Permit: DP12-0036
Permit Details
Apply Date:
03/14/2012
Applicant:
Lisa Bowers
Description:
QUIKTRIP STORE #1476
Permit Reviews
Permit Number - DP12-0036
Permit Status: Complete
Permit Description: QUIKTRIP STORE #1476
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/14/2012 | DEV PKG - OK TO SUBMIT | 03/15/2012 | COMPLETED |
03/15/2012 | DEV PKG | 04/17/2012 | COMPLETED |
05/31/2012 | DEV PKG - RESUBMITTAL | 07/09/2012 | COMPLETED |
09/26/2012 | DEV PKG - RESUBMITTAL | 10/10/2012 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP12-0036
Permit Description: QUIKTRIP STORE #1476
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/02/2012 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 11/02/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) SILT FENCE HAS BEEN INSTALLED. TRENCH- IN FENCE ALONG THE NW CORNER OR INSTALL SILT SOCK TO PROTECT EXISTING STORM CATCH BASIN. 2) A STABILIZED CONSTRUCTION ENTRANCE HAS BEEN INSTALLED BUT MAY BE MOVED IF NEEDED. 3) POST A COPY OF YOUR SIGNED NOI AT THE ENTRANCE TO THE SITE. 4) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE. 5) SWEEP UP TRACKED SOIL OFF ROADWAYS AS NEEDED.} |
|
11/16/2012 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 11/16/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
03/04/2013 | SITE - Stormwater Follow-up | Passed | {Activity date: 03/04/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/21/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 02/19/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/28/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR POURED CURB ALONG THE PRIVATE ROADWAY ENTRANCE. A TRANSITION WAS MADE BETWEEN THE EXISTING WEDGE CURB AND NEW VERTICLE CURB. 2) THE CONTRACTOR NEEDS TO CLEAN UP THE CONCRETE WASH OUT AND RE-INSTALL IT 3) CONTRACTOR4 NEEDS TO MAINTAIN INSTALLED SEDIEMNT CONTROLS UNTIL THE SITE IS PAVED } ; {Activity date: 01/10/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) DRAINAGE CHANNEL CONSTRUCTED ALONG WEST SIDE 2) SWEEP UP SOIL AT ENTRANCE/EXIT TO SITE 3) CONTRACTOR WORKING ON MAIN ENTRANCE OFF OF BROADWAY. 4) CONTRACTOR WORKING ON REMOVING POWER POLE FROM SITE. 5) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/10/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED STORM PIPE BEING INSTALLED ALONG SOUTH SIDE OF SITE. 2) PIPE CONNECTED TO A BUBBLER BOX LOCATED IN THE RET/DET BASIN. OK TO COVER 3) REPAIR SILT FENCE AND REMOVE MATERIAL FROM ONTOP OF FENCE. 4) SWEEP UP TRACKED SOIL.} ; {Activity date: 12/14/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - RAINING, NO ACTIVITY SEDIMENT CONTROLS IN PLACE} ; {Activity date: 12/12/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 12/05/2012; Status: Continued; Inspector: RUSSO; Comment: Entered by DROBERT5 - 1) WALKED SITE, INSPECTED RUN OF SRP ALONG FRONT OF SITE FROM RET BASIN TO FAR NORTH WEST CORNER WEIR. 2) REPAIR PERIMETER SEDIMENT CONTROLS AND DOCUMENT THE REPAIR. 3) CALL FOR RE-INSPECTION WHEN COMPLETED.} ; {Activity date: 12/03/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 11/28/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED STORM PIPE BEING INSTALLED ALONG SOUTH SIDE OF SITE. 2) PIPE CONNECTED TO A BUBBLER BOX LOCATED IN THE RET/DET BASIN. OK TO COVER 3) REPAIR SILT FENCE AND REMOVE MATERIAL FROM ONTOP OF FENCE. 4) SWEEP UP TRACKED SOIL.} ; {Activity date: 11/16/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) REPAIR/REPLACE SILT FENCE ALONG NW AND TNE NORTH SIDE OF SITE 2) SWEEP UP TRACKED SOIL OFFF ADJACENT ROADWAY ROUTINELY. 3) 63 LF OF 12" PVC SDR 35 WAS INSTALLED FROM BUBBLER BOX TO CANOPY LATERAL ( SLOPE @ 1% OR GREATER) - CLEAN OUT NOT IN YET. 4) NEED TO VERIFY BUBBLER BOX GRAVEL PACK IS 4' DEEP AND 1-3" ANGULAR ROCK. - OK 5) CALL FOR INSPECTION PRIOR TO COVER FOR ANY AND ALL STORM DRAIN LINE INSTALLATION - NEED TO VERIFY MATERIAL, SLOPE, DIMENTION, ETC.... 1 1/2 - 3" ROCK IN BUBBLER BOXES 64' OF 21'X15' SQUASHED CMP BASIN TO BASIN 71' OF 8" PVC @ BUBBLER SOUTH OF BLDG 130' OF 12" PVC FOR CANOPY LATERAL W/4" ROOF DRAIN LINES 150' OF 3" ROOF FROM BLDG} |
|
