Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel141390020
JurisdictionTucson
City of Tucson ZoningR-1
Airport Environs Zone

NCD-A Davis Monthan AEZ Paddle

,

Tucson International AEZ Paddle

Tucson WardWard 4
Tucson Registered NeighborhoodRita Ranch
Major Streets & Routes

Gateway Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Permits

Parcel Number - 141390020
Date - 12/23/2024 3:54 a.m.
Total Number Of Permits - (353)
Permit Permit Status Entered Date Expired Date Unit Type Description
TD-DEV-0424-00110 Inspections 04/01/2024 11/15/2027 Development Package **Restricted Records** - Proposed development of a new Chase Bank and associated site improvements - grading and drainage, paving, and site utilities. Development will be on a portion of parcels 141390010, 141390020, and 14139003A that will be combined as part of a block plat (to be completed by others). There will be an adjacent homes development to the south, under separate plan by others, as well as an associated block plat for the Chas Bank Site, parcel(s) to the east of the proposed Chase Bank, and parcels to the south that will encompass the homes development.
DP19-0156 Complete 06/25/2019 03/09/2022 Development Package GRADING/SWPPP - Encantada at Rita Ranch, constr. yard, clearing and grubbing.
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 17 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 18 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 100 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 110 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 112 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 118 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 120 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 124 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 130 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 136 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 140 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 142 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 150 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 160 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 166 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 172 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 178 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 184 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 188 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 196 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TD-DEV-1223-00493 Awaiting submittal 12/22/2023 N/A Development Package Development Package for an FLD subdivision consisting of 48 residential lots and Common Areas "A" (private streets) & "B-1" thru "B-3" (open space, drainage, utilities and landscape).

Plans

Parcel Number - 141390020
Date - 12/23/2024 3:54 a.m.
Total Number Of Plans - 5
Plan Number Plan Status Application Date Expired Date Unit Type Description
TD-DIV-0124-00001 Needs resubmittal 01/05/2024 N/A Land Division 3 Block Commercial Plat - Replat of Lots 1, 2, 3, & a portion of Lot 4, Lots 13 thru 19 and a portion of Common Area "A" of Village Center at Rita Ranch Bk 65, Pg 21.
TD-DIV-0524-00045 Complete 05/21/2024 N/A Land Division Lot line reconfiguration of Lots 1 and 2 of the Village Center at Rita Ranch Final Plat.
TP-PRE-0723-00278 Complete 07/26/2023 N/A Pre-Application Pre-Submittal application for Valencia Nexus development. Existing parcels to be combined in block plat to be sold and developed under separate documents.
TP-PRE-1023-00356 Complete 10/15/2023 N/A Pre-Application Pre-Application Conference for proposed 48-lot single-family detached Flexible Lot Design subdivision
T22PRE0179 Closed 08/12/2022 N/A NEIGHBORHOOD NOTIFICATION Block Plat: Villa Valencia. Multi-family housing and commercial/retail. Lot combination and replat.