Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP12-0040

Parcel: Unknown


Addresses:

1545 E COPPER ST


Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Permit Number - DP12-0040

Inspection Description - PDSD Engineering Division Pre-Construction SITE

Inspection Status - Passed

Date Description Inspector Results Comments
06/13/2012 PDSD Engineering Division Pre-Construction SITE MRUSSO Approved Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED AND SHOWN (REDLINED) ON THE APPROVED SWPPP. 2) PRE-CON MEETING NOT CALLED IN FOR INSPECTION. DIVERSIFIED IS THE GENERAL CONTRACTOR AND RICHARD KIN (327-7384) IS THE SUPERINTENDENT. 3) SEDIEMNT CONTROLS MAY NEED TO BE ADDED TO THE EXISTING ONE BASED ON CONDITIONS ON SITE AND YOUR INSPECTORS RECOMMENDATION. 4) ENSURE TO MAINTAIN YOUR CONTROLS PER THE SWPPP. 5) SWEEP UP TRACKING AS NEEDED. 6) CALL FOR INSPECTION FOR ANY CHANGES TO EXISTING APPROVED PLANS.