Parcel Search: 133121070
Parcel Search
Parcel Attributes
| Parcel | 133121070 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-1 |
| Tucson Ward | Ward 2 |
| Tucson Registered Neighborhood | Pio Decimo |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 08/19/2026 10:28 a.m.
Total Number Of OZC Plans - (1)
Special Development Requests & Requirements
Date - 08/19/2026 10:28 a.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| H000005077 | Closed | N/A | RECORD TO SHOW BILLBOARD AZ488/CLEAR CHANNEL #301 REMOVED DUE TO STORM DAMAGE |
Permits
Parcel Number - 133121070
Date - 08/19/2026 10:28 a.m.
Total Number Of Permits - (3)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-RES-0923-07748 | Withdrawn | 09/04/2023 | 04/14/2024 | Residential Building - One or Two Family | Demo the old ITE loadcenter and meter can, drive 2 new 5/8 inch grounding rods, and install new 200 amp main breaker nema 3r loadcenter with a new tep approved meter can. Run #4 bare copper to both grounding rods to the ground bar in the 200 amp loadcenter, then run #6 bare copper to the water/gas lines. I will cut the existing .5 inch pvc down then add a nema 3r single gang jbox to rerun with .5 inch emt to the 200 amp loadcenter. I will add all correct appropriate size overcurrent protection devices (breakers). | |
| T09PL00872 | Final | 05/18/2009 | 11/18/2009 | PLUMB | REPL GAS LINE (REMOVE BRANCH & CAP) | |
| T22RW00435 | Final | 02/08/2022 | 05/07/2022 | ROW | REPLACING PED AND APPROX. 185' LF OF CABLE IN REAR ALLEY. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |