Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
5653 S NOGALES HY
Apply Date:
11/15/2011
Applicant:
Description:
REYNA HEATING & AIR CONDITIONING

Permit Reviews

Permit Number - DP11-0010
Permit Status: Complete
Permit Description: REYNA HEATING & AIR CONDITIONING
Start Date Submittal Complete Date Status  
02/17/2012 SITE 05/08/2012 COMPLETED Review Details
05/23/2012 RESUB - SITE and/or GRADING 05/23/2012 COMPLETED Review Details
09/07/2012 REVISION - SITE 09/11/2012 COMPLETED Review Details
11/15/2011 DEV PKG - OK TO SUBMIT (SITE) 02/17/2012 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP11-0010
Permit Description: REYNA HEATING & AIR CONDITIONING
Total Completed Inspections - 2
Date Description Inspector Results Comments
10/01/2021 ENGR Engineering Final Passed {Activity date: 10/01/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - - FINAL IS APPROVED} ; {Activity date: 09/30/2021; Status: Not Applicable; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - NA.} ; {Activity date: 12/07/2020; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - PARTIAL AT THIS TIME. MET WITH JESUS FROM JACA CONSTRUCTION TO WALK THE SITE TOO SEE WHAT IS NEEDED TO COMPLETE AND CLOSE THIS SITE. HE HAS BEEN ADVISED THAT I NEED AN ENGINEERING CERTIFICATION LETTER FOR THE WORK THAT HAS BEEN ELIMINATED FROM THIS SITE. ALSO THEY WILL NEED TO CHECK AND MAKE THE NECESSARY CHANGES FOR ALL NON COMPLIANT ADA ASPECTS ON THIS SITE, PARKING AND ACCESS AISLE, SIDEWALK/PEDESTRIAN PATHWAYS FROM THE STREET INTO THE STRUCTURES LOCATED ON THIS SITE.}
10/01/2021 ENGR Grading Final Passed {Activity date: 10/01/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/30/2021; Status: Not Applicable; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - NA.} ; {Activity date: 08/05/2020; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CORRECTIONS NEEDED, SITE HAS NOT BEEN CONSTRUCTED PER THE APPROVED PLANS, SEE PREVIOUS COMMENTS.} ; {Activity date: 04/26/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - RON WAS NOT ABLE TO GET INTO CONTACT WITH THE OWNER FOR THIS SITE TO SEE WHAT IS HAPPENING WITH THE CLOSING OF THE PERMIT
} ; {Activity date: 08/18/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ACTIVITY ON SITE.}

Documents

File Name Document Type  
DP11-0010 CERTIFICATION LETTER, JAS ENGINEERING, 09.09.21.PDF DOCUMENTS VIEW
SITE PLAN DEVPLANS VIEW
SIGNED CITY PERMIT AND REVIEW CARD DOCUMENTS VIEW