Permit: DP12-0040
Permit Details
Apply Date:
03/21/2012
Applicant:
Description:
SALPOINT CATHOLIC HIGH SCHOOL
Permit Reviews
Permit Number - DP12-0040
Permit Status: Complete
Permit Description: SALPOINT CATHOLIC HIGH SCHOOL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/21/2012 | DEV PKG - OK TO SUBMIT | 03/21/2012 | COMPLETED |
| 03/21/2012 | DEV PKG | 05/02/2012 | COMPLETED |
| 05/02/2012 | DEV PKG - RESUBMITTAL | 05/03/2012 | COMPLETED |
| 05/03/2012 | DEV PKG - RESUBMITTAL | 05/24/2012 | COMPLETED |
| 05/24/2012 | DEV PKG - RESUBMITTAL | 05/24/2012 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP12-0040
Permit Description: SALPOINT CATHOLIC HIGH SCHOOL
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/13/2012 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 06/13/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED AND SHOWN (REDLINED) ON THE APPROVED SWPPP. 2) PRE-CON MEETING NOT CALLED IN FOR INSPECTION. DIVERSIFIED IS THE GENERAL CONTRACTOR AND RICHARD KIN (327-7384) IS THE SUPERINTENDENT. 3) SEDIEMNT CONTROLS MAY NEED TO BE ADDED TO THE EXISTING ONE BASED ON CONDITIONS ON SITE AND YOUR INSPECTORS RECOMMENDATION. 4) ENSURE TO MAINTAIN YOUR CONTROLS PER THE SWPPP. 5) SWEEP UP TRACKING AS NEEDED. 6) CALL FOR INSPECTION FOR ANY CHANGES TO EXISTING APPROVED PLANS.} |
|
| 06/13/2012 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 06/13/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED AND SHOWN (REDLINED) ON THE APPROVED SWPPP. 2) PRE-CON MEETING NOT CALLED IN FOR INSPECTION. DIVERSIFIED IS THE GENERAL CONTRACTOR AND RICHARD KIN (327-7384) IS THE SUPERINTENDENT. 3) SEDIEMNT CONTROLS MAY NEED TO BE ADDED TO THE EXISTING ONE BASED ON CONDITIONS ON SITE AND YOUR INSPECTORS RECOMMENDATION. 4) ENSURE TO MAINTAIN YOUR CONTROLS PER THE SWPPP. 5) SWEEP UP TRACKING AS NEEDED. 6) CALL FOR INSPECTION FOR ANY CHANGES TO EXISTING APPROVED PLANS.} |
|
| 04/24/2018 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 04/24/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/24/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 04/24/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 07/12/2012; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH KEN ON SITE AND ASKED HIM TO REPOST THE SWPPP BOARD ON THIS SITE, HE ADVISED ME THAT IT HAD BEEN STOLEN. NO OTHER CONCERNS AT THIS TIME FROM THE PREVIOUS RAINS THIS PAST WEEK.} ; {Activity date: 06/27/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FOLLOW UP ON STORM WATER AND GRADING PROGRESS. NO CONCERNS AT THIS TIME. ENSURE SEDIMENT CONTROLS ARE MAINTAINED CALL FOR RE-INSPECTION IF ANY CHANGES OCCUR TO APPROVED PLANS} ; {Activity date: 06/13/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED AND SHOWN (REDLINED) ON THE APPROVED SWPPP. 2) PRE-CON MEETING NOT CALLED IN FOR INSPECTION. DIVERSIFIED IS THE GENERAL CONTRACTOR AND RICHARD KIN (327-7384) IS THE SUPERINTENDENT. 3) SEDIEMNT CONTROLS MAY NEED TO BE ADDED TO THE EXISTING ONE BASED ON CONDITIONS ON SITE AND YOUR INSPECTORS RECOMMENDATION. 4) ENSURE TO MAINTAIN YOUR CONTROLS PER THE SWPPP. 5) SWEEP UP TRACKING AS NEEDED. 6) CALL FOR INSPECTION FOR ANY CHANGES TO EXISTING APPROVED PLANS.} |
|
| 04/24/2018 | ENGR Grading Final | Passed | {Activity date: 04/24/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 07/09/2012; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET ON-SITE WITH KEN FROM DIVERSIFIED AND LOOKED AT WHAT HE IS CURRENTLY WORKING ON ON THIS SITE. HE CONTINUES TO FORM AND POUR THE CURBS WITHIN THE PARKING AREA, AND IS WORKING ON PROCESSING THE SUBGRADE FOR THE PARKING AREAS. HE WILL LET ME KNOW HOW THE WORK IS PROGREESSING ON MONDAY OF THIS NEXT WEEK. ALSO ASKED HIM TO REPOST THE SWPPP BOARD ON THIS SITE, HE ADVISED ME THAT IT HAD BEEN STOLEN.} ; {Activity date: 06/27/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FOLLOW UP ON STORM WATER AND GRADING PROGRESS. NO CONCERNS AT THIS TIME. ENSURE SEDIMENT CONTROLS ARE MAINTAINED CALL FOR RE-INSPECTION IF ANY CHANGES OCCUR TO APPROVED PLANS} ; {Activity date: 06/22/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEDIMENT CONTROLS IN PLACE. SITE WORK BEING DONE. RET/DET BASIN ROUGHED IN NO CONCERNS AT THIS TIME} |
|
| 04/24/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 04/24/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 07/08/2019 | ENGR Engineering Final | Passed | {Activity date: 07/08/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/24/2018; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONSTRUCTION COMPLETE NO AS-BUILT, NO CERT} |