Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
03/22/2012
Applicant:
Description:
AREVA E IRVINGTON

Permit Reviews

Permit Number - DP12-0041
Permit Status: Complete
Permit Description: AREVA E IRVINGTON
Start Date Submittal Complete Date Status  
03/22/2012 DEV PKG - OK TO SUBMIT (SITE) 03/22/2012 COMPLETED Review Details
03/22/2012 SITE and/or GRADING 06/01/2012 COMPLETED Review Details
06/01/2012 RESUB - SITE and/or GRADING 06/20/2012 COMPLETED Review Details
06/20/2012 RESUB - SITE and/or GRADING 10/01/2013 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP12-0041
Permit Status: Complete
Permit Description: AREVA E IRVINGTON
Total Outstanding Activity Conditions - 1
Date Name
06/07/2012 The following 12 conditions apply to permit DP12-0041:1)Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at Planning & Development Services Department (PDSD), or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 2)This approved set of plans is approved for earthwork, grading construction, and drainage improvements associated with the AREVA solar project shown within the disturbance limits on the approved plans. 3)Designated staging area shall have no earthwork disturbance, and shall only be used for vehicular & material storage and temporary construction activities.4)A copy of stamped approved plan, permit(s), NOI, AzPDES general permit, and geotechnical report, shall be kept at site at all times, until final approval.5)Disturbance Limits shall be maintained and no disturbance outside of disturbance limits will be allowed. 6)Stabilized entrances shall be maintained at all active access entrances during construction. Use of water trucks during construction, or other dust controls shall be utilized, and construction entrances shall be maintained to minimize sedimentation, dust issues, and tracking.7)Interim erosion and sediment controls shall be maintained per approved plans at downstream areas of disturbance limits. Prior to Final Approval all temporary controls shall be removed and permanent controls shall be placed.8)After construction, all disturbed, graded, or bladed areas not otherwise improved or compacted shall be landscaped, reseeded, or provided with ground cover to help reduce dust pollution. If compacted areas after project completion show signs of dust issues or sedimentation, alternate ground treatment such as gravel or reseed will be required, and may be subject to fines if not addressed.9)Any revisions to the plan must be reviewed by PDSD Engineering Engineer and may include discussion, details, or a revised plan. Call PDSD Engineering at 791-5550 to discuss any revisions.10)If construction is expected to last longer than expiration date of permit, contact PDSD to renew/extend permit. If Final Inspection has not been completed before permit expires, and permit has not been renewed, additional fees and reviews may be required. Requests for permit extensions may be submitted to Planning & Development Services Department (attn: Claudia Buford), prior to permit expiration date, for consideration of plan extension approval.11)Permitee shall notify PDSD when operation is ready for final inspection. Final approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all erosion control measures have been completed in accordance with approved plan and permit, and all conditions of permit are completed. 12)As-builts are required to be submitted under activity number DP12-0041 to PDSD permit clerks. They will be reviewed and then if acceptable, a copy will be provided to PDSD Engineering Inspector for final inspections. For Permit Project Closure documentation, submit: 2 copies of cover letter stating any changes to the approved plans, 2 copies of as-builts, and 2 copies of a letter for substantial completion of overall project. As-builts shall include: inverts for inlets and outlets for drainage pipes/systems, and general grades as determined by RLS to show substantial completion for project.

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0041
Permit Description: AREVA E IRVINGTON
Total Completed Inspections - 7
Date Description Inspector Results Comments
10/09/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/09/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT, DISCUSSED SWPPP, REQUIREMENTS AND SITE/GRADING WORK.
1) USEEXISTING BIRMS FOR SEDIMENT CONTROLS AS MUCH AS POSSIBLE. IN AREAS WHERE BIRMS WILL BE REMOVED, INSTALL BMP'S UNTIL THE SITE IS STABILIZED.
2) INSTALL AND USE A STABILIZED CONSTR ENTRANCE
3) A COPY OF YOUR NOI HAS BEEN POSTED AT THE ENTRANCE TO THE SITE
4) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE WHEN APPLICABLE.
5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR PLAN.
6) SWEEP UP ANY TRACKED SOIL OF ADJACENT ROADWAYS AS NEEDED.}
12/04/2013 SITE - Stormwater Setup and Controls Passed {Activity date: 12/04/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION PER YOUR SWPPP.
2) PERIODIC FOLLOW UP INSPECTIONS WILL BE DONE TO DETERMINE IF ADDITIONAL CONTROLS ARE NEEDED AND THE SITE IS IN COMPLIANCE WITH AZPDES AND YOUR SWPPP.} ; {Activity date: 10/09/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SUPERINTENDENT, DISCUSSED SWPPP, REQUIREMENTS AND SITE/GRADING WORK.
1) USE EXISTING BIRMS FOR SEDIMENT CONTROLS AS MUCH AS POSSIBLE. IN AREAS WHERE BIRMS WILL BE REMOVED, INSTALL BMP'S UNTIL THE SITE IS STABILIZED.
2) INSTALL AND USE A STABILIZED CONSTR ENTRANCE
3) A COPY OF YOUR NOI HAS BEEN POSTED AT THE ENTRANCE TO THE SITE
4) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE WHEN APPLICABLE.
5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR PLAN.
6) SWEEP UP ANY TRACKED SOIL OF ADJACENT ROADWAYS AS NEEDED.}
12/13/2013 ENGR Engineering Final Passed {Activity date: 12/13/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - GRADING HAS BEEN COMPLETED PER THE APPROVED GRADING PLAN}
12/13/2013 SITE - Stormwater Follow-up Passed {Activity date: 12/13/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE HAS BEEN COMPLETED PER THE APPROVED PLAN.
SUBMIT A NOTICE OF TERMINATION TO ADEQ} ; {Activity date: 11/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/07/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR SETTING GRADES AND SHAPING THE SITE.
NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/31/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
12/13/2013 ENGR Grading Final Passed {Activity date: 12/13/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 12/04/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT SITE CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 11/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 11/07/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR SETTING GRADES AND SHAPING THE SITE.
NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/31/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR ROUGH GRADING THE SITE PER APPROVED PLAN}
12/13/2013 SITE - Stormwater Final Inspection Passed {Activity date: 12/13/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE HAS BEEN COMPLETED PER THE APPROVED PLAN.
SUBMIT A NOTICE OF TERMINATION TO ADEQ}
05/29/2019 RSBU - Building Final Passed {Activity date: 05/29/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }

Documents

File Name Document Type  
001_COVER SHEET_C1.TIF DEVELOPMENT PACKAGE VIEW
002_ZONING LOCATION_C2.TIF DEVELOPMENT PACKAGE VIEW
003_TEP BOUNDARY_C3.TIF DEVELOPMENT PACKAGE VIEW
004_SITE_C4.TIF DEVELOPMENT PACKAGE VIEW
005_SECTION VIEWS_C5.TIF DEVELOPMENT PACKAGE VIEW
006_SECTION VIEWS_C6.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW