Status:
Complete
Type:
Development Package
Address NEW:
5545 E BROADWAY BL
Apply Date:
01/11/2012
Applicant:
Description:
NEC BROADWAY AND CRAYCROFT RETAIL CENTER

Permit Reviews

Permit Number - DP12-0007
Permit Status: Complete
Permit Description: NEC BROADWAY AND CRAYCROFT RETAIL CENTER
Start Date Submittal Complete Date Status  
01/11/2012 DEV PKG - OK TO SUBMIT 01/11/2012 COMPLETED Review Details
01/17/2012 SITE 01/31/2012 COMPLETED Review Details
02/02/2012 RESUBMITTAL - SITE ALL 02/16/2012 COMPLETED Review Details
02/16/2012 RESUBMITTAL - SITE 05/16/2012 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0007
Permit Description: NEC BROADWAY AND CRAYCROFT RETAIL CENTER
Total Completed Inspections - 11
Date Description Inspector Results Comments
05/19/2012 PDSD Site/Engineering Division - NPPO Passed {Activity date: 05/19/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NPPO:
1) ADD TWO OCCOTILLO'S DURING THE LANDSCAPING PHASE IN ORDER TO REPLACE THE ONES SHOWN ON THE NPPO PLAN THAT ARE MISSING.
2) EXISTING OLIVE TREES PLANTED ALONG THE SOUTH SIDE OF THE PROJECT ARE IN THE RIGHT-OF-WAY. THE CONTRACTOR WILL LANDSCAPE WITH DESERT PLANTS FROM THE PROPERTY LINE IN. THE CONTRACTOR ASKED IF THE OLIVE TREES CAN BE REMOVED.
3) DATE PALM TREES ALONG THE SOUTH SIDE OF THE BLDG WILL BE MOVED AND RE-PLANTED}
05/19/2012 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 05/19/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - SWPPP:
1) INSTALL SEDIMENT CONTROLS AS SHOWN ON APPROVED STORM WATER PLAN.
2) POST A COPY OF YOUR SIGNED NOI ON SITE.
3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE OR ENTRANCES AT ALL ROUTES TO AND FROM THE SITE AS SHOWN ON THE APPROVED STORM WATER PLAN.
4) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE.
5) SHOW ANY AND ALL CHANGES MADE TO THE APPROVED STORM WATER PLAN.
6) ENSURE TO PERFOM STORM WATER SELF INSPECTION AS REQUIRED UNDER YOUR PLAN. INSPECTIONS MUST BE DOCUMENTED.

NPPO:
1) ADD TWO OCCOTILLO'S DURING THE LANDSCAPING PHASE IN ORDER TO REPLACE THE ONES SHOWN ON THE NPPO PLAN THAT ARE MISSING.
2) EXISTING OLIVE TREES PLANTED ALONG THE SOUTH SIDE OF THE PROJECT ARE IN THE RIGHT-OF-WAY. THE CONTRACTOR WILL LANDSCAPE WITH DESERT PLANTS FROM THE PROPERTY LINE IN. THE CONTRACTOR ASKED IF THE OLIVE TREES CAN BE REMOVED.
3) DATE PALM TREES ALONG THE SOUTH SIDE OF THE BLDG WILL BE MOVED AND RE-PLANTED}
09/13/2012 SITE - SWPPP Correction Notice Passed {Activity date: 09/13/2012; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - TRCK OUT ROCK WAS ADDED.} ; {Activity date: 09/06/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH CONTRACTOR TO ADD ROCK TO CONSTRUCTION ENTRANCE.} ; {Activity date: 08/22/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - TRACK OUT STILL ON STREET.}
02/25/2013 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 02/25/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/01/2013; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON LANSCAPING ON SOUTH EAST SIDE OF SITE.} ; {Activity date: 06/27/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - AGREEMENT MADE WITH THE CITY OF TUCSON TO REMOVE SOME EXISTING OLIVE TREES ALONG BROADWAY RD.