03/04/2013 | ENGR Grading Final | Passed | {Activity date: 03/04/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - THE MAJORITY OF SITE WORK HAS BEEN COMPLETED. 1) PROVIDE CERT STATEMENT FROM THE ENG OF RECORD 2) SUBMIT AN AS-BUILT TO THE CITY OF TUCSON 3) COMPLETE LANDSCAPE AREA ALONG CHANNEL 4) COMPLETE CANOPY AND BLDG CONSTR.} ; {Activity date: 02/21/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 01/28/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR POURED CURB ALONG THE PRIVATE ROADWAY ENTRANCE. A TRANSITION WAS MADE BETWEEN THE EXISTING WEDGE CURB AND NEW VERTICLE CURB. 2) THE CONTRACTOR NEEDS TO CLEAN UP THE CONCRETE WASH OUT AND RE-INSTALL IT 3) CONTRACTOR4 NEEDS TO MAINTAIN INSTALLED SEDIEMNT CONTROLS UNTIL THE SITE IS PAVED } ; {Activity date: 01/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - LOOKED AT TRANSITION OF SIDEWALK TO HC RAMP AT NE ENTRANCE TO SITE ALONG PRIVATE ROADWAY. WEDGE CURB ON ONE SIDE AND VERTICAL CURB} ; {Activity date: 01/10/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) DRAINAGE CHANNEL CONSTRUCTED ALONG WEST SIDE 2) SWEEP UP SOIL AT ENTRANCE/EXIT TO SITE 3) CONTRACTOR WORKING ON MAIN ENTRANCE OFF OF BROADWAY. 4) CONTRACTOR WORKING ON REMOVING POWER POLE FROM SITE. 5) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/10/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED STORM PIPE BEING INSTALLED ALONG SOUTH SIDE OF SITE. 2) PIPE CONNECTED TO A BUBBLER BOX LOCATED IN THE RET/DET BASIN. OK TO COVER 3) REPAIR SILT FENCE AND REMOVE MATERIAL FROM ONTOP OF FENCE. 4) SWEEP UP TRACKED SOIL.} ; {Activity date: 12/14/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - RAINING, NO ACTIVITY SEDIMENT CONTROLS IN PLACE} ; {Activity date: 12/12/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 12/05/2012; Status: Continued; Inspector: RUSSO; Comment: Entered by DROBERT5 - 1) WALKED SITE, INSPECTED RUN OF SRP ALONG FRONT OF SITE FROM RET BASIN TO FAR NORTH WEST CORNER WEIR. 2) REPAIR PERIMETER SEDIMENT CONTROLS AND DOCUMENT THE REPAIR. 3) CALL FOR RE-INSPECTION WHEN COMPLETED.} ; {Activity date: 12/03/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 11/29/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - INSPECTED STORM DRAIN PIPING AROUND BLDG. 8/4/3" PVC W/ CLEANOUTS AND CONNECTIONS TO THE ROOF DRAINS AND A BUBBLER BOX LOCATED IN THE RET BASIN. OK TO COVER} ; {Activity date: 11/28/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED STORM PIPE BEING INSTALLED ALONG SOUTH SIDE OF SITE. 2) PIPE CONNECTED TO A BUBBLER BOX LOCATED IN THE RET/DET BASIN. OK TO COVER 3) REPAIR SILT FENCE AND REMOVE MATERIAL FROM ONTOP OF FENCE. 4) SWEEP UP TRACKED SOIL.} ; {Activity date: 11/16/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) REPAIR/REPLACE SILT FENCE ALONG NW AND TNE NORTH SIDE OF SITE 2) SWEEP UP TRACKED SOIL OFFF ADJACENT ROADWAY ROUTINELY. 3) 63 LF OF 12" PVC SDR 35 WAS INSTALLED FROM BUBBLER BOX TO CANOPY LATERAL ( SLOPE @ 1% OR GREATER) - CLEAN OUT NOT IN YET. 4) NEED TO VERIFY BUBBLER BOX GRAVEL PACK IS 4' DEEP AND 1-3" ANGULAR ROCK. - OK 5) CALL FOR INSPECTION PRIOR TO COVER FOR ANY AND ALL STORM DRAIN LINE INSTALLATION - NEED TO VERIFY MATERIAL, SLOPE, DIMENTION, ETC.... 1 1/2 - 3" ROCK IN BUBBLER BOXES 64' OF 21'X15' SQUASHED CMP BASIN TO BASIN 71' OF 8" PVC @ BUBBLER SOUTH OF BLDG 130' OF 12" PVC FOR CANOPY LATERAL W/4" ROOF DRAIN LINES 150' OF 3" ROOF FROM BLDG} |
|
03/06/2013 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 03/06/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/04/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - THE MAJORITY OF PLANTING AND GROUND COVER HAS BEEN INSTALLED. WILL INSPECT MONDAY 3/4/13 FOR FINAL APPROVAL} |
|
03/06/2013 | ENGR Engineering Final | Passed | {Activity date: 03/06/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NOTICE OF TERMINATION WAS FILED WITH THE STATE, A COPY WAS GIVEN TO THE COT 2) THE STORM DRAIN CERT STATEMENT FROM THE ENG OF RECORD WAS GIVEN TO THE COT 3) AN AS-BUILT DRAWING WAS SUBMITTED TO THE CITY} ; {Activity date: 03/04/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - THE MAJORITY OF SITE WORK HAS BEEN COMPLETED. 1) PROVIDE CERT STATEMENT FROM THE ENG OF RECORD 2) SUBMIT AN AS-BUILT TO THE CITY OF TUCSON 3) COMPLETE LANDSCAPE AREA ALONG CHANNEL 4) COMPLETE CANOPY AND BLDG CONSTR.} |
|
03/06/2013 | SITE - Stormwater Final Inspection | Passed | {Activity date: 03/06/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/04/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - THE MAJORITY OF THE SITE HAS BEEN STABILIZED. BE SURE TO SUBMIT A NOTICE OF TERMINATION (NOT) TO THE STATE OF ARIZONA} |
|
04/19/2017 | RSBU - Building Final | Passed | {Activity date: 04/19/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |