Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 141362070
Parcel Search
Annexations & Original City Zoning (OCZ)
Date - 12/23/2024 7:32 a.m.
Total Number Of OZC Plans - (1)
Rezoning Cases
Date - 12/23/2024 7:32 a.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date | Address |
---|---|---|---|---|---|
C9-99-SP-7 | La Estancia PAD - Wilmot Road | PAD-7 | Effectuated | 04/07/2009 | E VIA BOCA CHICA |
Permits
Parcel Number - 141362070
Date - 12/23/2024 7:32 a.m.
Total Number Of Permits - (6)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-SOL-1224-00803 | Withdrawn | 12/04/2024 | 06/03/2025 | Solar | PV INSTALL Due to the fact that this project may be within a regulated floodplain and requires a Floodplain Use Review (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP. | |
TC-SOL-1224-00810 | Inspections complete | 12/05/2024 | 06/09/2025 | Solar | pv install | |
TE-FPU-1224-00435 | Void | 12/05/2024 | N/A | Floodplain Use | PV INSTALL | |
T16BU00560 | Expired | 04/19/2016 | 11/14/2016 | WALL/FEN | BLOCK WALL W/RETAINING | |
T17CM01099 | Final | 02/09/2017 | 12/11/2017 | COMBO | SFR PLAN1870 T16-M0010 | |
T17RW01831 | Final | 04/28/2017 | 07/07/2017 | ROW | La Estancia, Lot 207, install approximately 45' of 5' sidewalk and driveway apron SEE T17RW01829 FOR BARRICADING |