MOST DEMO WORK HAS BEEN COMPLETED.
ROUGH GRADING TAKING PLACE.
NO STORM WATER CONCERNS AT THIS TIME.}
02/25/2013 SITE - Stormwater Follow-up Passed {Activity date: 02/25/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/29/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - CONTROLS BACK IN PLACE. STILL NEED TO ADD ROCK AT ENTRANCE.} ; {Activity date: 07/26/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NEED TO ADD SWPPP CONTROLS AT SOUTH WEST GATE.} ; {Activity date: 07/18/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 06/27/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MOST DEMO WORK HAS BEEN COMPLETED.
ROUGH GRADING TAKING PLACE.
NO STORM WATER CONCERNS AT THIS TIME.} ; {Activity date: 06/26/2012; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - REPAIR ALL SWPPP CONTROLS .POVIDE SWPPP INFO AT GATE.POVIDE NOI.} ; {Activity date: 06/14/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 06/06/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 05/23/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SEE THE COMMENTS THAT HAVE BEEN PREVIOUSLY NOTED BY MR. RUSSO DURING THE PRE-CONSTRUCTION MEETING LAST WEEK.

SWPPP:
1) INSTALL SEDIMENT CONTROLS AS SHOWN ON APPROVED STORM WATER PLAN.
2) POST A COPY OF YOUR SIGNED NOI ON SITE.
3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE OR ENTRANCES AT ALL ROUTES TO AND FROM THE SITE AS SHOWN ON THE APPROVED STORM WATER PLAN.
4) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE.
5) SHOW ANY AND ALL CHANGES MADE TO THE APPROVED STORM WATER PLAN.
6) ENSURE TO PERFOM STORM WATER SELF INSPECTION AS REQUIRED UNDER YOUR PLAN. INSPECTIONS MUST BE DOCUMENTED.

NPPO:
1) ADD TWO OCCOTILLO'S DURING THE LANDSCAPING PHASE IN ORDER TO REPLACE THE ONES SHOWN ON THE NPPO PLAN THAT ARE MISSING.
2) EXISTING OLIVE TREES PLANTED ALONG THE SOUTH SIDE OF THE PROJECT ARE IN THE RIGHT-OF-WAY. THE CONTRACTOR WILL LANDSCAPE WITH DESERT PLANTS FROM THE PROPERTY LINE IN. THE CONTRACTOR ASKED IF THE OLIVE TREES CAN BE REMOVED.
3) DATE PALM TREES ALONG THE SOUTH SIDE OF THE BLDG WILL BE MOVED AND RE-PLANTED}
02/25/2013 SITE - SWPPP Violation Notice Passed {Activity date: 02/25/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
02/25/2013 SITE - Stormwater Final Inspection Passed {Activity date: 02/25/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
02/25/2013 SITE - Stormwater Setup and Controls Passed {Activity date: 02/25/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/28/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CREWS HAVE COMPLETED THE INSTALLATION OF THE FENCE MATERIAL AND WILL BE HAULING IN MATERIAL FOR THE CONSTRUCTION ENTRANCES INTO THIS SITE. THEY WILL BE PLACING WADLE AS IT IS NEEDED AND WILL CALL IN FOR ANOTHER INSPECTION ONCE THIS HAS BEEN DONE.} ; {Activity date: 05/23/2012; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NOTHING IS INSTALLED AT THIS TIME, FENCING MATERIAL WILL BE INSTALLED ON 5/24/2012, ALONG WITH SOME OF THE CONTROLS. I WILL RECHECK THIS SITE ONCE ALL OF THE CURRENT CONTROLS ARE INSTALLED.}
04/17/2013 ENGR Engineering Final Passed {Activity date: 04/17/2013; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CERTIFICATION LETTER HAS BEEN PROVIDED AS REQUESTED.} ; {Activity date: 04/12/2013; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - SITE READY BUT THE CERTIFICATION LETTER IS NOT AS REQUESTED.}
04/17/2013 ENGR Grading Final Passed {Activity date: 04/12/2013; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - SITE NOT READY AT THIS TIME.} ; {Activity date: 04/17/2013; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE APPROVED AT THIS TIME.}
10/28/2014 RSBU - Building Final Passed {Activity date: 10/28/2014; Status: Approved; Inspector: kmedina; Comment: Entered by KMEDINA1 - }