Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 02/25/2013 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 08/29/2012 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - CONTROLS BACK IN PLACE. STILL NEED TO ADD ROCK AT ENTRANCE. |
| 07/26/2012 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NEED TO ADD SWPPP CONTROLS AT SOUTH WEST GATE. |
| 07/18/2012 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 06/27/2012 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - MOST DEMO WORK HAS BEEN COMPLETED.
ROUGH GRADING TAKING PLACE.
NO STORM WATER CONCERNS AT THIS TIME. |
| 06/26/2012 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - REPAIR ALL SWPPP CONTROLS .POVIDE SWPPP INFO AT GATE.POVIDE NOI. |
| 06/14/2012 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - NO CONCERNS AT THIS TIME. |
| 06/06/2012 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - NO CONCERNS AT THIS TIME. |
| 05/23/2012 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - SEE THE COMMENTS THAT HAVE BEEN PREVIOUSLY NOTED BY MR. RUSSO DURING THE PRE-CONSTRUCTION MEETING LAST WEEK.
SWPPP:
1) INSTALL SEDIMENT CONTROLS AS SHOWN ON APPROVED STORM WATER PLAN.
2) POST A COPY OF YOUR SIGNED NOI ON SITE.
3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE OR ENTRANCES AT ALL ROUTES TO AND FROM THE SITE AS SHOWN ON THE APPROVED STORM WATER PLAN.
4) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE.
5) SHOW ANY AND ALL CHANGES MADE TO THE APPROVED STORM WATER PLAN.
6) ENSURE TO PERFOM STORM WATER SELF INSPECTION AS REQUIRED UNDER YOUR PLAN. INSPECTIONS MUST BE DOCUMENTED.
NPPO:
1) ADD TWO OCCOTILLO'S DURING THE LANDSCAPING PHASE IN ORDER TO REPLACE THE ONES SHOWN ON THE NPPO PLAN THAT ARE MISSING.
2) EXISTING OLIVE TREES PLANTED ALONG THE SOUTH SIDE OF THE PROJECT ARE IN THE RIGHT-OF-WAY. THE CONTRACTOR WILL LANDSCAPE WITH DESERT PLANTS FROM THE PROPERTY LINE IN. THE CONTRACTOR ASKED IF THE OLIVE TREES CAN BE REMOVED.
3) DATE PALM TREES ALONG THE SOUTH SIDE OF THE BLDG WILL BE MOVED AND RE-PLANTED |