRADING | 05/17/2012 | COMPLETED |
Outstanding Inspections
Permit Status: Expired
Permit Number: DP12-0047
Permite Description: DOLLAR GENERAL
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2012 | PDSD Site/Engineering Division - Landscaping | N/A | Complete (Recurring) | {Activity date: 06/29/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERN FOR THIS ITEM AT THIS TIME.} ; {Activity date: 06/07/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - LECHNER CONSTRUCTION PETER STANEK 850-8912 } |
| 03/17/2021 | ENGR Engineering Final | N/A | Not Ready | {Activity date: 03/17/2021; Status: Not ready for Inspection; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - NA} |
Completed Inspections
Permit Status: Expired
Permit Number: DP12-0047
Permit Description: DOLLAR GENERAL
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/07/2012 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 06/07/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - LECHNER CONSTRUCTION PETER STANEK 850-8912 1) ENGINEERING PRE-CON MEETING ACCOMPLISHED. MET WITH SUPERINTENDENT ON SITE DISCUSSED SITE WORK AND STORM WATER REQUIREMENTS. 2) SITE IS LESS THAN 1 ACRE, NO SWPP REQUIRED HOWEVER THE CONTRACTOR IS STILL REQUIRED TO KEEP SOIL ON SITE DURING CONSTRUCTION, WHILE WORKING IN THE CITY LIMITS. 3) THREE MESQUITE TREES WERE PRESERVED IN PLACE IN ACCORDANCE WITH THIER NPPO/LANDSCAPING PLAN. 4) ENSURE DISTURBED SOIL IS NOT TRACKED ONTO PRINCE ROAD. 5) ALL WASTE MATERIALS USED ON SITE MUST BE DISPOSED OF PROPERLY. 6) ENSURE SITE WORK IS COMPLETED PER YOUR APPROVED GRADING PLAN/LANDSCAPE PLAN. ANY CHANGES MUST BE APPROVED AND SHOWN ON A REVISED PLAN. 7) CALL FOR INSPECTION FOR ANY CONCERNS AND/OR CHANGES MADE} |
|
| 04/23/2018 | SITE - SWPPP Correction Notice | Passed | {Activity date: 04/23/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/23/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 04/23/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/29/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/21/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} | |
| 04/23/2018 | ENGR Grading Final | Passed | {Activity date: 04/23/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/23/2018 | SITE - SWPPP Violation Notice | Passed | {Activity date: 04/23/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/23/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 04/23/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/23/2018 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 04/23/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/23/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 04/23/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } |